Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 58768: 2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
Project Number:
Title:
Water Entity - CBWTP
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
58768
Contract Title:
2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
Contract Continuation:
Previous: Next:
54539: 2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
  • 62416: 2002-013-01 EXP WATER ENTITY (RPA 151) NWPPC
Contract Status:
Closed
Contract Description:
The primary focus of the CBWTP is to fund water transactions that restore streamflow on ecologically-significant Columbia Basin tributaries.  The CBWTP is administered through a cooperative agreement between BPA and the National Fish and Wildlife Foundation (NFWF).  
Subbasin plans and other habitat assessments throughout the Columbia Basin cite inadequate streamflows as a key factor limiting the productivity of both anadromous and resident fish species.  Water transactions provide an effective and appropriate response to this key limiting factor.  Restored streamflow benefit multiple fish species, particularly Chinook and Steelhead.  
The CBWTP works through ten qualified local entities (QLEs).  The QLEs now include four state water agencies and six nonprofit organizations.  These QLEs receive funds to implement and monitor water transactions in multiple priority watersheds throughout the Columbia Basin.  
Since 2002, the QLEs have completed over 300 water right transactions that have restored over 724,000 acre-feet of flow to key tributary streams in the Columbia Basin.  These transactions have included a number of innovative methods, including split-season leases, source switches, permanent purchases and water produced through significant capital investments in irrigation efficiency projects.  The term of these deals has varied from short-term to permanent.  The CBWTP anticipates that transactions funded during the period FY 2013-2015 will be increasingly long-term and permanent deals providing instream benefits beyond the year of funding.
Account Type(s):
Expense
Contract Start Date:
10/01/2012
Contract End Date:
09/30/2013
Current Contract Value:
$4,261,171
Expenditures:
$4,261,171

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Transaction Complete B: 164. 267d-11(WWT-Teanaway #18 - Lease) 09/30/2013 09/30/2013
Transaction Complete C: 164. 127d-09 IDWR (Morgan Creek 2009) 09/30/2013 09/30/2013
Transaction Complete D: 164. 183-08 WWT (Teanaway River No.7 & 6) 09/29/2013 09/30/2013
Transaction Complete E: 164. 240-09 DRC (Trout and Mud Springs Creeks IS Lease 2009) 09/30/2013 09/30/2013
Transaction Complete H: 164. 92f-12 TFT (Lostine 3-year minimum Flow 2012) 09/30/2013 09/30/2013
Transaction Complete I: 164. 279d-12 WATU (CCC Permanent Diversion Reduction Agreement) 09/30/2013 09/30/2013
Outreach completed K: 99. NFWF - Public Presentations 09/30/2013 09/30/2013
Coordination Completed L: 189. NFWF - Coordination with State Water Resources' Agencies and other Partners 09/30/2013 09/30/2013
Solicitations occurred M: 119. NFWF - Transaction Solicitation 09/30/2013 09/30/2013
Maintenance complete N: 160. NFWF - Website and Database Maintenance 09/30/2013 09/30/2013
Work with contractors complete O: 119. NFWF - Subcontract Development and Management 09/30/2013 09/30/2013
Coordination Completed P: 189. NFWF - Qualified Local Entity Coordination and Support 09/30/2013 09/30/2013
Annual and monthly records kept Q: 119. NFWF - Task Invoicing and Record Keeping 09/30/2013 09/30/2013
Transactions Reviewed R: 122. NFWF - Transaction Review 09/30/2013 09/30/2013
Completed annual report S: 132. NFWF - Annual Report for FY 12 (Oct 1, 2011 - Sept 30, 2012) 09/30/2013 09/30/2013
Transaction procedure modified and maintained T: 119. NFWF - Transaction Proposals 09/30/2013 09/30/2013
