Contract 37369: 1996-020-00 EXP PSMFC CSS COMPONENT
Project Number:
Title:
Comparative Survival Study (CSS)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
37369
Contract Title:
1996-020-00 EXP PSMFC CSS COMPONENT
Contract Continuation:
Previous: Next:
25634: 1996-020-00 EXP PSMFC CSS COMPONENT
  • 40338: 199602000 EXP PSMFC CSS COMPONENT 09
Contract Status:
Closed
Contract Description:
The Comparative Survival Rate Study (CSS) is a multi-year program of the fishery agencies and tribes to measure the smolt-to-adult survival rates of hatchery and wild spring/summer Chinook and steelhead from representative sites in the Snake, Mid-Columbia, and lower Columbia River basins.  An interagency CSS Oversight Committee oversees the design, execution, and analysis of this study.  The CSS is entering its ninth year of operation.  In addition to hatchery and wild Chinook being PIT tagged, the CSS planned to begin PIT tagging in 2006 hatchery steelhead at two locations in the Snake River and re-establish a PIT tagged hatchery spring Chinook in the Mid-Columbia River; however, BPA declined funding the additional PIT tagging within the CSS contract due to monetary shortfalls.  Additional PIT tagged groups of hatchery steelhead had been recommended by the Pacific Northwest Power Planning Council's Independent Scientific Review Committee during its review of the CSS in 1998.  Wild Chinook and steelhead PIT tagged for other studies in the Snake River basin and lower Columbia River basin will be utilized whenever possible to meet CSS requirements.  

Smolt-to-adult survival rates for Snake River basin wild and hatchery Chinook and wild steelhead that were transported will be compared with those that migrated in-river to below Bonneville Dam.  Estimates of smolt-to-adult survival rates will be made from Lower Granite Dam back to Lower Granite Dam (Snake River stocks), Bonneville Dam back to Bonneville Dam (all stocks), and hatchery back to the hatchery racks (all stocks).  In addition, migration speed and conversion rates will be made for returning adult fish between dams with adult detectors present (e.g., Bonneville, McNary, Lower Granite, and Rock Island dams).  The returns to the hatchery rack will be adjusted for any sport and tribal harvest to provide an estimate of total return to the hatchery.  These survival rates may be used in the evaluations of smolt mitigation measures such as flow augmentation, spill, and transportation for the recovery of listed salmon stocks.  

For this study, hatchery Chinook are sampled from regular hatchery production and implanted with a PIT (Passive Integrated Transponder) tag, which allows unique identification of each fish.  The wild Chinook and wild steelhead are sampled at tributary traps in the Snake River basin and also PIT tagged.  When PIT tagged study fish arrive at a transportation collector dam and enter the collection/bypass channel for the first time, a predetermined proportion will be purposely routed to the raceways for transportation while the remaining study fish will be routed back to the river for use in-river survival estimation with the Cormack-Jolly-Seber capture-recapture method.

The CSS is designed to address the following objectives:  (i) estimate the smolt-to-adult survival rate (SAR) for transported wild and hatchery stream type Chinook and Steelhead;      (ii) determine if SAR rates are significantly different from the interim SAR hydro goal;   (iii) compare the SARs of transported and downriver indicator stocks; and (iv) estimate transport/control ratios and in-river survival concurrently over a number of years in order to span a wide range of environmental conditions.
Account Type(s):
Expense
Contract Start Date:
03/01/2008
Contract End Date:
11/30/2008
Current Contract Value:
$120,556
Expenditures:
$120,556

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
ESA applications and permits. A: 165. ESA Permit 03/17/2008 03/17/2008
2009 SOW, Budget & financial information B: 119. IDFG Subcontract Administration 11/28/2008 11/20/2008
Pit Tag Steelhead & Chinook C: 158. IDFG PIT tag steelhead & chinook at Rapid River & McCall Hatcheries 11/28/2008 11/20/2008
Trap Installation D: 70. IDFG Installation of Clearwater River Fish Trap 03/31/2008 03/31/2008
PIT Tag wild Chinook and Steelhead E: 158. IDFG PIT Tag Wild Spring Chinook and Wild Steelhead at Clearwater Trap 06/13/2008 06/13/2008
PIT Tag Wild Chinook F: 158. IDFG PIT Tag Wild Spring/Summer Chinook at the Snake River Trap 06/13/2008 06/13/2008
PIT Tag Wild Spring Chinook G: 158. IDFG PIT Tag Wild Spring/Summer Chinook at the Salmon River Trap 06/09/2008 06/09/2008
Operate traps H: 157. IDFG Rapid River & McCall Hatcheries, Snake, Salmon & Clearwater Traps 11/28/2008 11/20/2008
Tagging Status and Adult Return Report Completed by IDFG I: 162. IDFG Hatcheries mark group data 11/28/2008 11/20/2008
Uploading & submission of data J: 159. IDFG Submit files to PTAGIS database 11/28/2008 11/20/2008
2009 SOW and Budget, Invoice/financial information K: 119. ODFW Subcontracts Administration 11/28/2008 11/20/2008
PIT Tag Chinook L: 158. ODFW Lookingglass Hatchery - PIT tag Chinook 10/06/2008 10/06/2008
Collect and tag wild Chinook M: 158. ODFW Lower Grande Ronde River Trap - PIT tag wild Chinook 06/13/2008 06/13/2008
Survival Report Completed by ODFW N: 162. ODFW Lookingglass Hatchery Migration Survival Data 11/28/2008 11/20/2008
Monitor and record tag loss & mortality O: 157. ODFW Lookingglass Hatchery (Imnaha & Catherine Creek Stocks) & Grand Ronde River Trap 11/19/2008 11/19/2008
Upload files to PTAGIS P: 159. ODFW submit Files for Lookingglass and Lower Grande Ronde River Trap to PTAGIS database 11/28/2008 11/20/2008
Successful Administration of Contract Q: 119. PSMFC & FPC Administration 11/30/2008 11/20/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 ESA Permit 02/09/2007
B 119 IDFG Subcontract Administration 02/09/2007
C 158 IDFG PIT tag steelhead & chinook at Rapid River & McCall Hatcheries 01/30/2008
D 70 IDFG Installation of Clearwater River Fish Trap 02/05/2008
E 158 IDFG PIT Tag Wild Spring Chinook and Wild Steelhead at Clearwater Trap 03/17/2008
F 158 IDFG PIT Tag Wild Spring/Summer Chinook at the Snake River Trap 03/17/2008
G 158 IDFG PIT Tag Wild Spring/Summer Chinook at the Salmon River Trap 03/17/2008
H 157 IDFG Rapid River & McCall Hatcheries, Snake, Salmon & Clearwater Traps 02/05/2008
I 162 IDFG Hatcheries mark group data 02/09/2007
J 159 IDFG Submit files to PTAGIS database 02/09/2007
K 119 ODFW Subcontracts Administration 02/09/2007
L 158 ODFW Lookingglass Hatchery - PIT tag Chinook 01/30/2008
M 158 ODFW Lower Grande Ronde River Trap - PIT tag wild Chinook 02/05/2008
N 162 ODFW Lookingglass Hatchery Migration Survival Data 02/09/2007
O 157 ODFW Lookingglass Hatchery (Imnaha & Catherine Creek Stocks) & Grand Ronde River Trap 02/05/2008
P 159 ODFW submit Files for Lookingglass and Lower Grande Ronde River Trap to PTAGIS database 02/09/2007
Q 119 PSMFC & FPC Administration 02/09/2007
R 132 CSS Annual Report 3/3/2008 to 11/28/08 02/09/2007
S 185 Periodic Status Reports for BPA 02/09/2007