Contract 47290: 200400200 EXP SALM-STEELHD MONIT PRGM (WDFW) DCC PNAMP ISTM FY10
Project Number:
Title:
Pacific Northwest Aquatic Monitoring Program (PNAMP) Coordination
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
47290
Contract Title:
200400200 EXP SALM-STEELHD MONIT PRGM (WDFW) DCC PNAMP ISTM FY10
Contract Continuation:
Previous: Next:
44906: 200400200 EXP SALMON-STEELHD MONITORING PRGM FOR PNAMP ISTM-WDFW
  • 52949: 2004-002-00 EXP SALM-STEELHD MONITOR PRGM - PNAMP ISTM-WDFW-FY11
Contract Status:
Closed
Contract Description:
As a preliminary step to the ultimate goal of developing a coordinated Viable Salmonid Population (VSP) monitoring program that addresses key regional (priority) monitoring questions, the focus of this contract is to compile and analyze WDFW Lower Columbia River (LCR) legacy data for ESA listed salmon and steelhead populations.  To this end, this contact has three main components.

The first component would be to develop rigorous data analysis methodologies to analyze data for (LCR) salmon and steelhead in order to more accurately reflect confidence intervals associated with sparse and incomplete data.  
The second component would be compile WDFW LCR Salmonid Legacy data for primary metrics. These include historical data for spawning ground surveys, juvenile out-migrant trapping as well as age & scale information.
Account Type(s):
Expense
Contract Start Date:
04/16/2010
Contract End Date:
04/15/2011
Current Contract Value:
$102,230
Expenditures:
$102,230

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
None
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Routine Contract Management Activities A: 119. Routine contract administration and interaction with BPA 04/15/2011 04/15/2011
Compilation of Ages and Scale, Smolt and Spawning Ground Survey Data legacy data into database B: 160. Create, manage maintain databases for spawning ground survey, age and smolt legacy data 12/31/2010 04/15/2011
Consolidation and standardization of LCR data into three separate statewide databases C: 159. Compile legacy fisheries data for LCR into improved database structures 12/31/2010 04/15/2011
Salmon Recovery Data Summary Report, Presentation and dissemination of data compiled under this cont D: 161. Salmon recovery data summary report 04/15/2011 04/15/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine contract administration and interaction with BPA 02/15/2010
B 160 Create, manage maintain databases for spawning ground survey, age and smolt legacy data 04/16/2010
C 159 Compile legacy fisheries data for LCR into improved database structures 02/15/2010
D 161 Salmon recovery data summary report 02/15/2010
E 132 Submit progress report for the period (APR 2010) to (DEC 2010) 02/15/2010
F 185 Periodic Status Reports for BPA 02/15/2010