Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 32558: 200714900 EXP NONNATIVE FISH SUPPRESSION
Project Number:
Title:
Non-Native fish Suppression
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
32558
Contract Title:
200714900 EXP NONNATIVE FISH SUPPRESSION
Contract Continuation:
Previous: Next:
n/a
  • 38936: 2007-149-00 EXP NONNATIVE FISH SUPPRESSION
Contract Status:
Closed
Contract Description:
Non-native salmonids are impacting native salmonid populations throughout the Pend Oreille Subbasin. Competition, hybridization, and predation by non-native fish have been identified as primary factors in the decline of some native bull trout and cutthroat trout populations. Therefore, the goal of this project is to implement actions to suppress or eradicate non-native fish in areas where native populations are declining or have been extirpated. These projects have previously been identified as critical to recovering native bull trout and westslope cutthroat trout (WCT).

Lower Graham Creek was invaded by non-native rainbow and brook trout after a small dam failed in 1991. By 2003, no genetically pure WCT remained in the lower 700 m of Graham Creek. Further invasion upstream is currently precluded by a relatively short section of steep, cascade-pool stepped channel section that will likely be breached in the near future. In 2007,  a fish management structure will be constructed at the mouth of Graham Creek to preclude further invasion of non-native fish into Graham Creek.  The construction of the barrier,will be followed by intensive electrofishing 700 m upstream to remove and relocate all captured fish.  

Westslope cutthroat trout have recently been extirpated in Cee Cee Ah Creek due to displacement by brook trout. We propose treating Cee Cee Ah Creek with antimycin to eradicate brook trout. Once eradication is complete, cutthroat trout will be translocated from nearby watersheds.  A proposed antimycin treatment within the subbasin has been met with public opposition in the past.  However,  little public education or involvement in the planning process was conducted prior to the planned implementation.  Therefore, much of the effort in 2007 will made towards public education and involvement in implementing antimycin and other native fish recovery actions.
Account Type(s):
Expense
Contract Start Date:
05/01/2007
Contract End Date:
07/31/2008
Current Contract Value:
$218,748
Expenditures:
$191,883

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Todd Andersen Kalispel Tribe Yes Contract Manager tandersen@knrd.org (509) 447-7245
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Jason Connor Kalispel Tribe Yes Technical Contact jconnor@knrd.org (509) 447-7285
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Joe Maroney Kalispel Tribe Yes Supervisor jmaroney@knrd.org (509) 447-7272
Carlos Matthew Bonneville Power Administration Yes COR cjmatthew@bpa.gov (503) 230-3418
Jason Olson Kalispel Tribe Yes Technical Contact jolson@knrd.org (509) 447-7290
Virgil Watts III Bonneville Power Administration Yes Interested Party vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Permits A: 165. Obtain HPA and Other Environmental Documents 06/01/2008 06/30/2008
Fish Eradication Public Education/Outreach Process B: 99. Native Fish Recovery Education and Outreach 04/30/2008 06/15/2008
Design for Graham Creek barrier. C: 175. Graham Creek Fish Management Structure Design 08/15/2007 08/01/2007
Graham Creek Fish Management Structure D: 184. Graham Creek Fish Management Structure Installation 07/31/2008 07/28/2008
Electrofishing Removals E: 190. Lower Graham Creek Electrofishing Removals 10/31/2007 09/28/2007
Funding Package, September Accrual Estimate. F: 119. Project Management 02/01/2008 05/01/2008
Final report uploaded to the BPA website G: 132. Submit Annual Report for the period May 2007 to April 2008 07/31/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain HPA and Other Environmental Documents 02/09/2007
B 99 Native Fish Recovery Education and Outreach 02/09/2007
C 175 Graham Creek Fish Management Structure Design 02/09/2007
D 184 Graham Creek Fish Management Structure Installation 09/19/2007
E 190 Lower Graham Creek Electrofishing Removals 04/17/2007
F 119 Project Management 02/09/2007
G 132 Submit Annual Report for the period May 2007 to April 2008 02/09/2007
H 185 Periodic Status Reports for BPA 02/09/2007