Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 52547: 2008-904-00 EXP SALMON RIVER BASIN NUTRIENT ENHANCEMENT
Project Number:
Title:
Salmon River Basin Nutrient Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
52547
Contract Title:
2008-904-00 EXP SALMON RIVER BASIN NUTRIENT ENHANCEMENT
Contract Continuation:
Previous: Next:
47275: 2008-904-00 EXP SBT ACCORD NUTRIENT SUPPLEMENTATION
  • 57046: 2008-904-00 EXP SALMON RIVER BASIN NUTRIENT ENHANCEMENT
Contract Status:
Closed
Contract Description:
In 2011, the Salmon River Basin Nutrient Enhancement project will continue to collect chemical, physical, and biological data to evaluate the efficacy of artificial nutrient treatments designed to increase freshwater productivity and the growth and survival of stream-dwelling salmonids in the upper Salmon River Basin.  The project is a continuation of an initial 4 year experimental design consisting of three years of treatment (2010, 2011, and 2012), followed by 1 year of post-treatment (2013) data collections.  Specific project objectives include the quantification and assessment of: streamwater nutrient concentrations; nutrient limitation; course particulate organic matter retention; periphyton standing stock; macroinvertebrate density, biomass, and community composition; the bioenergetics, growth, and survival of resident and anadromous fishes; leaf litter decay rates, river metabolism measures, and aquatic food web connections in treatment streams receiving nutrient additions (n=4) and control streams (n=2) that do not receive nutrient additions.  The bioenergetics assessment of stream-dwelling salmonids will be conducted by the SBT and Dr. Ernest Keeley (Idaho State University).  The autotrophic, nutrient limitation, and river metabolism measures will be conducted by the SBT and Dr. Amy Marcarelli (Michigan Technological University).  Macroinvertebrate sorting and identification, leaf pack AFDM, and stable isotope (periphyton, macroinvertebrate, and fish) sample analyses will also be conducted by Robert Wisseman (Aquatic Biology Associates) and Dr. Bruce Finney (Idaho State University).
Account Type(s):
Expense
Contract Start Date:
05/01/2011
Contract End Date:
04/30/2012
Current Contract Value:
$375,010
Expenditures:
$375,010

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mickey Carter Bonneville Power Administration No Interested Party macarter@bpa.gov (503) 230-5885
Chad Colter Shoshone-Bannock Tribes Yes Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Andre Kohler Shoshone-Bannock Tribes Yes Contract Manager akohler@sbtribes.com (208) 239-4566
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Dawn Williams Shoshone-Bannock Tribes No Interested Party dwilliams@sbtribes.com (208) 478-3927


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance A: 165. Produce Contract Environmental Compliance and Permitting Documentation 04/30/2012 04/25/2012
Funding Package - Submit draft to COTR B: 119. Contract Management and Administration 02/01/2012 02/01/2012
Baseline and treatment period data collections, analyses, and reporting summaries C: 157. Collect Chemical, Physical, and Biological Data in Study Streams 02/29/2012 02/29/2012
Chemical, physical, and biological variable data analyses D: 162. Chemical, Physical, and Biological Data Evaluations 03/31/2012 03/31/2012
Dissemination of SRBNE related raw and/or summary data and results E: 161. Facilitate the dissemination of summary data and results 04/30/2012 04/25/2012
PIT tag juvenile salmonid fishes F: 158. PIT Tag Salmonids for Growth and Survival Evaluations 10/31/2011 10/31/2011
PTAGIS database transfers G: 159. Upload PIT Tag Data to Centralized Database 02/29/2012 02/29/2012
Attach Progress Report in Pisces H: 132. Submit Progress Report for the period 1 May, 2010 to 30 April, 2011 04/15/2012 04/15/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Contract Environmental Compliance and Permitting Documentation 05/01/2011
B 119 Contract Management and Administration 05/01/2011
C 157 Collect Chemical, Physical, and Biological Data in Study Streams 12/28/2011
D 162 Chemical, Physical, and Biological Data Evaluations 05/01/2011
E 161 Facilitate the dissemination of summary data and results 05/01/2011
F 158 PIT Tag Salmonids for Growth and Survival Evaluations 12/28/2011
G 159 Upload PIT Tag Data to Centralized Database 05/01/2011
H 132 Submit Progress Report for the period 1 May, 2010 to 30 April, 2011 05/01/2011
I 185 Periodic Status Reports for BPA 05/01/2011