Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
40650
Contract Title:
199005500 EXP ID STEELHEAD M&E STUDIES
Contract Continuation:
Previous: Next:
36150: 199005500 EXP ID STEELHEAD M&E STUDIES
  • 45642: 1990-055-00 EXP ID STEELHEAD M&E STUDIES
Contract Status:
Closed
Contract Description:
In 2009, our monitoring activities will be similar to what was done in 2008.  We will install and operate a weir in Fish Creek to estimate steelhead escapement.  We will also collaborate with other Idaho Fish and Game weirs to estimate adult steelhead escapement in Rapid River, Pahsimeroi River, upper Salmon River (Sawtooth Weir), Red River and Crooked River.  We plan to run screw traps in Fish Creek, Rapid River, and Big Creek (Middle Fork salmon drainage) at Taylor Ranch.  Data from these traps will allow us to gather important life-history data (e.g., length and age of smolts, smolt migration patterns, and number of migrants) from a range of population types.   This juvenile and smolt life-history data will allow comparisons among streams.  We will assess juvenile steelhead abundance in selected tributary streams of the Clearwater and Salmon rivers.  The ISMES project will continue collecting continuous temperature data at over 40 locations within the Clearwater and Salmon rivers.  We plan to prepare manuscripts for peer reviewed journals that describe productivity of the Fish Creek population, a summarization of the supplementation work, and if time permits, a description of steelhead parr and smolt age and growth in Idaho streams.

ISMES cooperates with and complements the other projects in the Idaho Anadromous Natural Production Program (Idaho Supplementation Studies and Idaho Natural Production Monitoring & Evaluation Project) as well as research conducted by other resource management entities operating in areas upstream of Lower Granite Dam (LGD).  ISMES uses data from a variety of sources from the Snake River drainage that is upstream of LGD and accessible to anadromous salmonids. Collection of these data requires coordination and cooperation among numerous agencies and projects, e.g. the National Marine Fisheries Service (NMFS), the United States Forest Service (USFS), the Nez Perce Tribe (NPT), the Shoshone-Bannock Tribes (SBT), and the United States Fish & Wildlife Service (USFWS).  Internal IDFG cooperators include the Idaho Supplementation Studies (ISS, projects 198909800, 198909801, and 198909802), Lower Snake River Compensation Plan Evaluation, and Idaho Natural Production Monitoring & Evaluation Project (INPMEP project 1991-073-00), and IDFG regional fisheries biologists and managers.

In April of 2008, the scope of ISMES was amended by a Memorandum of Agreement between Bonneville Power and the State of Idaho for a period of 10 years. In the Memorandum, it was noted that additional monitoring is needed for Snake River steelhead, particularly B-run populations. The Memorandum directed that ISMES be modified to incorporate the objective of providing steelhead population status information. Pursuant to this directive, we conducted sampling of wild steelhead at Lower Granite Dam to determine genetic stock identification and age analysis for spawn year 2009. This work commenced in fall 2008 in cooperation with NOAA Fisheries personnel (project 200500200, Operation of the Lower Granite Dam Adult Trap) and is scheduled for completion in spring 2009. The goal is to assess feasibility of determining age structure and abundance by major drainages. Sampling will also be directed towards spawn year 2010 beginning in fall 2009.

PROJECT OBJECTIVES

Objective 1: Enumerate adult escapement, age, sex ratios, and run timing at index streams in the Clearwater/Salmon drainages and at Lower Granite Dam.
Objective 2:  Monitor juvenile steelhead abundance in tributaries of the Clearwater and Salmon drainages
Objective 3:  Estimate juvenile steelhead outmigration and timing in tributaries of the Clearwater and Salmon drainages
Objective 4:  Assess age and growth of steelhead juveniles and smolts from tributaries in the Clearwater and Salmon drainages.
Objective 5: Monitor smolt survival from tributary to Lower Granite Dam, through the hydro system, and to adult return.
Objective 6: Develop productivity metrics from wild steelhead stocks in Idaho.
Objective 7: Monitor temporal and spatial genetic patterns of steelhead populations in Idaho
Objective 8:  Monitor water temperatures in selected tributaries of the Clearwater and Salmon drainages.
Account Type(s):
Expense
Contract Start Date:
01/01/2009
Contract End Date:
12/31/2009
Current Contract Value:
$662,617
Expenditures:
$662,617