Monitoring Plan Developed U: 174. NFWF - Develop monitoring and compliance procedures 09/30/2013 09/30/2013
Transactions recommended V: 119. NFWF - Transaction Recommendation 09/30/2013 09/30/2013
Sites visited W: 119. NFWF - Site Visits 09/30/2013 09/30/2013
Environmental Compliance X: 165. NFWF- Environmental Compliance for CBWTP 09/30/2013 09/30/2013
Recommendations implemented Y: 174. NFWF - Strategic Planning 09/30/2013 09/30/2013
Data collected, captured, created and/or validated Z: 157. NFWF - Collect / Generate / Validate field Data for Water Transactions 09/30/2013 09/30/2013
Fulfill all administrative tasks with quality products and in a timely manner. AA: 119. NFWF - Transaction Updates 09/30/2013 09/30/2013
Coordination Completed AB: 189. NFWF- Qualified Local Entity Meetings and Information exchange 09/30/2013 09/30/2013
Procedures modified AC: 119. NFWF - Procedure Modification 09/30/2013 09/30/2013
Coordination Completed AD: 189. WWT - Regional Coordination 09/30/2013 09/30/2013
Reports Completed AE: 141. Other Reports for BPA 01/15/2013 11/30/2012
Outreach completed AF: 99. WWT - Provide outreach and education - event/conference speaking 09/30/2013 09/30/2013
CBWTP processes administered AG: 119. WWT - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Coordination Completed AH: 191. WWT - Local watershed coordination 09/30/2013 09/30/2013
Recommendations implemented AI: 174. WWT - Strategic Planning 09/30/2013 09/30/2013
Water transactions identified and selected AJ: 114. WWT - Identify and Select Water Transactions for FY 13 Development 09/30/2013 09/30/2013
Data collected, captured, created and generated AK: 157. WWT - Collect / Generate / Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Water Transactions Developed AL: 154. WWT - Develop and Negotiate Water Right Transactions 09/30/2013
Coordinate with QLE's and other developing water transaction AM: 189. TU-WWP - Regional Coordination 09/30/2013 09/30/2013
Provide annual report and monitoring records to NFWF AN: 141. Other Reports for BPA 09/30/2013 09/30/2013
External communication AO: 99. TU-WWP - Provide outreach and education - event/conference speaking 09/30/2013 09/30/2013
Project management complete AP: 119. TU-WWP - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Ensuring coordination with local partners AQ: 191. TU-WWP - Local watershed coordination 09/30/2013 09/30/2013
Comply with all evaluation recommendations AR: 174. TU-WWP - Strategic Planning 09/30/2013 09/30/2013
Water transactions identified and selected AS: 114. TU-WWP - Identify and Select Water Transactions for FY13 Development 09/30/2013 09/30/2013
Water transaction checklist and associate documentation for proposed transactions AT: 154. TU-WWP - Develop water transaction for implementation 09/30/2013 09/30/2013
TU-WWP monitoring plan AU: 157. TU-WWP - Collect/Generate/Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Coordination Completed AV: 189. WDOE - Regional Coordination 09/30/2013 09/30/2013
Recommendations implemented AW: 174. WDOE - Strategic Planning 09/30/2013 09/30/2013
Projects administered AX: 119. WDOE - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Water transactions identified and selected AY: 114. WDOE - Identify and Select Water Transactions for FY 13 Development 09/30/2013 09/30/2013
Data collected, captured, created and generated AZ: 157. WDOE - Collect/Generate/Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Reports Completed BA: 141. Other Reports for BPA 09/30/2013 09/30/2013
Reports Completed BB: 141. Other Reports for BPA 09/30/2013 09/30/2013
Outreach completed BC: 99. TU-MWP - Provide outreach and education - event/conference speaking 09/30/2013 09/30/2013
Coordination Completed BD: 191. TU-MWP - Local watershed coordination 09/30/2013 09/30/2013
