Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 54675: 9202601 EXP BIOP TROUT CRK/ALPINE MEADOWS IRRIGATION FISH PASSAGE
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
54675
Contract Title:
9202601 EXP BIOP TROUT CRK/ALPINE MEADOWS IRRIGATION FISH PASSAGE
Contract Continuation:
Previous: Next:
n/a
  • 59879: 1992-026-01 EXP TROUT CRK/ALPINE MEADOWS FISH PASSAGE 13
Contract Status:
Closed
Contract Description:
Trout Creek a tributary to the Wallowa River is a steelhead-producing stream in Wallowa County.  Juvenile Chinook also rear in lower Trout Creek.  At the lower end are the AMGC and the COE wastewater treatment facility.  The golf course currently pumps water out of Trout Creek for irrigation and the COE discharges wastewater to the Wallowa River just above the Trout Creek Wallowa River confluence.  The removal of the golf course pump station and the reduction of wastewater discharge to the Wallowa River are expected to improve both water quantity and quality respectively.    

Work Dates - Construction work will start in the fall of 2011.  All out of stream work can be completed during the fall, winter and spring months and includes pond construction, pump installation, and irrigations system modifications.  Any necessary instream work will occur between July 15th and August 15th of 2012 and the project will be complete in the fall of 2012.

Project Objectives:
  
1.   Improve flow in Trout Creek by using treated effluent from City of Enterprise wastewater treatment facility as an alternative to withdrawing water from Trout Creek.
2.   Improve passage in Trout Creek by removing a channel-spanning dam that creates a pumping pool at the pump station.
3.   Decrease sedimentation and erosion in Trout Creek by eliminating the need for annual dam, pool & intake maintenance.

Specific Actions:

•   Use treated effluent for irrigation along with the existing dechlorination pond - meeting the objective of the project and providing benefit to AMGC.
•   Resourceful water use.
•   Effluent discharge decreased to the Wallowa River and water quality improved.
•   New pump station located on the golf course as opposed to alternative 3a, which would locate the station off site.  
•   Less piping than alternatives 2 and 3a.
•   Reduces mass loading to the Wallowa River during the summer months.

Benefits:

The implemented project will have the following instream benefits as a result of removing the pump station from Trout Creek and irrigating with treated city wastewater:

1.   Flow will be improved in Trout Creek from the existing pump station downstream to the confluence with the Wallowa River.  This is approximately 2 stream miles of improved flow.  
2.   Passage will be improved in Trout Creek from the existing pump station to habitat extending approximately 2 miles upstream.
3.   Sedimentation will be reduced on the lower 2 miles of Trout Creek and erosion will be eliminated at the pump station.
4.   Water quality will improve in Trout Creek and the Wallowa River due to improved summer season flow and reduced wastewater discharge.
Account Type(s):
Expense
Contract Start Date:
10/01/2011
Contract End Date:
12/31/2012
Current Contract Value:
$16,239
Expenditures:
$16,239

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mary Estes Grande Ronde Model Watershed Foundation No Administrative Contact mary@grmw.org (541) 663-0570
Christopher Furey Bonneville Power Administration No Interested Party chfurey@bpa.gov (503) 230-3371
Daniel Gambetta Bonneville Power Administration No Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Lyle Kuchenbecker Grande Ronde Model Watershed Foundation No Technical Contact lyle@grmw.org (541) 663-0570
Coby Menton Grande Ronde Model Watershed Foundation Yes Contract Manager rcoby@grmw.org (541) 426-0389
Jeff Oveson Grande Ronde Model Watershed Foundation No Supervisor jeff@grmw.org (541) 663-0570
David Roberts Bonneville Power Administration Yes F&W Approver daroberts@bpa.gov (503) 230-4511
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Project permits and environmental compliance documents and authorizations. A: 165. Trout Creek/Alpine Meadows Environmental Compliance 12/31/2012
Diversion structure removal and irrigation system modification B: 175. Field Survey and Final Design Package for Trout Creek/Alpine Meadows 07/16/2012
Irrigation push-up dam removed C: 84. Remove Irrigation push-up dam 08/15/2012
Construct pond & deliver COE wastewater for irrigation. D: 149. Install Pipe & Excavate Pond for Wastewater Effluent Irrigation System 12/31/2012
Project management F: 119. Project Management and Administration 12/31/2012 09/30/2012
Attach Project Completion Report in Pisces G: 132. Submit Completion Report - October 2011 - December 2012 11/15/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Trout Creek/Alpine Meadows Environmental Compliance 10/01/2011
B 175 Field Survey and Final Design Package for Trout Creek/Alpine Meadows 10/01/2011
C 84 Remove Irrigation push-up dam 01/05/2012
D 149 Install Pipe & Excavate Pond for Wastewater Effluent Irrigation System 01/05/2012
E 150 Install Pump, Piping and Sprinklers for Fresh Water Irrigation System 01/05/2012
F 119 Project Management and Administration 10/01/2011
G 132 Submit Completion Report - October 2011 - December 2012 10/01/2011
H 185 Quarterly PISCES Status Reports 10/01/2011