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits obtained to do field work B: 165. Project Permitting 02/27/2009 03/18/2009
Measure Stream Temperature in Clearwater River Tributaries C: 157. Measure Stream Temperature (Clearwater River) 12/31/2009 12/28/2009
Measure Stream Temperature in Salmon River Tributaries D: 157. Measure Stream Temperature (Salmon River) 12/31/2009 12/28/2009
Install and operate temporary weir in Fish Creek E: 157. Install and Operate Fish Creek Weir (Clearwater River) 09/30/2009 09/02/2009
Install and Operate Screw Traps in Fish Creek F: 157. Install and Operate Screw Traps (Clearwater River - Fish Creek) 12/01/2009 12/01/2009
Install and Operate Screw Traps in the Salmon River Basin G: 157. Install and Operate Screw Traps (Salmon River - Rapid River and Big Creek) 12/01/2009 12/01/2009
DNA tissue collection at Salmon River tributaries, traps, and weirs H: 157. Collect DNA Tissue Samples (Salmon River & Tribs) 11/20/2009 11/20/2009
DNA tissue collection in the Clearwater River tributaries, traps, and weirs I: 157. Collect DNA Tissue Samples (Clearwater River & Tribs 11/20/2009 11/20/2009
PIT tagging steelhead juveniles in Clearwater streams J: 158. PIT tag juveniles in streams (Clearwater River & Tribs) 11/30/2009 11/30/2009
PIT tagging Steelhead juveniles in Salmon River tributaries K: 158. % PIT tag juveniles in streams (Salmon River - Md. Fork and Little Salmon) 11/30/2009 11/30/2009
Snorkel surveys in Clearwater R. Tributaries L: 157. Snorkel streams to estimate juvenile densities (Clearwater River & Tribs) 08/31/2009 08/31/2009
Snorkel surveys in Salmon R. Tributaries M: 157. Snorkel streams to estimate juvenile densities (Tribs to Main Salmon R, SF, MF, Upper and Little) 08/31/2009 08/31/2009
Adult steelhead sampling in Big Creek N: 157. Sample adult steelhead in Big Creek (Salmon River - Middle Fk/Big Creek) 06/30/2009 06/30/2009
Scale and tissue sample collection O: 157. Sample adult steelhead at Lower Granite Dam 12/15/2009 12/15/2009
Upload PIT tag Files P: 159. Manage PIT Tag Files 11/20/2009 11/20/2009
Provide information to IDFG staff or other regional entities Q: 161. Submit data to IDFG & other regional managers 12/31/2009 12/28/2009
Databases updated with 2009 data R: 160. Maintain Databases 12/31/2009 12/28/2009
2008 Stream temperature data summarized S: 162. Summarize stream temperature data 04/01/2009 03/31/2009
Determine the age of juvenile and adult steelhead T: 162. Estimate ages of adult and juvenile steelhead collected in 2008 04/01/2009 03/31/2009
Determine the age of wild adult steelhead U: 162. Estimate ages of adult steelhead collected in fall 2009 12/31/2009 12/28/2009
Estimated Juvenile production for ISMES streams V: 162. Estimate 2008 juvenile steelhead production and timing 04/01/2009 03/31/2009
2008 steelhead smolt to adult survival estimates W: 162. Estimate survival of 2008 steelhead smolt migration 04/01/2009 03/31/2009
Juvenile steelhead density estimates X: 162. Estimate fish densities in snorkeled tributaries 04/01/2009 03/31/2009
Genotype and analyze genetic tissue samples Y: 162. Genotype and analyze genetic tissues and results 12/31/2009 12/28/2009
Adult steelhead escapement into Idaho Index streams. Z: 162. Estimate 2008 adult steelhead escapement 10/30/2009 10/30/2009
Journal articles AA: 183. Prepare/Submit Journal Articles 12/31/2009 12/28/2009
2008 Annual Report AB: 132. Produce Annual Report for 2008 10/15/2009 11/30/2009
Manage project administration and coordination AC: 119. % Manage Project 12/31/2009 12/28/2009
Completed project proposal AD: 114. Proposal development for NPCC/ISRP review 12/31/2009 12/28/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 11 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 8 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 165 Project Permitting 02/09/2007
C 157 Measure Stream Temperature (Clearwater River) 07/17/2009
D 157 Measure Stream Temperature (Salmon River) 07/17/2009
E 157 Install and Operate Fish Creek Weir (Clearwater River) 07/17/2009
F 157 Install and Operate Screw Traps (Clearwater River - Fish Creek) 07/17/2009
G 157 Install and Operate Screw Traps (Salmon River - Rapid River and Big Creek) 07/17/2009
H 157 Collect DNA Tissue Samples (Salmon River & Tribs) 07/17/2009
I 157 Collect DNA Tissue Samples (Clearwater River & Tribs 07/17/2009
J 158 PIT tag juveniles in streams (Clearwater River & Tribs) 07/17/2009
K 158 % PIT tag juveniles in streams (Salmon River - Md. Fork and Little Salmon) 07/17/2009
L 157 Snorkel streams to estimate juvenile densities (Clearwater River & Tribs) 07/17/2009
M 157 Snorkel streams to estimate juvenile densities (Tribs to Main Salmon R, SF, MF, Upper and Little) 07/17/2009
N 157 Sample adult steelhead in Big Creek (Salmon River - Middle Fk/Big Creek) 07/17/2009
O 157 Sample adult steelhead at Lower Granite Dam 07/17/2009
P 159 Manage PIT Tag Files 02/09/2007
Q 161 Submit data to IDFG & other regional managers 02/09/2007
R 160 Maintain Databases 02/09/2007
S 162 Summarize stream temperature data 02/09/2007
T 162 Estimate ages of adult and juvenile steelhead collected in 2008 02/09/2007
U 162 Estimate ages of adult steelhead collected in fall 2009 02/09/2007
V 162 Estimate 2008 juvenile steelhead production and timing 02/09/2007
W 162 Estimate survival of 2008 steelhead smolt migration 02/09/2007
X 162 Estimate fish densities in snorkeled tributaries 02/09/2007
Y 162 Genotype and analyze genetic tissues and results 02/09/2007
Z 162 Estimate 2008 adult steelhead escapement 02/09/2007
AA 183 Prepare/Submit Journal Articles 02/09/2007
AB 132 Produce Annual Report for 2008 02/09/2007
AC 119 % Manage Project 02/09/2007
AD 114 Proposal development for NPCC/ISRP review 02/09/2007