Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 92: 1996-040-00 EXP MID-C COHO SITE/FACILITY DEVELOPMENT
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
56662 REL 92
Contract Title:
1996-040-00 EXP MID-C COHO SITE/FACILITY DEVELOPMENT
Contract Continuation:
Previous: Next:
56662 REL 71: 1996-040-00 EXP MID-C COHO SITE / FACILITY DEVELOPMENT
  • 56662 REL 121: 1996-040-00 EXP MID-C COHO SITE/FACILITY DEVELOPMENT
Contract Status:
Closed
Contract Description:
For the 2016 contracting period, the site development project, as part of the larger coho reintroduction project will be responsible for developing acclimation sites in the major release tributaries in the Methow and Wenatchee basins.  Current components remaining that would fall under this contract would include final site designs & associated permitting (county, USACE, NPDES, USFS special use permits, etc).  Outside of the majority of this work occurring for proposed acclimation sites, the permitting process and associated evaluations will be also occurring at the Natapoc FH site to include water withdrawal analyses and final stages of a discharge permit and securing both ground and surface water rights.

1.  Water Rights Processing through WSDOE and GeoEngineers, Inc.- As a selected contractor from WSDOE list of contractors, GeoEngineers, Inc. is able to work with Ecology to produce and review ROEs and finalized for public comment and ultimately, water right being secure.
2.  Subcontracted work will include final design at Early Winters 3 along with site permitting support in preparation for 2016 and 2017 construction at several locations in both the Methow and Wenatchee basins.  Surveying will need to occur at Trinity as well and part of the engineering bid.
3.  Dredging/sediment removal will be needed for Rohlfing's Pond in summer/fall of 2016.  Permitting aspect of that project will be covered in this SOW and operational expense will be covered in O&M / M&E operations (CR-293127)  
4.  Permit support (geotechnical) for well drilling evaluations for Tall Timber 2, Two Rivers and Trinity.
5.  Engineering and construction management of Merry Canyon in summer of 2016 (construction covered under CR-293128.


Will likely be in the final stages of amended BiOps for both USFWS and NMFS and would expect project coverage before spring of 2016.
Account Type(s):
Expense
Contract Start Date:
02/01/2016
Contract End Date:
04/30/2017
Current Contract Value:
$495,676
Expenditures:
$495,676

* Expenditures data includes accruals and are based on data through 30-Apr-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Interested Party murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Gregory Wolfe Yakama Confederated Tribes No Interested Party wolg@yakamafish-nsn.gov (509) 881-0674


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow 01/31/2017 01/31/2017
Finish consultation on BA addendums for USFWS and NMFS C: 165. Support NEPA/SEPA compliance through SAs and/or EAs and additional USFWS/NMFS ESA consultation 01/30/2017 01/30/2017
Design level drawings and permitting for acclimation sites D: 175. Produce design and specifications to include permitting for Methow sites 04/21/2017 03/30/2017
Design level drawings and permitting for acclimation sites E: 175. Produce design and specifications to include permitting for Wenatchee sites 04/07/2017
Develop and secure agreements for acclimation within conservation easements F: 98. Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow 04/01/2016 04/01/2016
Water right applications to be submitted to WSDOE; secure water rights H: 154. Work with WSDOE on securing water rights and providing documentation as needed 04/28/2017 04/17/2017
Natapoc FH I: 175. Natapoc FH facility 03/31/2017 03/31/2017
develop test well K: 171. Test Well at Trinity Acclimation site 07/01/2016 07/01/2016
develop test well L: 171. Test Well at Tall Timber 2 Acclimation site 09/30/2016
Develop test well M: 171. Test Well at Early Winters 3 Acclimation site 02/28/2017 02/28/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 98 Other
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 4 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2016
B 119 Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow 02/01/2016
C 165 Support NEPA/SEPA compliance through SAs and/or EAs and additional USFWS/NMFS ESA consultation 02/01/2016
D 175 Produce design and specifications to include permitting for Methow sites 02/01/2016
E 175 Produce design and specifications to include permitting for Wenatchee sites 02/01/2016
F 98 Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow 02/01/2016
G 132 [No Report Required] 02/01/2016
H 154 Work with WSDOE on securing water rights and providing documentation as needed 02/01/2016
I 175 Natapoc FH facility
J 171 Test Well at Two Rivers Acclimation site
K 171 Test Well at Trinity Acclimation site 12/30/2016
L 171 Test Well at Tall Timber 2 Acclimation site
M 171 Test Well at Early Winters 3 Acclimation site 08/31/2016