Coordination Completed BE: 189. TU-MWP - Regional Coordination 09/30/2013 09/30/2013
Transactions Developed BF: 154. TU-MWP - Develop water transaction for implementation 09/30/2013 09/30/2013
Data collected, captured, created and generated BG: 157. TU-MWP - Collect/Generate/Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Water transactions identified and selected BH: 114. TU-MWP - Identify and Select Water Transactions for FY 13 Development 09/30/2013 09/30/2013
Projects administered BI: 119. TU-MWP - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Coordinate with entities in the TFT region BJ: 191. TFT - Local watershed coordination 09/30/2013 09/30/2013
Coordinate with entities in the CBWTP region BK: 189. TFT - Regional Coordination 09/30/2013 09/30/2013
Plan produced BL: 174. TFT - Strategic planning 09/30/2013 09/30/2013
Water Transactions Proposed and/or Completed BM: 154. TFT - Develop and Negotiate Water Right Transactions 09/30/2013 09/30/2013
Gauge installed BN: 148. TFT - Install flow measuring device 09/30/2013 09/30/2013
Reports Completed BO: 141. Other Reports for BPA 09/30/2013 09/30/2013
Presentations and outreach completed BP: 99. TFT - Provide outreach and education - event/conference speaking 09/30/2013 09/30/2013
Data collected, captured, created and generated BQ: 157. TFT - Collect / Generate / Validate field Data for Water Transactions 09/30/2013 09/30/2013
FY 13 transactions initiated and/or complete BR: 114. TFT - Identify and Select Water Transactions for FY13 Development 09/30/2013 09/30/2013
Fulfill all administrative tasks with quality products and in a timely manner. BS: 119. TFT - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Reports Completed BT: 141. Other Reports for BPA 09/30/2013 09/30/2013
Coordination Completed BU: 189. OWRD - Regional Coordination 09/30/2013 09/30/2013
Recommendations implemented BV: 174. OWRD - Strategic Planning 09/30/2013 09/30/2013
Data collected, captured, created and generated BW: 157. OWRD - Collect/Generate/Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Projects administered BX: 119. OWRD - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Coordinate with entities in the CFC region BY: 191. CFC - Local watershed coordination 09/30/2013 09/30/2013
Coordinate with entities in the CBWTP region BZ: 189. CFC - Regional Coordination 09/30/2013 09/30/2013
Targets and plans developed CA: 174. CFC - Strategic Planning 09/30/2013 09/30/2013
Data collected, captured, created and generated CB: 157. CFC - Collect / Generate / Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Water Transactions Proposed and/or Completed CC: 154. CFC - Develop water transactions for implementation 09/30/2013 09/30/2013
Gauges installed CD: 148. CFC - Install flow measuring device at certain Project Streams 09/30/2013 09/30/2013
Reports Completed CE: 141. Other Reports for BPA 12/15/2012 11/30/2012
Fulfill all administrative tasks with quality products and in a timely manner. CF: 119. CFC - Manage and Administer Project as part of CBWTP 09/30/2013 09/30/2013
Identify and Select Water Transactions for Development CG: 114. CFC - Identify and Select Water Transactions for FY13 Development 09/30/2013 09/30/2013
Presentations and outreach completed CH: 99. CFC - Provide outreach and education - event/conference speaking 09/30/2013 09/30/2013
Coordinate with entities in the IDWR region CI: 191. IDWR - Local watershed coordination 09/30/2013 09/30/2013
Participated in Meetings CJ: 189. IDWR - Regional Coordination 09/30/2013 09/30/2013
Collecting, Generating, Validating data during FY '13 complete CK: 157. IDWR - Collect / Generate / Validate Field Data for Water Transactions 09/30/2013 09/30/2013
FY '13 work for water transactions completed CL: 154. IDWR - Develop and Negotiate water transactions 09/30/2013 09/30/2013
