Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 32726: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Project Number:
Title:
Walla Walla River Basin Fish Habitat Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
32726
Contract Title:
1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Contract Continuation:
Previous: Next:
26728: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
  • 37431: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Contract Status:
Closed
Contract Description:
The CTUIR Walla Walla River Basin Fish Habitat Enhancement Project, initiated in 1996, is an ongoing effort to protect, enhance, and restore riparian and instream habitat for natural production of anadromous salmonids in the Walla Walla River Subbasin.  Proposed activities will focus on the restoration of critical riparian, floodplain, and channel characteristics necessary to enhance populations of salmonid fish species.  The Project's 2007 focus will be two priority reaches of the basin, the South Fork of the Walla Walla River, and the South Fork of the Touchet River. Within the South Fork of the Touchet River (Rainwater Wildlife Area) the project proposes to meet limiting factors identified in the Subbasin Plan through the placement of LWD and road obliteration.  This work will be done in coordination with the BPA funded Rainwater project (BPA Project 200002600). Two additional projects are planned for the mainstem Walla Walla River and will include pool enhancement and riparian and upland restoration.  The project is also proposing to continue operations and maintenance (on 10 streams miles of existing project areas) and project effectiveness monitoring.
Account Type(s):
Expense
Contract Start Date:
04/01/2007
Contract End Date:
03/31/2008
Current Contract Value:
$315,149
Expenditures:
$281,901

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) No Administrative Contact julieburke@ctuir.org (541) 429-7292
Billy Goodrich Umatilla Confederated Tribes (CTUIR) Yes Technical Contact billygoodrich@ctuir.org (541) 966-2383
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Carl Keller Bonneville Power Administration No Env. Compliance Lead cjkeller@bpa.gov (503) 230-7692
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Paul Rabb Umatilla Confederated Tribes (CTUIR) No Administrative Contact paulrabb@ctuir.org (541) 429-7165
Michelle Thompson Umatilla Confederated Tribes (CTUIR) No Administrative Contact michellethompson@ctuir.org (541) 429-7227
Jed Volkman Umatilla Confederated Tribes (CTUIR) Yes Contract Manager jedvolkman@ctuir.org (541) 429-7539
Jim Webster Umatilla Confederated Tribes (CTUIR) No Supervisor jameswebster@ctuir.org (541) 429-7240


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental clearance complete A: 165. McCain-South Fork Walla Walla Instream (WE 'R') 08/14/2007 08/01/2007
Environmental compliance complete B: 165. Compliance for WEs D, H, J, K, and O 01/31/2008 03/28/2008
all project admin activities managed C: 119. Conduct all management activities 03/31/2008 03/28/2008
healthy, weed free vegetation D: 22. Control noxious weeds, replant veg within project areas 12/28/2007 12/28/2007
none E: 189. Coordinate with other agencies 03/31/2008 03/28/2008
Completed design for instream work at RM 50 F: 175. Develop instream design for RM 50-McCains 05/30/2007 05/30/2007
Project engineering and design G: 175. Develop instream design- RM 52-Bullock 03/17/2008
Data collection process complete H: 157. Field Data Collection 03/31/2008 03/31/2008
Project list developed and submitted I: 114. Identify and select projects in Walla Walla Basin 03/15/2008 03/15/2008
Project summaries complete J: 115. Inventory project areas 07/30/2007 06/30/2007
fences returned to full functionality K: 186. Maintain Fences 03/31/2008 06/30/2007
Improved passage for juvenile and adult fish on Mill Creek. L: 119. Manage remaining instream work at Gose St. 03/28/2008
20006 Annual reports submitted N: 132. Produce 2006 final and 2007 draft annual reports 09/30/2007 01/02/2008
Approximately 13 acres reestablished with native plants O: 47. SFWW River Mile 5-Kentch 10/25/2007 10/25/2007
Structure installation complete P: 29. Instream work at RM 50-McCains 09/30/2007 08/29/2007
data analysis complete Q: 162. Field Data Analysis 03/31/2008 03/31/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
All Anadromous Fish
  • 1 instance of WE 162 Analyze/Interpret Data
All Anadromous Salmonids
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 McCain-South Fork Walla Walla Instream (WE 'R') 02/09/2007
B 165 Compliance for WEs D, H, J, K, and O 02/09/2007
C 119 Conduct all management activities 02/09/2007
D 22 Control noxious weeds, replant veg within project areas 06/28/2007
E 189 Coordinate with other agencies 02/09/2007
F 175 Develop instream design for RM 50-McCains 02/09/2007
G 175 Develop instream design- RM 52-Bullock 02/09/2007
H 157 Field Data Collection 02/09/2007
I 114 Identify and select projects in Walla Walla Basin 02/09/2007
J 115 Inventory project areas 02/09/2007
K 186 Maintain Fences 02/09/2007
L 119 Manage remaining instream work at Gose St. 02/09/2007
M 185 Periodic Status Reports for BPA 02/09/2007
N 132 Produce 2006 final and 2007 draft annual reports 02/09/2007
O 47 SFWW River Mile 5-Kentch
P 29 Instream work at RM 50-McCains 06/21/2007
Q 162 Field Data Analysis 02/09/2007