Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 40950: 2003-017-00 EXP ISEMP - SALMON RIVER - QUANTITATIVE CONSULTANTS
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
40950
Contract Title:
2003-017-00 EXP ISEMP - SALMON RIVER - QUANTITATIVE CONSULTANTS
Contract Continuation:
Previous: Next:
n/a
  • 45428: 2003-017-00 EXP ISEMP - SALMON R. - QUANTITATIVE CONSULTANTS
Contract Status:
Closed
Contract Description:
Since its inception in FY2003, Project #2003-017-00 (the Integrated Status and Effectiveness Monitoring Program; ISEMP) has been developing two novel monitoring and evaluation programs: (i) subbasin-scale pilot status and trend monitoring efforts for anadromous salmonids and their habitat in the Wenatchee/Entiat, John Day and South Fork Salmon River basins, and (ii) effectiveness monitoring for suites of habitat restoration projects in selected watersheds within the three target subbasins. This work - critical for implementing the 2000 NMFS FCRPS Biological Opinion (RPA Actions 180, 181, and 183) (BiOp) and UPAs from the 2004 BiOp - builds on current status and trend monitoring programs within each of these basins. Several regional and local organizations are funding and implementing these programs. In short, this project has integrated existing and new monitoring and evaluation activities in three pilot subbasins to help ensure that provisions of the BiOp are satisfied. This contract is one of several contracts that will implement this project. The final report for this contract will contain data that will 1) be submitted to NOAA Fisheries (also a contractor under this project) for use in a project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.  Quantitative Consultants, Inc.  role has been, and continues to be, to enable the Bonneville Power Administration to implement Project #2003-017-00 in the Salmon River subbasin and other pilot subbasins.

The Salmon portion of the ISEMP project began in 2005 with the completion of a study design (attached and available at http://www.nwfsc.noaa.gov/research/divisions/cbd/mathbio/isemp/docs_salmon.cfm#2005), which received a positive review by the Independent Scientific Review Panel in 2006 (ISRP 2006-1; attached and available at http://www.nwfsc.noaa.gov/research/divisions/cbd/mathbio/isemp/docs_salmon.cfm#2005). Implementation of the ISEMP project in the Salmon subbasin was funded in FY2008, with on-the-ground actions expected to commence in FY2009.

****New note regarding no-cost line item transfers 06/01/2009.**** An amended budget was uploaded on 06/01/2009, reflecting the following changes:
1. $55,000 was added to the contract to cover Work Element 1B "Conduct juvenile seining and PIT tagging activities in South Fork Salmon River." As described in the original contract, completing Work Element 1Bwas contingent on the successful transfer of $55,000 from the Idaho Department of Fish and Game (IDFG) Idaho Steelhead Project (BPA project number 1990-055-00). The budget transfer was approved by the Budget Oversight Group (BOG) in April 2009. The funding will be used to conduct juvenile capture and PIT tagging at sites in the mainstem South Fork Salmon River.
2. The amended budget also includes changes to Work Element 4A "Operate ISEMP screw traps in South Fork Salmon River." The transfer will deduct $10,908 from GSA vehicle rental and mileage to fund the purchase of a PIT tag table. The purchase of the PIT tag table will enable the Nez Perce Tribe to move more efficiently between screw trapping sites in the lower South Fork Salmon River, thus removing the need for two vehicles.
Account Type(s):
Expense
Contract Start Date:
12/01/2008
Contract End Date:
11/30/2009
Current Contract Value:
$1,169,479
Expenditures:
$1,169,479

