SOW Report
Contract 32737: 199505702 EXP RUDEEN RANCH/INDIAN SPRINGS WILDLIFE MITIGTION
Project Number:
Title:
Shoshone-Bannock Wildlife Mitigation Projects
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
32737
Contract Title:
199505702 EXP RUDEEN RANCH/INDIAN SPRINGS WILDLIFE MITIGTION
Contract Continuation:
Previous: Next:
29751: 1995-057-02 EXP RUDEEN RANCH/INDIAN SPRINGS WILDLIFE MITIGTION
  • 38573: 1995-057-02 RUDEEN RANCH/ INDIAN SPRINGS WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
Background:

The Rudeen Ranch property is a 2,450-acre parcel that includes sage steppe, coniferous woodland, and aspen grove habitats.  It was purchased in conjunction with the Southern Idaho Wildlife Mitigation Project (NWPPC proposal 1995-057-02).  This acquisition is estimated to provide BPA with 2,002 habitat units (HUs) of mitigation credit toward the Minidoka (1,596 HUs) and Palisades (406 HUs) wildlife mitigation debt.  A breakdown of HUs by target species follows:

Species Habitat Units Hydropower Project
Ruffed Grouse 317 Palisades
Wintering Bald Eagle 89 Palisades
Mule Deer 1596 Minidoka

Location:

The Rudeen Ranch project is located in Power County Idaho approximately 7 miles southeast of American Falls, Idaho.  It includes portions of Sections 25, 27, 34, 35, and 36 Township 8 South, Range 31 East, portions of Section 30, Township 8 South, Range 32 East, portions of Sections 1, 2, 10, 11, 12 and 13, Township 9 South, Range 31 East, and portions of Sections 5 and 8, Township 9 South, Range 32 East. The project totals 2,450.38 acres.

Project Goal:

The Shoshone-Bannock Tribes will continue to work with IDFG and BLM to finalize off-road vehicle management plans for the property.  Native plant restoration, noxious weed control and fencing activities will continue to protect and enhance the wildlife habitat values on the property.
Account Type(s):
Expense
Contract Start Date:
05/01/2007
Contract End Date:
05/31/2008
Current Contract Value:
$121,095
Expenditures:
$121,095

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Douglas Corkran Bonneville Power Administration No Env. Compliance Lead dfcorkran@bpa.gov (503) 230-7646
Aren Eddingsaas Shoshone-Bannock Tribes Yes Technical Contact aeddingsaas.sbtribes@gmail.com (208) 239-4577
Michael Haddix Shoshone-Bannock Tribes Yes Contract Manager mhaddix@sbtribes.com (208) 239-4558
Steve Hagler Shoshone-Bannock Tribes No Administrative Contact shagler@sbtribes.com (208) 478-3843
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819
Dorothy Welch Bonneville Power Administration Yes COR dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of EC documentation/clearance from BPA A: 165. Satisfy environmental compliance requirements 04/30/2008 04/29/2008
Complete project administration B: 119. Administration of contracts and subcontracts 05/31/2008
Complete plantings C: 47. Restore native plants 05/31/2008 04/29/2008
Complete weed removal D: 53. Remove noxious weeds 05/31/2008 04/29/2008
Complete fence installation E: 40. Install fence to establish property boundary and protect wildlife 04/30/2008 10/29/2007
Complete habitat monitoring F: 157. Conduct habitat monitoring 12/01/2007 12/01/2007
Complete Longterm ORV Management Plan G: 174. Collaborate with IDFG and BLM on the development of ORV management plans 05/31/2008
Complete 2005 (May 2005 - April 2006) Annual Report H: 132. Complete 2005 annual report for period May 1, 2005 to April 30, 2006 08/31/2007
Complete 2006 (May 2006 - April 2007) Annual Report I: 132. Complete 2006 annual report for period May 1, 2006 to April 30, 2007 08/31/2007
Submit draft of 2007 (May 2007 - April 2008) report J: 132. Submit draft of 2007 annual report for period May 1, 2007 to April 30, 2008 05/31/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Satisfy environmental compliance requirements 02/09/2007
B 119 Administration of contracts and subcontracts 02/09/2007
C 47 Restore native plants 02/09/2007
D 53 Remove noxious weeds 02/09/2007
E 40 Install fence to establish property boundary and protect wildlife 02/09/2007
F 157 Conduct habitat monitoring 02/09/2007
G 174 Collaborate with IDFG and BLM on the development of ORV management plans 02/09/2007
H 132 Complete 2005 annual report for period May 1, 2005 to April 30, 2006 02/09/2007
I 132 Complete 2006 annual report for period May 1, 2006 to April 30, 2007 02/09/2007
J 132 Submit draft of 2007 annual report for period May 1, 2007 to April 30, 2008 02/09/2007
K 185 Periodic Status Reports for BPA 02/09/2007