Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 39204: 1988-053-03 EXP CTWS HOOD RIVER M&E
Project Number:
Title:
Hood River Production Program Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
39204
Contract Title:
1988-053-03 EXP CTWS HOOD RIVER M&E
Contract Continuation:
Previous: Next:
34865: 198805303 EXP CTWS HOOD RIVER M&E
  • 43767: 1988-053-03 EXP CTWS HOOD RIVER M&E
Contract Status:
Closed
Contract Description:
Fisheries Program Manager:  Brad Houslet (541) 553-2039
Fiscal Officer: Arthur Mitchell (541) 553-3219
Hood River Production Program Manager: Chris Brun (541) 352-3548
Technical Contact: Ryan Gerstenberger (541) 352-9326
Address: 6030 Dee Highway, Parkdale, OR 97041

The CTWSRO Hood River Production Program staff will conduct monitoring and evaluation of the existing spring Chinook salmon supplementation program. Activities include determining pre-release smolt quality, out migration timing, duration and residualism. Adult spawning locations, timing and success will be monitored. Run size predictions, harvest recommendations and tribal harvest monitoring will be implemented during FY 09. Project staff will assist ODFW with monitoring of summer/winter steelhead supplementation activities by PIT tagging a portion of pre-release smolts and post-spawning kelts. Cumulative project data will be synthesized and results analyzed.  Funds from this project will be used to support ODFW M&E efforts that are essential to completion of HRPP tasks, specifically staffing fall migrant trap operation and replacing worn equipment.  

Additionally the CTWSR HRPP will plan for future M&E activities in light of the removal of Powerdale dam in 2010 and completion of the revised HRPP Master Plan. This will include: refining the M&E plan identified in the revised master plan and updated HGMP; determining  best methods for natural-origin return (NOR) pre-smolt abundance/distribution monitoring and determining adult run timing of spring Chinook salmon and winter steelhead past planned trapping sites.
Account Type(s):
Expense
Contract Start Date:
10/01/2008
Contract End Date:
09/30/2009
Current Contract Value:
$412,996
Expenditures:
$412,996

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
20,500 PIT tagged steelhead and spring Chinook salmon. B: 158. PIT tag steelhead and spring Chinook salmon 09/30/2009 09/30/2009
Temperature data at 6 locations C: 157. Collect temperature data in the Hood River subbasin 09/30/2009 09/30/2009
All fish salvage activities complete D: 28. Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody 12/29/2008 12/29/2008
BY 08- 09 spawning distribution and condition. E: 157. Spring Chinook and winter steelhead spawning surveys 09/30/2009 09/30/2009
Acclimation data F: 157. Collect data during acclimation 05/30/2009 05/30/2009
Submit PIT tag codes to PTAGIS database. G: 159. Input Hood River PIT tag data to appropriate databases 06/20/2009 06/12/2009
Estimate of tribal harvest of spring Chinook in Hood River H: 157. Spring Chinook salmon run forecast and harvest creel 09/30/2009 09/30/2009
Provide reports to BPA as appropriate I: 191. Hood River Production Program Coordination 09/30/2009 09/30/2009
Submit 2010 SOW to BPA for environmental compliance review. J: 165. Ensure environmental compliance is adequate 07/31/2009 07/31/2009
2008 Final Report uploaded to Pisces K: 132. Annual Report 08/31/2009 08/31/2009
Project administration & coordination complete L: 119. Manage Project 09/30/2009 09/30/2009
Radio tag and track movements of BY 09 spring Chinook salmon and winter steelhead. M: 157. Determine spring Chinook and winter steelhead run timing. 09/30/2009 09/30/2009
HRPP Spring Chinook M&E Operational Plan N: 156. HRPP Revised M&E Operational Plan 08/28/2009
Develop preferred pre-smolt capture methods for long-term monitoring O: 157. Develop chinook pre-smolt sampling technique 09/30/2009 09/30/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 158 PIT tag steelhead and spring Chinook salmon 09/03/2008
C 157 Collect temperature data in the Hood River subbasin 09/03/2008
D 28 Salvage and transport fish entrained in irrigation canals to nearest free-flowing waterbody 09/03/2008
E 157 Spring Chinook and winter steelhead spawning surveys 09/03/2008
F 157 Collect data during acclimation 09/03/2008
G 159 Input Hood River PIT tag data to appropriate databases 02/09/2007
H 157 Spring Chinook salmon run forecast and harvest creel 09/03/2008
I 191 Hood River Production Program Coordination 02/09/2007
J 165 Ensure environmental compliance is adequate 02/09/2007
K 132 Annual Report 02/09/2007
L 119 Manage Project 02/09/2007
M 157 Determine spring Chinook and winter steelhead run timing. 03/31/2009
N 156 HRPP Revised M&E Operational Plan 02/09/2007
O 157 Develop chinook pre-smolt sampling technique 03/31/2009