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Time and Materials
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Documentation A: 165. Environmental Compliance Documentation 02/28/2009 02/28/2009
Funding Package - Submit draft to COTR C: 119. Project Management 09/01/2009 09/01/2009
Produce Draft Progress Report D: 132. Complete Draft Progress Report for the period (Dec 2008) to (Nov 2009) 11/30/2009 11/30/2009
Task 1A: Juvenile sampling and marking data. E: 157. Task 1A: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 11/30/2009 11/15/2009
Task 1A: Juvenile tagging data. F: 158. Task 1A: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2009 11/15/2009
Task 1B: Juvenile sampling and marking data. G: 157. Task 1B: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 11/30/2009 11/15/2009
Task 1B: Juvenile tagging data. H: 158. Task 1B: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2009 11/15/2009
Task 1C: Juvenile sampling and marking data. I: 157. Task 1C: Conduct juvenile seining and PIT tagging activities in the Lemhi River. 11/30/2009 11/15/2009
Task 1C: Juvenile tagging data. J: 158. Task 1C: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2009 11/15/2009
Task 2: Lemhi River habitat survey data. K: 157. Task 2: Lemhi River habitat sampling and LiDAR validation. 11/30/2009 11/15/2009
Task 3A: Report on PIT tag array performance and PIT tag detections. L: 157. Task 3A: Operate PIT tag Arrays in South Fork Salmon River. 11/30/2009 11/30/2009
Task 3B: Report on PIT tag array performance and PIT tag detections. M: 157. Task 3B: Operate PIT tag Arrays in the Lemhi River. 11/30/2009 11/30/2009
Task 4A: Install/remove rotary screw traps. N: 70. Task 4A: Install/remove South Fork Salmon River rotary screw traps. 11/30/2009 11/30/2009
Task 4A: Report juvenile capture data, biological information, and PIT tagging data for SFSR traps. O: 157. Task 4A: Operate ISEMP screw traps in South Fork Salmon River. 11/30/2009 11/30/2009
Task 4B: Install/remove rotary screw traps. P: 70. Task 4B: Assist in installation/removal of Lemhi River rotary screw traps. 11/15/2009 11/15/2009
Task 4B: Report juvenile capture data, biological information, and PIT tagging data for Lemhi traps. Q: 157. Task 4B: Assist in operation of screw traps in Lemhi River. 11/30/2009 11/30/2009
Task 5: Lower Granite Dam adult PIT tagging and biological sample data. R: 157. Task 5: Lower Granite Dam adult PIT tagging. 11/30/2009 11/30/2009
Task 5: Conduct adult PIT tagging. S: 158. Task 5: Lower Granite Dam adult PIT tagging. 11/30/2009 11/30/2009
Enter data using Automated Template Module in ISEMP Database T: 159. Enter data using Automated Template Module in ISEMP Database (IDFG) 11/30/2009 11/30/2009
Enter data using Automated Template Module in ISEMP Database U: 159. Enter data using Automated Template Module in ISEMP Database (Nez Perce Tribe) 11/30/2009 11/30/2009
Salmon Subbasin Data Analysis V: 162. ISEMP Salmon subbasin data analysis 11/30/2009 11/30/2009
Produce ISEMP funded activities annual report (IDFG) W: 141. Produce Annual Report on ISEMP Activities (IDFG) 11/15/2009 11/15/2009
Produce ISEMP funded activities annual report (IDFG) X: 141. Produce Annual Report on ISEMP Activities (Nez Perce) 11/15/2009 11/15/2009
ISEMP Salmon Subbasin Annual Report Review Y: 122. ISEMP Salmon Subbasin Annual Report Review 11/30/2009 11/30/2009
ISEMP Coordination (QCI) Z: 189. ISEMP Project Coordination (QCI) 11/30/2009 11/30/2009
ISEMP Project Coordination (IDFG) AA: 189. ISEMP Project Coordination (IDFG) 11/30/2009 11/30/2009
ISEMP Project Coordination (NPT) AB: 189. ISEMP Project Coordination (Nez Perce) 11/30/2009 11/30/2009
ISEMP Salmon Subbasin Coordination (QCI) AC: 191. ISEMP Salmon Subbasin Coordination (QCI) 11/30/2009 11/30/2009
ISEMP Salmon Subbasin Coordination (IDFG) AD: 191. ISEMP Salmon Subbasin Coordination (IDFG) 11/30/2009 11/30/2009
ISEMP Salmon Subbasin Coordination (NPT) AE: 191. ISEMP Salmon Subbasin Coordination (Nez Perce) 11/30/2009 11/30/2009
ISEMP Annual Review AF: 141. ISEMP Annual Draft Report Review 11/30/2009 11/30/2009
Cultural Resources Assessment AG: 115. Cultural Resources Assessment 11/30/2009 11/30/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 9 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 9 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance Documentation 02/09/2007
B 185 Periodic Status Reports for BPA 02/09/2007
C 119 Project Management 02/09/2007
D 132 Complete Draft Progress Report for the period (Dec 2008) to (Nov 2009) 02/09/2007
E 157 Task 1A: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 12/22/2008
F 158 Task 1A: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 06/30/2008
G 157 Task 1B: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 06/30/2008
H 158 Task 1B: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 06/30/2008
I 157 Task 1C: Conduct juvenile seining and PIT tagging activities in the Lemhi River. 06/30/2008
J 158 Task 1C: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 06/30/2008
K 157 Task 2: Lemhi River habitat sampling and LiDAR validation. 06/30/2008
L 157 Task 3A: Operate PIT tag Arrays in South Fork Salmon River. 06/30/2008
M 157 Task 3B: Operate PIT tag Arrays in the Lemhi River. 06/30/2008
N 70 Task 4A: Install/remove South Fork Salmon River rotary screw traps. 06/30/2008
O 157 Task 4A: Operate ISEMP screw traps in South Fork Salmon River. 06/30/2008
P 70 Task 4B: Assist in installation/removal of Lemhi River rotary screw traps. 06/30/2008
Q 157 Task 4B: Assist in operation of screw traps in Lemhi River. 06/30/2008
R 157 Task 5: Lower Granite Dam adult PIT tagging. 06/30/2008
S 158 Task 5: Lower Granite Dam adult PIT tagging. 06/30/2008
T 159 Enter data using Automated Template Module in ISEMP Database (IDFG) 02/09/2007
U 159 Enter data using Automated Template Module in ISEMP Database (Nez Perce Tribe) 02/09/2007
V 162 ISEMP Salmon subbasin data analysis 02/09/2007
W 141 Produce Annual Report on ISEMP Activities (IDFG) 02/09/2007
X 141 Produce Annual Report on ISEMP Activities (Nez Perce) 02/09/2007
Y 122 ISEMP Salmon Subbasin Annual Report Review 02/09/2007
Z 189 ISEMP Project Coordination (QCI) 02/09/2007
AA 189 ISEMP Project Coordination (IDFG) 02/09/2007
AB 189 ISEMP Project Coordination (Nez Perce) 02/09/2007
AC 191 ISEMP Salmon Subbasin Coordination (QCI) 02/09/2007
AD 191 ISEMP Salmon Subbasin Coordination (IDFG) 02/09/2007
AE 191 ISEMP Salmon Subbasin Coordination (Nez Perce) 02/09/2007
AF 141 ISEMP Annual Draft Report Review 02/09/2007
AG 115 Cultural Resources Assessment 02/09/2007