Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 40659: 199800703 EXP GRANDE RONDE SUPPLEMENTATION O&M
Project Number:
Title:
Grande Ronde Supplementation O&M on Catherine Creek/Upper Grande Ronde River
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
40659
Contract Title:
199800703 EXP GRANDE RONDE SUPPLEMENTATION O&M
Contract Continuation:
Previous: Next:
36813: 1998-007-03 EXP GRANDE RONDE SUPP: O&M
  • 45324: 1998-007-03 EXP GRANDE RONDE SUPPLEMENTATION O&M
Contract Status:
Closed
Contract Description:
I. Project Goal

To preserve the genetic variability and enhance the population size of the depressed spring Chinook salmon populations in Catherine Creek and the Upper Grande Ronde River using a hatchery program based on the indigenous stock.

RPA 177: In 2002, BPA shall begin to implement and sustain NMFS-approved, safety-net projects.
Deliverables:  All of the deliverables contained in this statement of work will apply to this RPA.

II. Background

The ceded lands and usual and accustomed fishing sites in northeast Oregon of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) include areas where fish and wildlife populations have been negatively affected by the construction and operation of mainstem Columbia and Snake River dams. CTUIR is seeking restoration of these populations.  

The CTUIR, Nez Perce Tribe (NPT), and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSP) to increase natural production and eventually allow harvest of spring Chinook salmon in the Grande Ronde River basin. This integrated salmon program uses captive and conventional broodstock artificial propagation components in order to prevent extinction, supplement natural production and restore productive fisheries in currently underutilized habitat in the Grande Ronde River basin. A comprehensive plan developed by comanagers to more functionally combine and integrate the captive brood and conventional components of the program was completed in 1998. All aspects of the GRESCSP are fully integrated with the Lower Snake River Compensation Plan (LSRCP).  Project activities are incorporated into the LSRCP/BPA Annual Operations Plan.

The GRESCSP is an extension of the LSRCP which has temporarily changed the emphasis of its spring Chinook programs from mitigation to conservation.  Grande Ronde Basin tributaries currently being targeted for spring Chinook supplementation under LSRCP include the upper Grande Ronde River, Catherine Creek and the Lostine River.  The primary focus of this project is the programs directed at Catherine Creek and the upper Grande Ronde River which lie within the ceded lands boundary of CTUIR.

The captive broodstock component of the program was initiated by NPT and ODFW in 1995 under initial funding from LSRCP.  CTUIR became involved in the program in late 1996.  Naturally-produced juvenile salmon are captured from three tributaries of the Grande Ronde River (Catherine Creek, upper Grande Ronde, and Lostine rivers) and then reared to maturity and spawned in captivity. Spawning of mature captive brood fish began in 1998.  Final rearing of these captive broodstock progeny occurs at Lookingglass Hatchery.  Smolts are then transferred back to their stream of origin for acclimation and release.

The conventional broodstock component of the program began in 1997 on the same three Grande Ronde tributaries.  Naturally-produced adult spring Chinook salmon are captured at weirs on these tributaries and taken to Lookingglass Hatchery for spawning. CTUIR operates the adult collection weirs in the upper Grande Ronde River and Catherine Creek for population monitoring and collection of conventional broodstock. Due to low numbers of returning adults, no conventional broodstock were spawned from either Catherine Creek or the upper Grande Ronde River until 2001.  As with the captive brood portion of the program, final rearing of the conventional progeny is expected to occur at Lookingglass Hatchery.  Smolts will then be transferred back to their stream of origin for acclimation and release.

CTUIR operates juvenile acclimation facilities for spring Chinook salmon in the upper Grande Ronde River and Catherine Creek. The first juveniles produced from the program were1998 brood captive brood progeny which were acclimated and released in 2000. From 2000 to 2008 we have released 1,098,361 juvenile spring Chinook salmon into the Upper Grande Ronde River and 1,094,745 into Catherine Creek.


V. BPA-Furnished Property

BPA will provide all required water right permits from Oregon Water Resources (water rights) and instream work permits from the Division of State Lands for all facilities.
1. Catherine Creek acclimation water right and intake maintenance
2. Catherine Creek adult weir maintenance.
3. Upper Grande Ronde acclimation water right and intake maintenance.
4. Upper Grande Ronde adult weir maintenance.