Reports Completed CM: 141. Other Reports for BPA 09/30/2013 09/30/2013
Projects administered CN: 119. IDWR - Manage and Administer Projects and par of CBWTP 09/30/2013 09/30/2013
FY '13 transactions initiated and/or complete CO: 114. IDWR - Identify and Select Water Transactions for FY13 Development 09/30/2013 09/30/2013
Coordination Completed CP: 191. DRC - Local watershed coordination 09/30/2013 09/30/2013
Coordination Completed CQ: 189. DRC - Regional Coordination 09/30/2013 09/30/2013
Recommendations implemented CR: 174. DRC - Strategic Planning 09/30/2013 09/30/2013
Data collected, captured, created and generated CS: 157. DRC - Collect / Generate / Validate Field Data for Water Transactions 09/30/2013 09/30/2013
Water Transactions researched CT: 154. DRC - Develop and Negotiate Water Right Transactions 09/30/2013 09/30/2013
Reports Completed CU: 141. Other Reports for BPA 09/30/2013 09/23/2013
Projects administered CV: 119. DRC - Manage and Administer Projects as part of CBWTP 09/30/2013 09/30/2013
Water transactions identified and selected CW: 114. DRC - Identify and Select Water Transactions for FY13 Development 09/30/2013 09/30/2013
Presentations and outreach completed CX: 99. DRC - Provide outreach and education - event/conference speaking 09/30/2013 09/30/2013
transaction complete CZ: 164. 227-09 TU-MWP (Nevada Spring Creek Partners) 09/30/2013 09/30/2013
transaction complete DA: 164. 234-09 (WWT - First Creek No. 1) 09/30/2013 09/30/2013
transaction complete DB: 164. 255-09 TU-WWP (Pioneer Water Users) 09/30/2013 09/30/2013
transaction complete DC: 164. 214-09 TU-WWP (Beaver Creek - Wenatchee Basin) 09/30/2013 09/30/2013
transaction complete DD: 164. 271-09 (WWT - First Creek No. 2 ) 09/30/2013 09/30/2013
transaction complete DE: 164. 270-09 (WWT - First Creek No. 3) 09/30/2013 09/30/2013
transaction complete DG: 164. 301-10 CFC (Placid Creek Split Season Forbearance and Lease) 09/30/2013 09/30/2013
transaction complete DH: 164. 291-10 WWT (Okanogan River No. 1) 09/30/2013
transaction complete DK: 164. 351-12 TFT (Chouinard Instream Exchange) 09/30/2013 09/30/2013
transaction complete DL: 164. 35c-12 (WWT - Teanaway No. 4 - 2012) 09/30/2013 09/30/2013
transaction complete DM: 164. 275b-12(WWT - Gold Creek No. 3 - 2012) 09/30/2013
transaction complete DN: 164. 272b-12(WWT - Gold Creek No. 4 - 2012) 09/30/2013
transaction complete DO: 164. 364-12 TFT (Tualatin ECREP: Hensel ) 09/30/2013
transaction complete DP: 164. 365-12 TFT (Tualatin ECREP: Gardner) 09/30/2013
transaction complete DQ: 164. 146c-13 CFC (Von der Ruhr Renewal) 09/30/2013 09/30/2013
transaction complete DR: 164. 71j-13 DRC (Annual Water Leasing Program 2013) 09/30/2013 09/30/2013
transaction complete DS: 164. 359b-13 TFT (HD_Fifteenmile_CH_2013) 09/30/2013 09/30/2013
transaction complete DT: 164. 181b-13 TFT (HD_Fifteenmile_DP_2013) 09/30/2013 09/30/2013
transaction complete DU: 164. 75d-13 TFT (DE_Buck Hollow_JU_2013) 09/30/2013 09/30/2013
transaction complete DV: 164. 391-13 WWT (Teanaway No 22 - 2013) 09/30/2013 09/30/2013
transaction complete DW: 164. 393-13 TFT (HD_Fifteenmile_RC_2013) 09/30/2013 09/30/2013
transaction complete DX: 164. 380-13 TFT (HD_Fifteenmile_SA_2013) 09/30/2013 09/30/2013
transaction complete DY: 164. 78c-13 TFT (HD_Fifteenmile_EU_2013) 09/30/2013 09/30/2013
transaction complete DZ: 164. 390-13 CFC (Perkins Clark Fork River Diversion Reduction) 09/30/2013 09/30/2013
transaction complete EA: 164. 345-12 WATU (API_Entiat) 09/30/2013 09/30/2013
transaction complete EB: 164. 263d-12 TFT (Jacobs/Roberts Creek Coop) 09/30/2013 09/30/2013
transaction complete EC: 164. 361-12 WATU (Roseburg/unnammed) 09/30/2013 09/30/2013
transaction complete ED: 164. 102d-13(Pole Creek 2013) 09/30/2013 09/30/2013
transaction complete EE: 164. 376-13(Spring Creek - R&E Beard Transaction) 09/30/2013 09/30/2013
