SOW Report
Contract 57840: 1998-019-00 EXP WIND RIVER WATERSHED UCD
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
57840
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED UCD
Contract Continuation:
Previous: Next:
53638: 1998-019-00 EXP WIND RIVER WATERSHED UCD
  • 62453: 1998-019-00 EXP WIND RIVER WATERSHED UCD
Contract Status:
Closed
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District, US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues UCD support and participation in the project.  Underwood Conservation District will provide habitat restoration work in support of the recovery of the Wind River summer steelhead stock in 2012 and 2013.  The primary component of this project is the implementation of the Little Wind River Community Habitat Restoration Project. UCD will utilize BPA dollars to match other grant funds for this project, to be constructed in the summer of 2012.  This contract will include finalizing the environmental compliance and permitting for this project, finalizing the subcontract for construction, engineer oversight and inspection of the construction work, installation of large wood structures, excavation of pools, construction of riffles, glides and side channels, as well as pre- and post-construction monitoring.  This work will utilize our entire budget for FY12.  

Other work such as producing periodic (quarterly) status reports, the annual progress report, weeding, planting, stream temperature and vegetation monitoring, as well as managing and administering the project will be funded at the earliest date possible with FY13 funding (likely October 2012).
Account Type(s):
Expense
Contract Start Date:
07/01/2012
Contract End Date:
06/30/2013
Current Contract Value:
$121,724
Expenditures:
$121,724

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Ann Gross Underwood Conservation District (UCD) No Administrative Contact ann@ucdwa.org (509) 493-1936
Mary Haight Bonneville Power Administration Yes COR mthaight@bpa.gov (503) 230-3112
Carly Lemon Underwood Conservation District (UCD) No Technical Contact carly@ucdwa.org (509) 493-1936
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Dan Richardson Underwood Conservation District (UCD) No Technical Contact dan@ucdwa.org (509) 493-1936
Tova Tillinghast Underwood Conservation District (UCD) Yes Supervisor tova@ucdwa.org (509) 493-1936


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Funding Package - Submit Final to COTR A: 119. Manage and Administer Projects 05/01/2013 06/03/2013
Environmental Compliance Support C: 165. Produce Environmental Compliance Documentation 06/29/2013 11/28/2012
Implement Little Wind River Construction Plans According to Project Drawings & Specifications D: 29. Increase Habitat Complexity Construction Activities - Little Wind River 10/01/2012 09/28/2012
Construction Management Complete E: 100. Engineer Oversight - Little Wind River 12/31/2012 12/21/2012
Implement monitoring plan F: 157. Project Implementation Monitoring - Little Wind River 06/30/2013 06/24/2013
Share project information H: 191. Share Project Progress and Activities with Project Partners 06/30/2013 06/24/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Projects 07/01/2012
B 185 Periodic Status Reports for BPA 07/01/2012
C 165 Produce Environmental Compliance Documentation 07/01/2012
D 29 Increase Habitat Complexity Construction Activities - Little Wind River 09/05/2012
E 100 Engineer Oversight - Little Wind River 07/01/2012
F 157 Project Implementation Monitoring - Little Wind River 09/05/2012
G 132 Submit Annual Report for the period of July 2011 to June 2012 07/01/2012
H 191 Share Project Progress and Activities with Project Partners 07/01/2012
I 114 Identify and Develop Future Projects 07/01/2012
J 47 Plant Native Vegetation
K 53 Remove Noxious Weeds
L 157 Stream Temperature Monitoring 07/01/2012
M 157 Vegetation Monitoring