Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 55672: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Project Number:
Title:
Protect and Restore the Crooked and American River Watersheds
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
55672
Contract Title:
2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
53831: 2010-086-00 EXP PROTECT & RESTORE CROOKED & AMERICAN R WATERSHEDS
  • 64047: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:

This project was originally proposed during the 2007 NPCC/BPA Provincial Review.  While it did not receive funding during that process, it was recommended for funding as a FCRPS BiOp project.  This comprehensive watershed restoration effort focuses on mitigating and restoring limiting factors to fisheries production.  The primary limiting factors are excessive sedimentation in the spawning and rearing areas of streams, and the lack of available habitat and habitat connectivity.  These limiting factors are the result of past land management activities, including road construction, logging, and mining.  

The Nez Perce National Forest (NPNF) has completed several surveys, assessments, and NEPA decision documents.  The first assessment, the South Fork Landscape Assessment, was completed in 1999.  This document provided the baseline conditions for each subwatershed as well as general recommendations for future restoration efforts.  The Crooked/American Environmental Impact Statement (EIS) evaluated a complex system of watersheds using a multidisciplinary approach.  The final product included a proposed list of specific watershed restoration projects, including the Crooked/American Watershed Restoration project.

This project is a part of the BPA, Nez Perce National Forest (NPNF), and Nez Perce Tribe (NPT) Watershed Restoration Partnership.  Since the NPT program’s inception, we have shared project planning and development, costs, and implementation responsibilities.  


Summary of FY 2012 and 2013 Contract Implementation:
                                                                                                                                                                                                                                              
FY 2012 and 2013 contract implementation will include the decommissioning of 2.6 miles of roads in American River, treating invasive weeds and mechanically planting vegetation along approximately 2 miles of Crooked River, producing a feasibility study, design, and environmental compliance documents for the Lower Crooked River Channel Reconstruction and Narrows Road Improvement, producing designs for one culvert replacement on the 311 Road, one culvert replacement on Five Mile Creek, one culvert replacement on Rainbow Gulch, and the execution of one culvert replacement on the 311 Road and two culvert replacements on Rainbow Gulch.  Two fish barriers (road crossings without culverts) will be removed on Rainbow Gulch.  Contract implementation will also include the inventory, assessment, and prioritization of culvert, bridge, and road improvement projects in American and Crooked Rivers.  Early negotiations will also continue in the pursuit of the potential acquisition of the Maines Estate property in the American River subwatershed.
Account Type(s):
Expense
Contract Start Date:
03/01/2012
Contract End Date:
02/28/2014
Current Contract Value:
$1,169,437
Expenditures:
$1,169,437

