Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46247: 1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
Project Number:
Title:
Trout Creek Summer Steelhead Habitat Restoration, Conservation and Population Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Deschutes 100.00%
Contract Number:
46247
Contract Title:
1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
Contract Continuation:
Previous: Next:
41577: 1994-042-00 EXP TROUT CREEK OPERATIONS AND MAINTENANCE
  • 51808: 1994-042-00 EXP TROUT CREEK OPERATION AND MAINTENANCE
Contract Status:
Closed
Contract Description:
The Trout Creek habitat restoration project is and ongoing habitat restoration project.  The goal of the project is to increase the out-migrant population to an average of 100,000 smolts of ESA listed DPS Mid-Columbia River Summer Steelhead per year as estimated at the ODFW operated and BPA funded out-migrant trap located on Trout Creek at river mile 3.2.  To accomplish this goal this project has undertaken several ambitious projects within the Trout Creek watershed.  Projects have been, and continue to be, accomplished by forging partnerships with other agencies and working with willing private and public landowners to develop habitat restoration plans that will result in the long term enhancement of the watershed.  The tasks below give an idea of the issues addressed in and indicate the scope of the project actions undertaken to reach the projects ambitious goal.  

1) Enhance riparian habitat -

Results to date: This project has 54 stream miles protected from livestock grazing and 4554 acres of riparian exclosure that are maintained by ODFW.  Partnership with JCSWCD and NRCS and FSA has resulted in over 14 stream miles protected from livestock grazing and ~411 acres of riparian exclosure.  This project has also planted over 74,000 trees and shrubs (FSA CREP).  Currently there are 2.15 stream miles of lower Mainstem Trout Creek currently under exclosure negotiation.

Summary:  In the 700 square mile Trout Creek watershed there are approximately with approximately 120 miles of fish bearing streams.  Of these fish bearing streams 52% are within riparian exclosures and 11% are within inaccessible canyons.  

Work to complete: Continue to maintain, monitor, and document habitat changes within existing ODFW exclosures.  Continue work with private landowners to develop projects that will enhance riparian habitat.  Continue to develop partnerships with other agencies to facilitate funding sources and programs that will result in improved riparian habitat.  Utilize monitoring and evaluation results to refine projects and to provide information on fishery response to actions.  Additionally use monitoring and evaluation data to assist in the negotiation for additional restoration projects with private landowners.

2) Enhance instream and floodplain habitat -  

Results to date:  Planned, acquired funding, designed, and constructed a instream and riparian habitat restoration project on 10 stream miles.  Along the ten miles of restoration there has been over 1 mile of stream length added, an average flood prone width increase of  over 175%, over 4400 pounds of native grass and forb seed and over 70,000 trees and shrubs planted, 9.5 surface acres of wetland created, and over 250 acres enrolled into the CREP program.  This projects' Monitoring and evaluation program and the resulting data stream has served to initiate a two mile stream restoration project on the Mainstem of Trout Creek in an area where is was assumed there was no steelhead spawning or rearing.  Within the forested areas of the basin several hundred habitat boulders and LWD pieces have been placed instream.  

Summary:  In the Trout Creek watershed there are approximately 120 miles of fish bearing streams.  Of these fish bearing streams approximately 29 miles of stream were altered by channel straightening and/or channelization.  To date 41% of altered streams will be restored.  

Work to complete:  Continue to work with private landowners to develop restoration plans that will enhance instream and floodplain habitat on the remaining 17 miles of altered habitat.  Continue monitoring and evaluation of physical habitat and biological components to assess success of project work and document physical and biological response to actions.  Utilize monitoring and evaluation results to refine projects and to provide information on fishery response to actions.  Continue to gather and use biological and physical habitat data to assist in shaping future restoration projects.  

3) Enhance irrigation efficiency to promote additional stream flow -  

Results to date:  This project has replaced 3 gravel push up dams with removable stop log structures complete with fish passage devices.  Additionally, this project has assisted the JCSWCD to implement several water efficiency projects.  These projects have removed 8 gravel push up dams and replaced 1.81 miles of open ditch with pipe and a conversion of flood irrigation to sprinklers.  In addition all points of diversion in the basin have fish screening devices (currently maintained by Federal Mitchell act funds).

Summary:  With the effort from several agencies all points of water diversion have been screened.  A total of 16 gravel push up dams have been eliminated and 7.83 miles of open ditch have been eliminated and/or placed in pipe.  

Work to complete:  Continue work with private landowners to remove the need for the last two remaining gravel push up dams.  Continue to develop partnerships with other agencies to facilitate funding sources and programs that will result in improved irrigation efficiencies.  Mitchell finds are scheduled to be eliminated in near future.  Monitor this funding source and assure that fish screens are maintained.

The work proposed in this Scope of Work is consistent with the goals and objectives of the Trout Creek Watershed Assessment of 2003, the draft for the south-east sub-unit of the Deschutes Subbasin Plan of 2004 the objectives of RPA's 150 and 153 of the 2000 FCRPS Biological Opinion, the Trout Creek mitigation recommendations of the FERC Relicensing Agreement for the Pelton Round Butte Hydroelectric Project, and the habitat improvement agreements established between ODFW, JCSWCD and individual landowners in Trout Creek.  In addition, these actions are in compliance with the requirements established by the ISRP in their comments in the 2001 Provincial Review (i.e. justify additional work via the watershed assessment and subbasin plans).

