Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 51817: 1996-040-00 EXP COHO RESTORATION MID-COLUMBIA - YN
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
51817
Contract Title:
1996-040-00 EXP COHO RESTORATION MID-COLUMBIA - YN
Contract Continuation:
Previous: Next:
46617: 1996-040-00 EXP ACCORD MID-C COHO RESTORATION - YN
  • 56337: 1996-040-00 EXP COHO RESTORATION MID-COLUMBIA
Contract Status:
Closed
Contract Description:
The long term vision of this restoration project is to restore coho salmon to the Wenatchee and Methow river basins at biologically sustainable levels that will support harvest in most years. The project works toward development of locally adapted, naturally spawning coho populations in the Wenatchee and Methow subbasins by increasing the fitness of reintroduced coho salmon by reducing domestication and emphasizing local adaptation. The program will use strict broodstock collection protocols, which ultimately will place a limit on the proportion of natural origin adults in the hatchery program and place a limit on the proportion of hatchery origin adults on the spawning ground. Hatchery smolt production work is covered under BPA contracts with other agencies.  The U.S. Fish and Wildlife Service is contracted to full-term rear coho at Willard NFH and Winthrop NFH while also providing spawning, incubation and acclimation space at Leavenworth NFH and Winthrop NFH.  Willard NFH is partially funded through Mitchell Act while all of the rearing costs associated with Cascade FH are Mitchell Act.  Winthrop fall activities and subsequent full-term rearing of these juveniles is funded through BOR.  This will be the 2nd season that Leavenworth NFH will be utilized as the primary adult holding/spawning location for the Wenatchee program.  Leavenworth will be contracted directly through BPA to provide adult holding and spawning space for the Wenatchee coho program.  Transportation of smolts from lower river facilities to acclimation ponds in the Wenatchee and Methow rivers is done through a direct contract between Oregon Department of Fish and Wildlife and BPA as well as utilizing Yakama Nation drivers to supplement ODFW transports.  

This SOW includes includes work elements for tasks that will be completed prior to January 31st, 2012.  This 12-month contract is being put in place through Accord funding that will include fall activities for the 2011CY and extend through the early winter 2012CY.  Cost-share funding through Chelan County PUD and Grant County PUD play a critical role in assisting with meeting project costs/goals.  For example, Chelan PUD funds will pay entirely for dredging and expansion of Rohlfing's Pond, which are NOT part of this contract.  CWT'ing will be paid through a subcontract between USFWS and YN (BPA funding) for marking of the 2010BY.  O&M and M&E activities; to include broodstock collection, spawning, egg incubation and transportation to the lower Columbia River rearing facilities, spawning ground surveys, and subsequent data collection and CWT extraction for both the Wenatchee and Methow basins will be approximately 50% covered by the cost-sharing through the PUD's.  Concurrent project management, data analysis, and database management will also be approximately 50% covered by the PUD cost-share.   BPA will be responsible for partial funding of all O&M and M&E activities in the winter, spring, and summer, and fall for the 2011 calendar year as well as the winter 2012.  These activities include overwinter acclimation, spring acclimation and all related data collection and analysis, and a repeat of the above listed fall activities for 2011.  Reporting period extends into the next years contract and will be addressed in the SOW.  The program will also take this opportunity to develop a comprehensive brood report to try and identify trends and standards established within the program recent successes.
