Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 43192: 2001-032-00 EXP HANGMAN CREEK FISHERIES
Project Number:
Title:
Coeur D'Alene Fisheries Enhancement-Hangman Creek
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Spokane 100.00%
Contract Number:
43192
Contract Title:
2001-032-00 EXP HANGMAN CREEK FISHERIES
Contract Continuation:
Previous: Next:
38001: 2001-032-00 EXP HANGMAN CREEK FISHERIES HABITAT
  • 47730: 2001-032-00 EXP HANGMAN CREEK FISHERIES
Contract Status:
Closed
Contract Description:
The Scope of Work and budget presented in this document represent the activities associated with the Coeur 'd Alene Tribe's resident fish enhancement project on Hangman Creek within the Spokane Sub-basin corresponding to the contract period May 1, 2009 to April 30, 2010.  Total amount of this budget request is $270,419.  Project 2001-032-00 has entered the Implementation Phase of the Project after an Assessment Phase starting in 2002.

Objectives include:
o Identify if naturally reproducing rainbow trout in Hangman Creek within the CDA Reservation are Redband trout (Oncorhynchus mykiss gairdneri)..
o Determine areas that are in need of restoration to supply spawning and rearing habitat for Redband and other naturally reproducing trout.
o Develop an educational outreach program to facilitate a “holistic watershed protection process.
o Implement a habitat/in-stream restoration strategy that will provide self-sustaining, naturally reproducing, and harvestable populations of native trout.
o Implement a monitoring and evaluation program to determine the effectiveness of habitat/in-stream restoration project.


Reaching the goals of the objectives include the following techniques: 1) WE C will provide in-house designs for smaller projects such as LWD placement, riparian enhancement, and cattle exclusion.  2) Restoring canopy to cool water temperatures, roots to keep stream banks stable, and provide future recruitment of LWD will be accomplished with riparian plantings in WE's D, E, and F.  3) For sites lacking stable LWD and recruitment potential,  4) Provide Public Outreach Activities in WE R to educate  the public on project's objectives and benefits of restoration.  


This project will be working with it's sister project (2001-033-00) administered by the Coeur d 'Alene Tribe's Wildlife Program to restore Hangman Creek's streams and wetlands. 2001-033 is currently writing a management plan for property purchased downstream of the priority area of the Fisheries portion 2001-032-00. The primary goal of 2001-033-00 is to purchase easements on priority lands for restoration.
Account Type(s):
Expense
Contract Start Date:
05/01/2009
Contract End Date:
04/30/2010
Current Contract Value:
$267,944
Expenditures:
$267,944

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

Contract(s):

43192

Dimensions: 978 x 1265

Description: 31 Shock Sites mapped out for 2009

Contract(s):

43192

Dimensions: 978 x 1265

Contract(s):

43192

Dimensions: 978 x 1265

Contract(s):