Work Elements and milestone performance is subject to ongoing BPA funding limitations.  Additional funding options have been, and continue to be, explored.  However, unless current funding level is raised there will be severe limitations in the performance of  Work Elements and attainment of milestones.
Account Type(s):
Expense
Contract Start Date:
02/01/2010
Contract End Date:
01/31/2011
Current Contract Value:
$367,074
Expenditures:
$367,074

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
NEPA Compliance Requirements Complete For Habitat Restoration Projects To Be Implemented A: 165. Obtain Environmental Compliance 01/31/2011 01/31/2011
Viable Restoration Projects Developed To Assist In The Attainment Of Project Goal B: 114. Habitat Restoration Project Development 01/31/2011 01/31/2011
Remove noxious weeds and revegetate ground within Trout Creek project area. C: 47. Revegetate Exclosure Area Within The Trout Creek Project Area 01/31/2011 01/31/2011
Willowdale Riparian Fence D: 40. Install Fence To Exclude 2.5 Miles Of Trout Creek From Livestock Grazing 12/10/2010
Develop Culvert replacement Specifications for Upper Trout Creek E: 175. Develop Design Specifications For Upper Trout Creek Culvert Replacement 01/31/2011 01/31/2011
Replacement of undersized and semi-functional culverts in the Upper Trout Creek Basin F: 38. Replace Undersized Culverts In Upper Trout Creek Basin 01/31/2011
Develop Off Channel Water Sources For Livestock (If Identified) G: 34. Develop Offsite Water Sources For Livestock 01/31/2011 01/31/2011
Monitor Trout Creek Basin Riparian Exclosures H: 26. Monitor Exclosures 01/31/2011 01/31/2011
Maintained Fences & Water Gaps I: 186. Maintain Riparian Corridor Fence 01/31/2011 01/31/2011
Maintained Bank Stabilization Structures J: 186. Maintain Bank Stabilization Structures 01/31/2011 01/31/2011
Maintained Instream Structures K: 186. Maintain Instream Structures 01/31/2011 01/31/2011
Repaired/Maintained Off Channel Water Development Sites L: 186. Repair/Maintain Off Channel Water Development Sites 01/31/2011 01/31/2011
Document Physical Habitat Changes In Response To Restoration Actions Funded By BPA M: 157. Document The Changes Of Habitat Restoration Practices in the Trout Creek basin. 01/31/2011 01/31/2011
Basin Wide Redd Counts N: 157. Adult Redd Counts 06/15/2010 06/15/2010
Post Monitoring Of Major Channel Habitat Improvement Project O: 157. Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches 01/31/2011 01/31/2011
Technical Assistance Provided P: 122. Provide Technical Assistance & Input 01/31/2011 01/31/2011
Stream Water Temperature Monitored Q: 157. Monitor Stream Water Temperature In The Trout Creek Basin 01/31/2011 01/31/2011
Data Captured In Two Data Bases (One For Adults & One for Juveniles) R: 157. Monitor Smolt Production & Adult Escapement 01/31/2011 01/31/2011
Exclude Hatchery Summer Steelhead From Wild Trout Creek Summer Steelhead Stock S: 190. Remove/Exclude Hatchery Summer Steelhead 06/30/2010 06/30/2010
Summer Steelhead Smolts PIT Tagged T: 158. PIT Tag Outmigrant Summer Steelhead To Estimate Run Size 09/30/2010 09/30/2010
PIT Tag Data Submitted To PTAGIS U: 159. Submit & Acquire PIT Tag Data To/From PTAGIS 06/30/2010 06/30/2010
ESA Listed Mid Columbia Summer Steelhead Monitored V: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-migrant Estimates 01/31/2011 01/31/2011
Annual Report For Performance Period 2/1/09 - 1/31/10 X: 132. Annual Report 10/01/2010 10/01/2010
Manage & Administer Project Y: 119. Manage & Administer Project 01/31/2011 01/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 26 Investigate Trespass
  • 4 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Environmental Compliance 02/01/2010
B 114 Habitat Restoration Project Development 02/01/2010
C 47 Revegetate Exclosure Area Within The Trout Creek Project Area 07/12/2010
D 40 Install Fence To Exclude 2.5 Miles Of Trout Creek From Livestock Grazing 07/12/2010
E 175 Develop Design Specifications For Upper Trout Creek Culvert Replacement 02/01/2010
F 38 Replace Undersized Culverts In Upper Trout Creek Basin 02/01/2010
G 34 Develop Offsite Water Sources For Livestock 07/12/2010
H 26 Monitor Exclosures 02/01/2010
I 186 Maintain Riparian Corridor Fence 03/31/2010
J 186 Maintain Bank Stabilization Structures 03/31/2010
K 186 Maintain Instream Structures 03/31/2010
L 186 Repair/Maintain Off Channel Water Development Sites 03/31/2010
M 157 Document The Changes Of Habitat Restoration Practices in the Trout Creek basin. 03/31/2010
N 157 Adult Redd Counts 03/31/2010
O 157 Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches 03/31/2010
P 122 Provide Technical Assistance & Input 02/01/2010
Q 157 Monitor Stream Water Temperature In The Trout Creek Basin 04/02/2010
R 157 Monitor Smolt Production & Adult Escapement 03/31/2010
S 190 Remove/Exclude Hatchery Summer Steelhead 03/31/2010
T 158 PIT Tag Outmigrant Summer Steelhead To Estimate Run Size 03/31/2010
U 159 Submit & Acquire PIT Tag Data To/From PTAGIS 02/01/2010
V 162 Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-migrant Estimates 02/01/2010
W 185 Periodic Status Reports for BPA 02/01/2010
X 132 Annual Report 02/01/2010
Y 119 Manage & Administer Project 02/01/2010