* Expenditures data includes accruals and are based on data through 30-Apr-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Jenifer Harris Nez Perce Tribe Yes Contract Manager jeniferh@nezperce.org (208) 983-1290
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Amber MacLachlan Bonneville Power Administration Yes Contracting Officer almcmahon@bpa.gov (503) 230-3983
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation Submitted to BPA A: 165. Submit Environmental Compliance Documentation to BPA 01/31/2014 07/12/2013
Environmental Compliance Documents for LCR Channel Reconstruction and Narrows Road Improvement B: 165. Lower Crooked River Channel Reconstruction and Narrows Road Improvement NEPA 02/28/2014 02/27/2014
Culvert, Bridge, and Road Data Collected C: 115. Collect Data on Existing Culverts, Bridges, and Roads in American and Crooked River 02/28/2014 02/27/2014
Feasibility Study and Designs for LCR Channel Reconstruction and Narrows Road Improvement D: 175. LCR Channel Reconstruction Design and Narrows Road Improvement Feasibility Study 02/28/2014 03/29/2013
Culvert Design for 311 Road F: 175. Design for 311 Road Culvert 02/28/2013 02/28/2013
Design for Five Mile Creek Culvert Replacement G: 175. Design for Five Mile Creek Culvert 05/17/2013 05/17/2013
Replace Culvert on 311 Road J: 85. Replace Culvert on 311 Road 11/29/2013 09/12/2013
Road Decommissioning Completed K: 33. American River Road Decommissioning 11/02/2012 10/08/2012
Inventory and Weed Treatment Along 2 Miles of Crooked River L: 197. Treat Noxious and Invasive Weeds in Crooked River 01/31/2014 11/01/2013
Riparian Vegetation Planted M: 47. Plant Riparian Vegetation - Crooked River 10/31/2013 10/11/2013
Culvert/Bridge Data Collected O: 157. Culvert/Bridge Replacement and Removal Data Collection 11/30/2013 10/11/2013
Decommissioned Roads Data Collected P: 157. Decommissioned/Improved Roads Data Collection 11/22/2013 09/12/2013
Habitat, Biological, and Chemical Data Collected Q: 157. Stream Habitat and Metals Monitoring Data Collection 11/01/2013 09/19/2013
Data Analyzed and 2012 and 2013 Monitoring Reports Completed R: 162. Crooked and American Data Analysis 02/15/2014 02/27/2014
FY 2014 and 2015 SOW package and FY 2012 and FY 2013 accrual estimates S: 119. Management, Coordination, and Communication 01/10/2014 01/10/2014
Final FY 2012 annual report attached to this contract T: 132. Submit Annual Report for the period 3/1/2012 - 2/28/2013 02/28/2013 02/28/2013
Final FY 2013 annual report attached to this contract U: 132. Submit Annual Report for the period 3/1/2013 - 2/28/2014 02/28/2014 02/27/2014
Design for WF American River Tributary Culvert W: 175. Design for WF American River Tributary Culvert 11/30/2012 11/30/2012
WF American River Tributary Culvert Replaced X: 184. Replace WF American River Tributary Culvert 09/07/2013 07/24/2013
Design for Little Elk Creek Culvert Replacement Y: 175. Design for Little Elk Creek Culvert Replacement 11/01/2013 11/01/2013
Design for Lightning Fork Little Elk Creek Z: 175. Design for Lightning Fork Creek Culvert Replacement 11/01/2013 11/01/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 7 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 7 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit Environmental Compliance Documentation to BPA 03/01/2012
B 165 Lower Crooked River Channel Reconstruction and Narrows Road Improvement NEPA
C 115 Collect Data on Existing Culverts, Bridges, and Roads in American and Crooked River 04/10/2012
D 175 LCR Channel Reconstruction Design and Narrows Road Improvement Feasibility Study 04/10/2012
E 175 Design for Rainbow Gulch Culvert II 03/01/2012
F 175 Design for 311 Road Culvert 04/10/2012
G 175 Design for Five Mile Creek Culvert 04/10/2012
H 85 Remove Two Fish Barriers in Rainbow Gulch 03/01/2012
I 184 Replace Two Culverts in Rainbow Gulch 03/01/2012
J 85 Replace Culvert on 311 Road 04/12/2013
K 33 American River Road Decommissioning 03/01/2012
L 197 Treat Noxious and Invasive Weeds in Crooked River 03/01/2012
M 47 Plant Riparian Vegetation - Crooked River 03/01/2012
N 172 Maines Estate Land Acquisition 03/01/2012
O 157 Culvert/Bridge Replacement and Removal Data Collection 04/10/2012
P 157 Decommissioned/Improved Roads Data Collection 04/10/2012
Q 157 Stream Habitat and Metals Monitoring Data Collection 04/10/2012
R 162 Crooked and American Data Analysis 03/01/2012
S 119 Management, Coordination, and Communication 03/01/2012
T 132 Submit Annual Report for the period 3/1/2012 - 2/28/2013 03/01/2012
U 132 Submit Annual Report for the period 3/1/2013 - 2/28/2014 03/01/2012
V 185 Periodic Status Reports for BPA 03/01/2012
W 175 Design for WF American River Tributary Culvert 03/22/2013
X 184 Replace WF American River Tributary Culvert 07/09/2013
Y 175 Design for Little Elk Creek Culvert Replacement 03/22/2013
Z 175 Design for Lightning Fork Creek Culvert Replacement 03/22/2013