Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 50585: 2003-017-00 EXP ISEMP - SALMON R. QUANTITATIVE CONSULTANTS
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
50585
Contract Title:
2003-017-00 EXP ISEMP - SALMON R. QUANTITATIVE CONSULTANTS
Contract Continuation:
Previous: Next:
45428: 2003-017-00 EXP ISEMP - SALMON R. - QUANTITATIVE CONSULTANTS
  • 55487: 2003-017-00 EXP ISEMP - SALMON R. QUANTITATIVE CONSULTANTS
Contract Status:
Closed
Contract Description:
The amendment adds WE's AT ( LiDAR Data Analysis and Habitat Metric Development) and AU (Cumulative Analysis Report).  WE AT reflects a new sub contract that is presented in the amended budget (ESSA).


Contract Description: The Integrated Status and Effectiveness Monitoring Program (ISEMP, 2003-017-00) is an ongoing collaborative effort to design, test, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and their habitat, and watershed-scale Effectiveness Monitoring for management actions impacting salmon and steelhead populations and habitat in the Interior Columbia River Basin.

ISEMP explicitly addresses work requirements of many 2008 FCRPS Biological Opinion RPAs (56.1, 56.2, 56.3, 57.1, 57.2, 57.3, 57.4, 57.5) and is directly related to additional 2008 FCRPS Biological Opinion implementation strategy requirements and recommendations. ISEMP takes a pilot-project approach to the research and development of monitoring by implementing experimental programs in several major subbasins of the Interior Columbia: the Wenatchee, Entiat, Methow, John Day, South Fork Salmon and Lemhi River basins. The overall goal of the project is to provide regional salmon management agencies with the data, information and tools necessary to design efficient and effective monitoring programs.

Specifically, ISEMP generates quantitative guidance on and examples of: the robustness and limitations of population and habitat monitoring protocols, indicators and metrics; sampling design approaches for the distribution of monitoring effort in time and space; analytical approaches to the evaluation of monitoring data, information and programs; effective data management and communication designs that support the use, standardization and compilation of implementation, compliance, status, trends and effectiveness monitoring data by regional data generators and decision makers; and finally the design and implementation of watershed-scale restoration actions to maximize both the biological impact and associated learning opportunities resulting from the design and implementation strategy.

Through its work to date, ISEMP has developed expertise in the coordination and implementation of large-scale monitoring data collection programs. Applying this experience, ISEMP coordinates the installation, maintenance and calibration of in-stream PIT tag arrays across the Snake River basin and is designing and coordinating the implementation of a Columbia River basin-wide stream habitat status and trends monitoring. These programmatic implementation facets of ISEMP leverage previous experience with logistics and social factors to effectively implement comprehensive, standardized monitoring research and development at an unprecedented scale.  

This contract is one of several contracts that will implement this project.

The final report for this contract will contain data that will 1) be submitted to NOAA Fisheries (also a contractor under this project) for use in a project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.  Quantitative Consultants, Inc.  role has been, and continues to be, to enable the Bonneville Power Administration to implement Project #2003-017-00 in the Salmon River subbasin and other pilot subbasins.

For 2011, the scope of ISEMP has expanded to coordinate the installation and long-term administration of new tandem instream PIT Tag arrays in the South Fork Clearwater River, Lolo Creek, the Grande Ronde River, Joseph Creek, the Imnaha River, and the mainstem upper Salmon River. Additionally, ISEMP was tasked to undertake the operation and administration of existing PIT tag arrays in Valley Creek (upper Salmon River) and Big Creek (Middle Fork Salmon River). ISEMP was identified as the project lead for this work owing to efforts beginning in 2005 to implement instream PIT tag arrays in the South Fork Salmon River and Lemhi Rivers as part of the ISEMP project. In concert with the installation and operation of these arrays, ISEMP, in cooperation with the Nez Perce Tribe, Idaho Department of Fish and Game, PITAGIS, and Biomark has undertaken the development of standardized data storage/retrieval and analysis approaches specifically for adult and juvenile interrogation data generated by instream PIT tag array systems.