43192

Dimensions: 1265 x 1955


Full Name Organization Write Permission Contact Role Email Work Phone
Stephanie Breeden Bonneville Power Administration No Env. Compliance Lead sfbreeden@bpa.gov (503) 230-5192
Cameron Heusser Coeur D'Alene Tribe No Supervisor cheusser@cdatribe-nsn.gov (208) 686-5521
Bruce Kinkead Coeur D'Alene Tribe Yes bkinkead@cdatribe-nsn.gov (208) 686-6071
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Carla Marratt Coeur D'Alene Tribe Yes Administrative Contact cmarratt@cdatribe-nsn.gov (208) 686-6803
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed NEPA Checklist A: 165. NEPA Analysis and Documentation 04/30/2010 04/30/2010
Selection of Restoration Projects B: 114. Identify and Select New Restoration Projects 04/30/2010 04/30/2010
Restoration Design for New Projects C: 175. Produce Design and/or Specifications- Collect Preliminary Design Data for New Properties 04/30/2010 04/30/2010
In-stream channel enhancements within Indian Creek D: 29. Place Instream LWD in Indian Creek 04/30/2010
Enhanced Floodplain Communities on Hangman Creek E: 47. Enhance Floodplain Plant Communities at Various Locations 04/30/2010 04/30/2010
Protected Riparian Plants on Hangman Creek at Various locations F: 22. Maintain Plants at Hangman at Various Locations 04/30/2010 04/30/2010
Fish Traps Installed and Maintained G: 70. Install and Maintain Fish Traps 04/30/2010 04/30/2010
Fish Migration Patterns Studied H: 157. Sample Fish Using Migration Traps 04/30/2010 04/30/2010
Electroshock Sampling of Fish in Hangman Watershed I: 157. Sample Fish Using Electroshocking Equipment 03/31/2010 03/31/2010
Maintained Fisheries Database. J: 160. Maintain Fisheries Database 04/30/2010 04/30/2010
Physical Habitat Data Collected K: 157. Collect Physical Habitat Data 03/12/2010 03/26/2010
Water Quality Data Collected L: 157. Collect Water Quality Data 04/30/2010 03/30/2010
Measure Thermal Heterogeneity in Hangman Creek M: 157. Collect Thermal Refuge Data 03/05/2010 03/01/2010
Field Data Transfer N: 159. Transfer Data from Field Equipment 04/30/2010 04/30/2010
Habitat and Water Quality Databases Maintained O: 160. Maintain Water Quality and Physical Habitat Database 04/30/2010 04/30/2010
Water Quality and Physical Habitat Analyzed P: 162. Analyze Water Quality and Physical Habitat 04/30/2010 04/30/2010
GIS Summarization of Project Data Collected Q: 161. Summarize Water Quality, Physical habitat, and Fisheries using GIS 04/30/2010 04/30/2010
Outreach and Education R: 99. Outreach and Education 04/30/2010 04/30/2010
Coordinate with Coeur d'Alene Tribe and Local and Regional Stakeholders S: 189. Program, Tribal, and Regional Coordination 04/30/2010 04/30/2010
Management and Administration of Project T: 119. Manage and Administer Project 04/30/2010 04/30/2010
Final annual report for the period (May 2006) to (April 2007) uploaded to the BPA website V: 132. Submit Annual Report for the period May 2007 to April 2008 04/30/2010
Final annual report for the period (May 2006) to (April 2007) uploaded to the BPA website W: 132. Submit Annual Report for the period May 2008 to April 2009 04/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA Analysis and Documentation 02/09/2007
B 114 Identify and Select New Restoration Projects 02/09/2007
C 175 Produce Design and/or Specifications- Collect Preliminary Design Data for New Properties 02/09/2007
D 29 Place Instream LWD in Indian Creek
E 47 Enhance Floodplain Plant Communities at Various Locations 05/21/2009
F 22 Maintain Plants at Hangman at Various Locations 05/21/2009
G 70 Install and Maintain Fish Traps 05/21/2009
H 157 Sample Fish Using Migration Traps 02/09/2007
I 157 Sample Fish Using Electroshocking Equipment 02/09/2007
J 160 Maintain Fisheries Database 02/09/2007
K 157 Collect Physical Habitat Data 02/09/2007
L 157 Collect Water Quality Data 02/09/2007
M 157 Collect Thermal Refuge Data 02/09/2007
N 159 Transfer Data from Field Equipment 02/09/2007
O 160 Maintain Water Quality and Physical Habitat Database 02/09/2007
P 162 Analyze Water Quality and Physical Habitat 02/09/2007
Q 161 Summarize Water Quality, Physical habitat, and Fisheries using GIS 02/09/2007
R 99 Outreach and Education 02/09/2007
S 189 Program, Tribal, and Regional Coordination 02/09/2007
T 119 Manage and Administer Project 02/09/2007
U 185 Periodic Status Reports for BPA 02/09/2007
V 132 Submit Annual Report for the period May 2007 to April 2008 02/09/2007
W 132 Submit Annual Report for the period May 2008 to April 2009 02/09/2007