SOW Report
Contract 38971: 199900301 EXP PSMFC CHUM SPAWNING BELOW 4 LOWER DAMS
Project Number:
Title:
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Mainstem Dams
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
38971
Contract Title:
199900301 EXP PSMFC CHUM SPAWNING BELOW 4 LOWER DAMS
Contract Continuation:
Previous: Next:
34890: 199900301 EXP PSMFC CHUM SPAWNING BELOW 4 LOWER DAMS
  • 44312: 1999-003-01 EXP PSMFC CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Status:
Closed
Contract Description:
PROJECT TITLE: Evaluate spawning of chum salmon just below the four lowermost Columbia River mainstem dams.

PROJECT GOAL:  The continuing purpose of this on-going project is to assess the extent of spawning by ESA-listed chum salmon in the mainstem Columbia River so that the Federal Columbia River Power System (FCRPS) can be managed to protect and enhance these important populations.  Our primary focus is to determine what conditions must exist to provide successful spawning and rearing below mainstem dams and what measures must be taken to protect those fish.

PROJECT OBJECTIVES:  Continued implementation of this project will result in an improved understanding of the relationship between operation of the FCRPS and protection of mainstem spawning salmon populations.  Funding will allow continued in-season management of the hydrosystem, reducing harm to mainstem spawning and incubation.  We have developed a series of tasks designed to inform regional fish managers regarding status and trends of mainstem spawning populations of chum salmon.  These tasks will allow us to collect and report on abundance and productivity metrics, spatial structure, and genetic diversity that are essential for describing population viability and trends in abundance.  They will further our understanding of the spawning habitat requirements for these fish, especially as they relate to hydrosystem operation.  

PROJECT OBJECTIVE 1 - Chum Spawning Ground Surveys in mainstem

PROJECT OBJECTIVE 2 - Describe chum spawning population characteristics in the mainstem

PROJECT OBJECTIVE 3 - Chum Salmon Abundance Estimates
Account Type(s):
Expense
Contract Start Date:
10/01/2008
Contract End Date:
09/30/2009
Current Contract Value:
$175,612
Expenditures:
$175,612

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
NEPA and Endangered Species Act Compliance A: 165. NEPA and Endangered Species Act Compliance 09/30/2009 09/30/2009
Chum Spawning Ground Surveys in mainstem B: 157. Chum Salmon Spawning Ground Surveys in the mainstem 09/30/2009 09/30/2009
Describe chum spawning population characteristics in the mainstem C: 162. Describe Spawning Population Characteristics for Chum Salmon in the Mainstem Columbia 09/28/2009 08/21/2009
Chum Salmon Spawning Ground Survey Data Exchange D: 161. Chum Salmon Spawning Ground Survey Data Exchange 09/30/2009 09/30/2009
Chum Salmon Abundance Estimates E: 162. Chum Salmon Abundance Estimates 09/30/2009 08/21/2009
Complete all project/contract management requirements F: 119. Manage and administer Project 1999-003-01 09/30/2009 09/30/2009
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period Oct 2007 to Sep 2008 01/31/2009 10/01/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA and Endangered Species Act Compliance 02/09/2007
B 157 Chum Salmon Spawning Ground Surveys in the mainstem 02/09/2007
C 162 Describe Spawning Population Characteristics for Chum Salmon in the Mainstem Columbia 02/09/2007
D 161 Chum Salmon Spawning Ground Survey Data Exchange 02/09/2007
E 162 Chum Salmon Abundance Estimates 02/09/2007
F 119 Manage and administer Project 1999-003-01 02/09/2007
G 132 Submit Progress Report for the period Oct 2007 to Sep 2008 02/09/2007
H 185 Periodic Status Reports for BPA 02/09/2007