Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 39652: 199401806 EXP TUCANNON STREAM AND RIPARIAN R
Project Number:
Title:
Tucannon Stream and Riparian Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
39652
Contract Title:
199401806 EXP TUCANNON STREAM AND RIPARIAN R
Contract Continuation:
Previous: Next:
20114 REL 4: 199401806 EXP TUCANNON STREAM AND RIPARIAN R
  • 44443: 199401806 EXP TUCANNON STREAM AND RIPARIAN REST
Contract Status:
Closed
Contract Description:
Implement habitat protection, enhancement, and recovery strategies to support Subbasin Plan identified ESA focal, cultural significant and species of interest recovery in the Tucannon Subbasin.
Tucannon Stream and Riparian Protection, Enhancement, and Restoration Project, implemented by the Columbia Conservation District, will address riparian recovery/maintenance and instream habitat quantity and diversity, the primary aquatic habitat limiting attributes identified thru EDT analysis in the Tucannon Subbasin.

Riparian recovery/maintenance, a critical management objective, addressing the broadest diversity of limiting attributes in identified priority restoration and protection geographic areas will be addressed through CREP contract time extensions. Biological objective diversity, reduced embeddedness, LWD recruitment, primary pools, riparian recovery, and temperature addressed with this strategy, benefit ESA and cultural significant focal species, spring and fall Chinook, steelhead and bull trout, during their respective key life stages throughout the watershed.  Accumulated restoration/protection geographic areas, Pataha/Marengo thru Mountain Tucannon matches NOAA’s Major Spawning Aggregation designation, (MSA), Pataha/Marengo to Tucannon Mouth and Lower Pataha match NOAA’s Minor Spawning Aggregation designations (mSA).
Instream habitat quantity and diversity project focus is within identified priority restoration geographic areas, Pataha/Marengo thru Mountain Tucannon (NOAA MSA).  Projects, implementing identified strategies, address various biological objectives; sediment reduction, primary pools and LWD recruitment/placement.  Project implementation will provide habitat benefits to spring Chinook, steelhead and bull trout during their respective varied life stage needs within the MSA.

Program administration functions include contract reporting requirements, participation and coordination with regional recovery and resource management planning efforts, Snake River Salmon Recovery Plan, Washington Department of Ecology 2514 Watershed and TMDL planning, regional M&E planning and Subbasin Plan evaluation and adaptive management planning, project scoping, planning and implementation management.
Monitoring and evaluation efforts for projects and watershed conditions will be a cooperative approach with contract service with USFS, Pomeroy Ranger District and local WDFW staff.  A coordinated M&E effort is being developed between co-managers to reduce duplication in effort and cost and develop consistency in the methodology and protocols on a regional scale.
Account Type(s):
Expense
Contract Start Date:
10/01/2008
Contract End Date:
09/30/2009
Current Contract Value:
$327,195
Expenditures:
$327,195

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration No Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Sarah Branum Bonneville Power Administration Yes COR stbranum@bpa.gov (503) 230-5115
Terry Bruegman Columbia Conservation District (SWCD) No Supervisor tb-ccd@daytonwa.net (509) 382-4273x102
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Debra Nordheim Columbia Conservation District (SWCD) Yes Contract Manager dn-ccd@daytonwa.net (509) 382-4273x101


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Projects managed well B: 119. Project implementation 09/30/2009 09/30/2009
List of viable Habitat Enhancement projects for potential implementation. C: 114. Develop and/or update potential project lists 09/30/2009 09/30/2009
Meetings, tours, presentations D: 99. Community Involvement in Habitat Restoration 09/30/2009 09/30/2009
Documentation necessary for cultural and ESA compliance. E: 165. Project Environmental Compliance 09/30/2009
Annual Report F: 132. Annual Report 08/15/2009 11/15/2009
Design potential instream habitat improvements. G: 175. Instream Habitat improvement designs 07/10/2009
Sediment data collected H: 157. ISCO Sediment Sampling 09/30/2009 09/30/2009
CREP contract 10 year lease extension. I: 92. BLC 473 CREP 10 year Extension 06/04/2009 05/11/2009
CREP contract 10 year lease extension. J: 92. Kimble 658 CREP 10 year Extension 06/04/2009 06/05/2009
CREP contract 10 year lease extension. K: 92. Tucannon Ranch 495 CREP 10 year Extension 06/04/2009 04/13/2009
CREP contract 10 year lease extension. L: 92. Turner 496 CREP 10 year Extension 06/04/2009 05/14/2009
CREP contract 10 year lease extension. M: 92. Turner 497 CREP 10 year Extension 06/04/2009 05/14/2009
Install habitat structures N: 29. McVay Habitat Improvement 08/20/2009
Install habitat structures O: 29. Hovrud Habitat Improvement 08/20/2009
Collect and record pre-construction habitat characteristics P: 157. Instream pre-construction habitat measurements 09/30/2009 09/30/2009
Coordinate Tucannon Watershed Program to improve habitat Q: 191. Coordinate Tucannon Watershed Program 09/30/2009 09/30/2009
CREP contract second 5 year lease extension. R: 92. Hovrud 313 CREP 5 year Extension 09/02/2009 09/02/2009
CREP contract second 5 year lease extension. S: 92. Hovrud 316 CREP 5 year Extension 09/02/2009 09/02/2009
CREP contract second 5 year lease extension. T: 92. Howard 394 CREP 5 year Extension 09/02/2009 09/02/2009
CREP contract second 5 year lease extension. U: 92. Howard 395 CREP 5 year Extension 09/02/2009 09/02/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 9 instances of WE 92 Lease Land
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 9 instances of WE 92 Lease Land
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 9 instances of WE 92 Lease Land
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 Project implementation 02/09/2007
C 114 Develop and/or update potential project lists 02/09/2007
D 99 Community Involvement in Habitat Restoration 02/09/2007
E 165 Project Environmental Compliance 02/09/2007
F 132 Annual Report 02/09/2007
G 175 Instream Habitat improvement designs 02/09/2007
H 157 ISCO Sediment Sampling 02/07/2008
I 92 BLC 473 CREP 10 year Extension 02/09/2007
J 92 Kimble 658 CREP 10 year Extension 02/09/2007
K 92 Tucannon Ranch 495 CREP 10 year Extension 02/09/2007
L 92 Turner 496 CREP 10 year Extension 02/09/2007
M 92 Turner 497 CREP 10 year Extension 02/09/2007
N 29 McVay Habitat Improvement 02/09/2007
O 29 Hovrud Habitat Improvement 02/09/2007
P 157 Instream pre-construction habitat measurements 08/12/2009
Q 191 Coordinate Tucannon Watershed Program 02/09/2007
R 92 Hovrud 313 CREP 5 year Extension 08/12/2009
S 92 Hovrud 316 CREP 5 year Extension 08/12/2009
T 92 Howard 394 CREP 5 year Extension 08/12/2009
U 92 Howard 395 CREP 5 year Extension 08/12/2009