The Salmon portion of the ISEMP project began in 2005 with the completion of a study design (attached and available at http://www.nwfsc.noaa.gov/research/divisions/cbd/mathbio/isemp/docs_salmon.cfm#2005), which received a positive review by the Independent Scientific Review Panel in 2006 (ISRP 2006-1; attached and available at http://www.nwfsc.noaa.gov/research/divisions/cbd/mathbio/isemp/docs_salmon.cfm#2005). Implementation of the ISEMP project in the Salmon subbasin was funded in FY2008, with on-the-ground actions commencing in FY2009.
Account Type(s):
Expense
Contract Start Date:
12/01/2010
Contract End Date:
11/30/2011
Current Contract Value:
$1,837,680
Expenditures:
$1,837,680

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc Yes Contract Manager chris@qcinc.org (360) 620-2883
Nick Bouwes Eco Logical Research Yes Interested Party nbouwes@gmail.com (435) 760-0771
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Matthew Campbell Idaho Department of Fish and Game (IDFG) No Interested Party matthew.campbell@idfg.idaho.gov (208) 939-6713
Mickey Carter Bonneville Power Administration No Interested Party macarter@bpa.gov (503) 230-5885
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Lance Hebdon Idaho Department of Fish and Game (IDFG) No Interested Party lance.hebdon@idfg.idaho.gov (208) 287-2711
Chris Jordan National Oceanic and Atmospheric Administration Yes Supervisor chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Interested Party pamela@terraqua.biz (509) 885-8143
Charles Petrosky Idaho Department of Fish and Game (IDFG) No Interested Party cpetrosk@idfg.idaho.gov
Steve Rentmeester Environmental Data Services Yes Interested Party environmentaldataservices@gmail.com (503) 247-8431
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jason Vogel Nez Perce Tribe No Technical Contact jasonv@nezperce.org (208) 621-3602
Carol Volk South Fork Research, Inc. Yes Interested Party carol@southforkresearch.org (206) 240-0301
Jody White Quantitative Consultants Inc Yes Technical Contact jody@qcinc.org (208) 860-5269