Account Type(s):
Expense
Contract Start Date:
02/01/2011
Contract End Date:
01/31/2012
Current Contract Value:
$1,830,606
Expenditures:
$1,830,606

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Loverne George Yakama Confederated Tribes Yes Interested Party geol@yakamafish-nsn.gov (509) 865-5121x6364
Cory Kamphaus Yakama Confederated Tribes Yes Technical Contact kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Contract Manager scrt@yakamafish-nsn.gov (503) 331-9850
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain environmental compliance B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 01/31/2012 01/31/2012
Facility Design, Facility Permitting, Studies, and Surveys for the Step 2 process C: 169. Continue the Step 2 process towards implementation of Long-Term Plan 01/31/2012 01/31/2012
Council/BPA approval to proceed to construction D: 170. Begin with proceeding into the Step 3 of the 3-Step process 12/13/2011
Conduct and document maintenance and repair activities E: 61. Subcontract O&M for maintenance of facilities 01/29/2012 01/29/2012
Manage and administer project, February 1, 2011 through January 31, 2012 F: 119. Manage and Administer 2011-2012 Project for Mid Columbia Coho Restoration 01/31/2012 01/31/2012
Acclimated smolts released G: 176. Acclimation/Release: Wenatchee: Coulter Creek pond (BY 2009) 06/10/2011 06/10/2011
Acclimated smolts released H: 176. Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2009) 06/10/2011 06/10/2011
Acclimated smolts released I: 176. Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2009) 06/09/2011 06/09/2011
Acclimated smolts released J: 176. Acclimation/Release: Wenatchee: Nason Creek wetlands (BY 2009) 06/08/2011 06/08/2011
Acclimated smolts released K: 176. Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2009) 06/11/2011 06/11/2011
Acclimated smolts released L: 176. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2009) 04/30/2011 04/30/2011
Acclimated smolts released M: 176. Acclimation/Release: Winthrop NFH back channel rearing (BY 2009) 06/01/2011 06/01/2011
Acclimated smolts released N: 176. Acclimation/Release: Methow: Twisp Ponds (BY 2009) 06/07/2011 06/07/2009
CWT tag fish BY2010 O: 158. Mark/Tag Animals - Subcontract CWT of approximately 1,500,000 BY10 coho pre-smolts 10/30/2011 10/30/2011
Collection of 2011 Coho Broodstock: Wenatchee and Methow programs P: 66. Trap 2011 broodstock at Dryden, Tumwater, Wells, LTP, Methow FH, Winthrop NFH and LNFH 12/08/2011 12/08/2011
Spawn 2010 brood coho at Leavenworth NFH Q: 176. Spawn 2011 brood coho at Leavenworth NFH 11/28/2011 11/28/2011
Spawn 2011 coho broodstock at Winthrop NFH R: 176. Spawn 2011 brood coho at Winthrop NFH 11/26/2011 11/26/2011
Carcass distribution for BY2011 broodstock S: 44. Carcass dispersal of a portion of 2011 broodstock in the Wenatchee and 100% Methow River programs 01/31/2012 01/31/2012
Incubate 2011 Wenatchee brood coho eggs at the Peshastin Incubation Facility T: 176. Incubate 2011 brood coho eggs at the Peshastin Incubation Facilities 01/15/2012 01/15/2012
Transport 2011 BY eyed coho eggs to rearing facilities U: 66. Transport 2011 brood eyed-eggs from incubation facilities to rearing facilities 01/16/2012 01/16/2012
Coho redd counts and spawning composition for the 2011 BY V: 157. Conduct spawning ground surveys for the 2011 brood in the Wenatchee Basin 01/31/2012 12/31/2011
2011 BY coho redd counts and spawning composition W: 157. Conduct spawning ground surveys for the 2011 brood in the Methow Basin 12/31/2011 12/31/2011
Completed database X: 157. Collect biological data from 2011 brood coho at spawning 01/31/2012 01/31/2012
CWT recovery data from the 2011 BY Y: 157. Extract CWT from 2011 brood coho snouts collected at spawning and on spawning ground surveys 01/31/2012 01/31/2012
Out-plant a portion of 2011 coho returns: LNFH ladder to Nason Creek Z: 66. Outplant a portion of the 2011 returns collected at LNFH to the upper Wenatchee Basin 12/01/2011 12/01/2011