transaction complete EF: 164. 375-13(Spring Creek - Lavere Beard Transaction) 09/30/2013 09/30/2013
transaction complete EG: 164. 374-13(Spring Creek - Smaellie Donation) 09/30/2013 09/30/2013
transaction complete EH: 164. 373-13(Spring Creek - City of Tetonia Donation) 09/30/2013 09/30/2013
transaction complete EI: 164. 371-13(North Unit ID Main Canal Lining Project) 09/30/2013 09/30/2013
transaction complete EJ: 164. 24c-12(WWT - Libby Creek No 1 - 2012) 09/30/2013
transaction complete EK: 164. 97b-06(Cowiche Creek Water Users Association) 09/30/2013 09/30/2013
transaction complete EL: 164. 383-13(German Gulch, Spangler Ranch) 09/30/2013 09/30/2013
transaction complete EM: 164. 386-13(Sauerkraut Creek/Sunnyslope Diversion reduction) 09/30/2013 09/30/2013
transaction complete EN: 164. 387-13(Braziel Creek-Stitt) 09/30/2013 09/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Deschutes River Summer/Fall ESU
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 3 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 5 instances of WE 174 Produce Plan
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 16 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 3 instances of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 3 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 5 instances of WE 174 Produce Plan
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 11 instances of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 164 Acquire Water Instream
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 2 instances of WE 164 Acquire Water Instream
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 4 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 4 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 7 instances of WE 174 Produce Plan
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 19 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 3 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 3 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 5 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 10 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 2 instances of WE 174 Produce Plan
  • 2 instances of WE 164 Acquire Water Instream
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 164 Acquire Water Instream
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 8 instances of WE 164 Acquire Water Instream
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 4 instances of WE 164 Acquire Water Instream
Trout, Brown (Salmo trutta) [OBSOLETE]
  • 1 instance of WE 164 Acquire Water Instream
Trout, Brook (Salvelinus fontinalis)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 164 Acquire Water Instream
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 164 Acquire Water Instream
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2012
B 164 267d-11(WWT-Teanaway #18 - Lease) 10/01/2012
C 164 127d-09 IDWR (Morgan Creek 2009) 10/01/2012
D 164 183-08 WWT (Teanaway River No.7 & 6) 10/01/2012
E 164 240-09 DRC (Trout and Mud Springs Creeks IS Lease 2009) 10/01/2012
F 164 328-11 CFC (Racetrack Direct Flow Right Acquisition) 10/01/2012
G 164 338-12 DRC (Whychus Creek Water Acquisition #2) 10/01/2012
H 164 92f-12 TFT (Lostine 3-year minimum Flow 2012) 10/01/2012
I 164 279d-12 WATU (CCC Permanent Diversion Reduction Agreement) 10/01/2012
J 164 NFWF- Water Transactions TBD 10/01/2012
K 99 NFWF - Public Presentations 10/01/2012
L 189 NFWF - Coordination with State Water Resources' Agencies and other Partners 10/01/2012
M 119 NFWF - Transaction Solicitation 10/01/2012
N 160 NFWF - Website and Database Maintenance 10/01/2012
O 119 NFWF - Subcontract Development and Management 10/01/2012
P 189 NFWF - Qualified Local Entity Coordination and Support 10/01/2012
Q 119 NFWF - Task Invoicing and Record Keeping 10/01/2012