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Documentation B: 165. Environmental Compliance Documentation 06/01/2011 06/01/2011
Funding Package - Submit draft to COTR C: 119. Project Management 09/01/2011 11/15/2011
Produce Draft Progress Report D: 132. Complete Draft Progress Report for the period (Dec 2010) to (Nov 2011) 11/30/2011 11/30/2011
Task 1A: Juvenile sampling and marking data. E: 157. Task 1A: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 11/30/2011 11/30/2011
Task 1A: Juvenile tagging data. F: 158. Task 1A: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2011 11/30/2011
Task 1C: Juvenile sampling and marking data. G: 157. Task 1B: Conduct juvenile seining and PIT tagging activities in the Lemhi River. 11/30/2011 11/23/2011
Task 1C: Juvenile tagging data. H: 158. Task 1B: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 11/30/2011 11/30/2011
South Fork Salmon River habitat survey data. I: 157. Task 2: South Fork Salmon River habitat sampling and LiDAR validation. 11/30/2011 11/30/2011
Task 3A: Report on South Fork Salmon River PIT tag array performance and PIT tag detections. J: 157. Task 3A: Operate PIT tag Arrays in South Fork Salmon River. 11/30/2011 11/30/2011
Task 3B: Report on Lemhi River PIT tag array performance and PIT tag detections. K: 157. Task 3B: Operate PIT tag Arrays in the Lemhi River. 11/30/2011 11/30/2011
Task 4A: Install/remove rotary screw traps. L: 70. Task 4A: Install/remove South Fork Salmon River rotary screw traps. 11/30/2011 11/30/2011
Task 4A: Report juvenile capture data, biological information, and PIT tagging data for SFSR t M: 157. Task 4A: Operate ISEMP screw traps in South Fork Salmon River. 11/30/2011 11/30/2011
Task 4B: Install/remove rotary screw traps. N: 70. Task 4B: Assist in installation/removal of Lemhi River rotary screw traps. 11/15/2011 11/15/2011
Task 4B: Report juvenile capture data, biological information, and PIT tagging data for Lemhi O: 157. Task 4B: Assist in operation of screw traps in Lemhi River. 11/30/2011 11/30/2011
Task 5: Lower Granite Dam adult PIT tagging and biological sample data. P: 157. Task 5: Lower Granite Dam adult PIT tagging and data synthesis. 11/30/2011 11/30/2011
Task 5: Conduct adult PIT tagging. Q: 158. Task 5: Lower Granite Dam adult PIT tagging. 11/30/2011 11/30/2011
Develop and Refine ISEMP Survey Protocols R: 156. Develop and Refine ISEMP Survey Protocols 11/30/2011 11/30/2011
Enter data using Automated Template Module in ISEMP Database S: 159. Enter data using Automated Template Module in ISEMP Database (IDFG) 11/30/2011 11/30/2011
Enter data using Automated Template Module in ISEMP Database T: 159. Enter data using Automated Template Module in ISEMP Database (Nez Perce Tribe) 11/30/2011 11/30/2011
Salmon and John Day subbasin Database support and data QA/QC U: 160. Manage databases for Salmon and John Day sub-basins 11/30/2011 11/30/2011
Database trainings and data migration assistance to John Day and Salmon basins V: 161. Database training and support for Salmon and John Day basins 11/30/2011 11/30/2011
Salmon Subbasin Data Analysis W: 162. ISEMP Salmon subbasin data analysis 11/30/2011 11/30/2011
ISEMP Regional Data Analysis X: 162. ISEMP Regional Data Analysis 11/30/2011 11/30/2011
Produce ISEMP funded activities annual report (IDFG) Y: 141. Produce Annual Report on ISEMP Activities (IDFG) 11/15/2011 11/15/2011
Produce ISEMP funded activities annual report (IDFG) Z: 141. Produce Annual Report on ISEMP Activities (Nez Perce) 11/15/2011 11/15/2011
ISEMP Salmon Subbasin Annual Report Review AA: 122. ISEMP Salmon Subbasin Annual Report Review 11/30/2011 11/30/2011
ISEMP Coordination (QCI) AB: 189. ISEMP Project Coordination (QCI) 11/30/2011 11/30/2011
ISEMP Project Coordination (IDFG) AC: 189. ISEMP Project Coordination (IDFG) 11/30/2011 11/30/2011
ISEMP Project Coordination (NPT) AD: 189. ISEMP Project Coordination (Nez Perce) 11/30/2011 11/30/2011
ISEMP Salmon Subbasin Coordination (QCI) AE: 191. ISEMP Salmon Subbasin Coordination (QCI) 11/30/2011 11/30/2011
ISEMP Salmon Subbasin Coordination (IDFG) AF: 191. ISEMP Salmon Subbasin Coordination (IDFG) 11/30/2011 11/30/2011
ISEMP Salmon Subbasin Coordination (NPT) AG: 191. ISEMP Salmon Subbasin Coordination (Nez Perce) 11/30/2011 11/30/2011
ISEMP Annual Review AH: 141. ISEMP Annual Draft Report Review 11/30/2011 11/30/2011
Obtain permits for installation of PIT tag arrays proposed under the fast-track proposal process AI: 165. Obtain permits for installation of PIT tag arrays proposed under the fast-track proposal process 07/10/2011 11/30/2011
Manage PIT tag array installation for PIT tag arrays proposed under the fast-track review proc AJ: 119. Manage PIT tag array installation for PIT tag arrays proposed under the fast-track review proc 11/30/2011 11/30/2011
Annual report describing implementation of PIT tag arrays proposed in the fast-track process. AK: 132. Submit Progress Report for the period (12/2010) to (11/2011) 11/30/2011 11/30/2011
Conduct site surveys to identify primary and backup location for PIT tag arrays. AL: 175. Conduct site surveys to identify primary and backup location for PIT tag arrays. 08/01/2011 06/30/2011