Juvenile fish transfer of the 2010 BY for overwintering at Leavenworth NFH AA: 66. Transport BY10 coho from LCR facilities to LNFH for overwinter acclimation 12/15/2011 12/15/2011
PIT tag fish 2010 BY AB: 158. Mark/Tag Animals - PIT-tag 52,000 BY10 coho pre-smolts 01/31/2012 01/31/2012
Analyze data from 2010 BY AC: 162. Analyze and interpret M&E data from 2010 brood 01/31/2012 01/31/2012
Enter data AD: 160. Enter data into and maintain local databases 09/30/2011 09/30/2011
Collect data from 2009 and 2010BY AE: 157. Collect/Generate Field and Lab Data to determine 2011 emergence timing, growth and distributio 10/15/2011 10/15/2011
Finalize FY 10 progress report uploaded/attached in Pisces AF: 132. Submit Annual Report for the FY10 period (10/1/09 to 9/30/10) 03/31/2011 08/05/2011
Multiyear report uploaded/attached in Pisces AG: 141. Submit comprehensive brood report for Mid Columbia Coho Reintroduction Program 01/31/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 11 instances of WE 176 Produce Hatchery Fish
  • 4 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
  • 1 instance of WE 169 Council 3-step Process: Step 2
  • 1 instance of WE 170 Council 3-step Process: Step 3

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2011
B 165 Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction 02/01/2011
C 169 Continue the Step 2 process towards implementation of Long-Term Plan 02/01/2011
D 170 Begin with proceeding into the Step 3 of the 3-Step process 02/01/2011
E 61 Subcontract O&M for maintenance of facilities 04/01/2009
F 119 Manage and Administer 2011-2012 Project for Mid Columbia Coho Restoration 02/01/2011
G 176 Acclimation/Release: Wenatchee: Coulter Creek pond (BY 2009) 02/01/2011
H 176 Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2009) 02/01/2011
I 176 Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2009) 02/01/2011
J 176 Acclimation/Release: Wenatchee: Nason Creek wetlands (BY 2009) 02/01/2011
K 176 Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2009) 02/01/2011
L 176 Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2009) 02/01/2011
M 176 Acclimation/Release: Winthrop NFH back channel rearing (BY 2009) 02/01/2011
N 176 Acclimation/Release: Methow: Twisp Ponds (BY 2009) 02/01/2011
O 158 Mark/Tag Animals - Subcontract CWT of approximately 1,500,000 BY10 coho pre-smolts 02/01/2011
P 66 Trap 2011 broodstock at Dryden, Tumwater, Wells, LTP, Methow FH, Winthrop NFH and LNFH 02/01/2011
Q 176 Spawn 2011 brood coho at Leavenworth NFH 02/01/2011
R 176 Spawn 2011 brood coho at Winthrop NFH 02/01/2011
S 44 Carcass dispersal of a portion of 2011 broodstock in the Wenatchee and 100% Methow River programs 02/01/2011
T 176 Incubate 2011 brood coho eggs at the Peshastin Incubation Facilities 02/01/2011
U 66 Transport 2011 brood eyed-eggs from incubation facilities to rearing facilities 02/01/2011
V 157 Conduct spawning ground surveys for the 2011 brood in the Wenatchee Basin 02/01/2011
W 157 Conduct spawning ground surveys for the 2011 brood in the Methow Basin 02/01/2011
X 157 Collect biological data from 2011 brood coho at spawning 02/01/2011
Y 157 Extract CWT from 2011 brood coho snouts collected at spawning and on spawning ground surveys 02/01/2011
Z 66 Outplant a portion of the 2011 returns collected at LNFH to the upper Wenatchee Basin 02/01/2011
AA 66 Transport BY10 coho from LCR facilities to LNFH for overwinter acclimation 02/01/2011
AB 158 Mark/Tag Animals - PIT-tag 52,000 BY10 coho pre-smolts 02/01/2011
AC 162 Analyze and interpret M&E data from 2010 brood 02/01/2011
AD 160 Enter data into and maintain local databases 02/01/2011
AE 157 Collect/Generate Field and Lab Data to determine 2011 emergence timing, growth and distributio 02/01/2011
AF 132 Submit Annual Report for the FY10 period (10/1/09 to 9/30/10) 02/01/2011
AG 141 Submit comprehensive brood report for Mid Columbia Coho Reintroduction Program 02/01/2011