In 2002 the project was divided into 2 separate contracts, Operations and Maintenance and Monitoring and Evaluation.
Account Type(s):
Expense
Contract Start Date:
01/01/2009
Contract End Date:
12/31/2009
Current Contract Value:
$482,858
Expenditures:
$482,858

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) Yes Administrative Contact julieburke@ctuir.org (541) 429-7292
Mickey Carter Bonneville Power Administration No Interested Party macarter@bpa.gov (503) 230-5885
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Mike McLean Umatilla Confederated Tribes (CTUIR) Yes Contract Manager mikemclean@ctuir.org (541) 429-7960
Paul Rabb Umatilla Confederated Tribes (CTUIR) No Administrative Contact paulrabb@ctuir.org (541) 429-7165
Celeste Reeves Umatilla Confederated Tribes (CTUIR) No Administrative Contact celestereeves@ctuir.org (541) 429-7293
Jennifer Stolz Bonneville Power Administration No Env. Compliance Lead jpstolz@bpa.gov (503) 230-3233
Brian Zimmerman Umatilla Confederated Tribes (CTUIR) No Supervisor brianzimmerman@ctuir.org (541) 429-7286


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Documentation and assistance to support BPA's Environmental Compliance Group. A: 165. Obtain Permits and submit copies to BPA NEPA group. 12/31/2009 12/31/2009
Acclimation of fish at Upper Grande Ronde River. B: 56. Upper Grande Ronde River Acclimation 04/17/2009 04/17/2009
Acclimation of fish at Catherine Creek. C: 56. Catherine Creek Acclimation 04/17/2009 04/17/2009
Operate adult collection facility at Upper Grande Ronde D: 66. Upper Grande Ronde Adult Collection 07/31/2009 07/31/2009
Operate adult collection facility at Catherine Creek E: 66. Catherine Creek Adult Collection 07/31/2009 07/31/2009
Assist with spawning at Lookingglass Fish Hatchery F: 64. Assist with spawning of broodstock 10/30/2009 10/30/2009
Send weekly reports to co-managers during periods of acclimation and adult facility operation G: 161. Weekly Reports 09/30/2009 09/30/2009
Environmental conditions, fish numbers, fish condition, PIT tag information, fish spawned H: 157. Collection of data at facilities 11/15/2009 11/15/2009
Data Analysis of Current Data Collection For Management Decisions I: 162. Data Analysis For Management 12/31/2009 12/31/2009
Maintain Upper Grande Ronde facilities J: 61. Upper Grande Ronde Facility Maintenance 12/31/2009 12/31/2009
Maintain Catherine Creek facilities K: 61. Catherine Creek Facility Maintenance 12/31/2009 12/31/2009
Maintain La Grande Shop/Office. L: 61. La Grande Office/Shop Maintenance 12/31/2009 12/31/2009
Attend meetings for project implementation M: 189. Coordination of Project Activities 12/31/2009 12/31/2009
FY09 SOW, September 08 Accrual Estimates N: 119. Annual Budget Package/Accrual Reports/Provincial Review 10/02/2009 12/31/2009
Produce quarterly reports O: 141. Quarterly Report (Word/Excel) 12/31/2009 12/31/2009
Attach 08 Progress Report in Pisces P: 132. Submit Progress Report for the period 1/1/08 to 12/31/08 12/31/2009 12/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 64 Spawn Fish
  • 2 instances of WE 56 Acclimate Juvenile Fish
  • 3 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group. 02/09/2007
B 56 Upper Grande Ronde River Acclimation 03/26/2008
C 56 Catherine Creek Acclimation 03/26/2008
D 66 Upper Grande Ronde Adult Collection 03/26/2008
E 66 Catherine Creek Adult Collection 03/26/2008
F 64 Assist with spawning of broodstock 03/26/2008
G 161 Weekly Reports 02/09/2007
H 157 Collection of data at facilities 03/26/2008
I 162 Data Analysis For Management 02/09/2007
J 61 Upper Grande Ronde Facility Maintenance 02/09/2007
K 61 Catherine Creek Facility Maintenance 02/09/2007
L 61 La Grande Office/Shop Maintenance 02/09/2007
M 189 Coordination of Project Activities 02/09/2007
N 119 Annual Budget Package/Accrual Reports/Provincial Review 02/09/2007
O 141 Quarterly Report (Word/Excel) 02/09/2007
P 132 Submit Progress Report for the period 1/1/08 to 12/31/08 02/09/2007
Q 185 Periodic Status Reports for BPA 02/09/2007