Assist in installation of PIT tag arrays. AM: 70. Assist in installation of PIT tag arrays. 11/30/2011 11/30/2011
Operate ISEMP PIT tag arrays funded under the fast-track process. AN: 157. Operate ISEMP PIT tag arrays funded under the fast-track process. 11/30/2011 11/30/2011
Operate ISEMP PIT tag arrays (Biomark Yearly O&M) AO: 157. Operate ISEMP PIT tag arrays (Biomark Yearly O&M) 11/30/2011 11/30/2011
Transfer PIT tag array data to QCInc server, STEM databank, and PTAGIS. AP: 159. Transfer PIT tag array data to QCInc server, STEM databank, and PTAGIS. 11/30/2011 11/30/2011
Program and maintain PIT tag array data storage system. AQ: 160. Program and maintain PIT tag array data storage system. 11/30/2011 11/30/2011
Transfer PIT tag array data to regional databases, comanagers, and serve summary data AR: 161. Transfer PIT tag array data to regional databases, comanagers, and serve summary data 11/30/2011 11/30/2011
Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. AS: 162. Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. 11/30/2011 11/30/2011
LiDAR Data Analysis and Habitat Metric Development AT: 162. LiDAR Data Analysis and Habitat Metric Development 11/30/2011 11/30/2011
Cumulative Analysis Report AU: 132. Cumulative Analysis Report 07/31/2011 09/02/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 10 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 4 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 2 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 175 Produce Design
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 10 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 4 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2010
B 165 Environmental Compliance Documentation 12/01/2010
C 119 Project Management 12/01/2010
D 132 Complete Draft Progress Report for the period (Dec 2010) to (Nov 2011) 12/01/2010
E 157 Task 1A: Conduct juvenile seining and PIT tagging activities in the South Fork Salmon River. 12/01/2010
F 158 Task 1A: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 12/01/2010
G 157 Task 1B: Conduct juvenile seining and PIT tagging activities in the Lemhi River. 12/01/2010
H 158 Task 1B: Mark/Tag juvenile anadromous salmonids captured in seining surveys. 12/01/2010
I 157 Task 2: South Fork Salmon River habitat sampling and LiDAR validation. 12/01/2010
J 157 Task 3A: Operate PIT tag Arrays in South Fork Salmon River. 12/01/2010
K 157 Task 3B: Operate PIT tag Arrays in the Lemhi River. 12/01/2010
L 70 Task 4A: Install/remove South Fork Salmon River rotary screw traps. 12/01/2010
M 157 Task 4A: Operate ISEMP screw traps in South Fork Salmon River. 12/01/2010
N 70 Task 4B: Assist in installation/removal of Lemhi River rotary screw traps. 12/01/2010
O 157 Task 4B: Assist in operation of screw traps in Lemhi River. 12/01/2010
P 157 Task 5: Lower Granite Dam adult PIT tagging and data synthesis. 12/01/2010
Q 158 Task 5: Lower Granite Dam adult PIT tagging. 12/01/2010
R 156 Develop and Refine ISEMP Survey Protocols 12/01/2010
S 159 Enter data using Automated Template Module in ISEMP Database (IDFG) 12/01/2010
T 159 Enter data using Automated Template Module in ISEMP Database (Nez Perce Tribe) 12/01/2010
U 160 Manage databases for Salmon and John Day sub-basins 12/01/2010
V 161 Database training and support for Salmon and John Day basins 12/01/2010
W 162 ISEMP Salmon subbasin data analysis 12/01/2010
X 162 ISEMP Regional Data Analysis 12/01/2010
Y 141 Produce Annual Report on ISEMP Activities (IDFG) 12/01/2010
Z 141 Produce Annual Report on ISEMP Activities (Nez Perce) 12/01/2010
AA 122 ISEMP Salmon Subbasin Annual Report Review 12/01/2010
AB 189 ISEMP Project Coordination (QCI) 12/01/2010
AC 189 ISEMP Project Coordination (IDFG) 12/01/2010
AD 189 ISEMP Project Coordination (Nez Perce) 12/01/2010
AE 191 ISEMP Salmon Subbasin Coordination (QCI) 12/01/2010
AF 191 ISEMP Salmon Subbasin Coordination (IDFG) 12/01/2010
AG 191 ISEMP Salmon Subbasin Coordination (Nez Perce) 12/01/2010
AH 141 ISEMP Annual Draft Report Review 12/01/2010
AI 165 Obtain permits for installation of PIT tag arrays proposed under the fast-track proposal process 12/01/2010
AJ 119 Manage PIT tag array installation for PIT tag arrays proposed under the fast-track review proc 12/01/2010
AK 132 Submit Progress Report for the period (12/2010) to (11/2011) 12/01/2010
AL 175 Conduct site surveys to identify primary and backup location for PIT tag arrays. 12/01/2010
AM 70 Assist in installation of PIT tag arrays. 12/01/2010
AN 157 Operate ISEMP PIT tag arrays funded under the fast-track process. 12/01/2010
AO 157 Operate ISEMP PIT tag arrays (Biomark Yearly O&M) 12/01/2010
AP 159 Transfer PIT tag array data to QCInc server, STEM databank, and PTAGIS. 12/01/2010
AQ 160 Program and maintain PIT tag array data storage system. 12/01/2010
AR 161 Transfer PIT tag array data to regional databases, comanagers, and serve summary data 12/01/2010
AS 162 Develop and test methods to calculate instantaneous and periodic PIT tag array efficiency. 12/01/2010
AT 162 LiDAR Data Analysis and Habitat Metric Development 12/01/2010
AU 132 Cumulative Analysis Report 12/01/2010