R 122 NFWF - Transaction Review 10/01/2012
S 132 NFWF - Annual Report for FY 12 (Oct 1, 2011 - Sept 30, 2012) 10/01/2012
T 119 NFWF - Transaction Proposals 10/01/2012
U 174 NFWF - Develop monitoring and compliance procedures 10/01/2012
V 119 NFWF - Transaction Recommendation 10/01/2012
W 119 NFWF - Site Visits 10/01/2012
X 165 NFWF- Environmental Compliance for CBWTP 10/01/2012
Y 174 NFWF - Strategic Planning 10/01/2012
Z 157 NFWF - Collect / Generate / Validate field Data for Water Transactions 10/01/2012
AA 119 NFWF - Transaction Updates 10/01/2012
AB 189 NFWF- Qualified Local Entity Meetings and Information exchange 10/01/2012
AC 119 NFWF - Procedure Modification 10/01/2012
AD 189 WWT - Regional Coordination 10/01/2012
AE 141 Other Reports for BPA 10/01/2012
AF 99 WWT - Provide outreach and education - event/conference speaking 10/01/2012
AG 119 WWT - Manage and Administer Projects as part of CBWTP 10/01/2012
AH 191 WWT - Local watershed coordination 10/01/2012
AI 174 WWT - Strategic Planning 10/01/2012
AJ 114 WWT - Identify and Select Water Transactions for FY 13 Development 10/01/2012
AK 157 WWT - Collect / Generate / Validate Field Data for Water Transactions 10/01/2012
AL 154 WWT - Develop and Negotiate Water Right Transactions 10/01/2012
AM 189 TU-WWP - Regional Coordination 10/01/2012
AN 141 Other Reports for BPA 10/01/2012
AO 99 TU-WWP - Provide outreach and education - event/conference speaking 10/01/2012
AP 119 TU-WWP - Manage and Administer Projects as part of CBWTP 10/01/2012
AQ 191 TU-WWP - Local watershed coordination 10/01/2012
AR 174 TU-WWP - Strategic Planning 10/01/2012
AS 114 TU-WWP - Identify and Select Water Transactions for FY13 Development 10/01/2012
AT 154 TU-WWP - Develop water transaction for implementation 10/01/2012
AU 157 TU-WWP - Collect/Generate/Validate Field Data for Water Transactions 10/01/2012
AV 189 WDOE - Regional Coordination 10/01/2012
AW 174 WDOE - Strategic Planning 10/01/2012
AX 119 WDOE - Manage and Administer Projects as part of CBWTP 10/01/2012
AY 114 WDOE - Identify and Select Water Transactions for FY 13 Development 10/01/2012
AZ 157 WDOE - Collect/Generate/Validate Field Data for Water Transactions 10/01/2012
BA 141 Other Reports for BPA 10/01/2012
BB 141 Other Reports for BPA 10/01/2012
BC 99 TU-MWP - Provide outreach and education - event/conference speaking 10/01/2012
BD 191 TU-MWP - Local watershed coordination 10/01/2012
BE 189 TU-MWP - Regional Coordination 10/01/2012
BF 154 TU-MWP - Develop water transaction for implementation 10/01/2012
BG 157 TU-MWP - Collect/Generate/Validate Field Data for Water Transactions 10/01/2012
BH 114 TU-MWP - Identify and Select Water Transactions for FY 13 Development 10/01/2012
BI 119 TU-MWP - Manage and Administer Projects as part of CBWTP 10/01/2012
BJ 191 TFT - Local watershed coordination 10/01/2012
BK 189 TFT - Regional Coordination 10/01/2012
BL 174 TFT - Strategic planning 10/01/2012
BM 154 TFT - Develop and Negotiate Water Right Transactions 10/01/2012
BN 148 TFT - Install flow measuring device 05/07/2013
BO 141 Other Reports for BPA 10/01/2012
BP 99 TFT - Provide outreach and education - event/conference speaking 10/01/2012
BQ 157 TFT - Collect / Generate / Validate field Data for Water Transactions 10/01/2012
BR 114 TFT - Identify and Select Water Transactions for FY13 Development 10/01/2012
BS 119 TFT - Manage and Administer Projects as part of CBWTP 10/01/2012
BT 141 Other Reports for BPA 10/01/2012
BU 189 OWRD - Regional Coordination 10/01/2012
BV 174 OWRD - Strategic Planning 10/01/2012
BW 157 OWRD - Collect/Generate/Validate Field Data for Water Transactions 10/01/2012
BX 119 OWRD - Manage and Administer Projects as part of CBWTP 10/01/2012
BY 191 CFC - Local watershed coordination 10/01/2012
BZ 189 CFC - Regional Coordination 10/01/2012
CA 174 CFC - Strategic Planning 10/01/2012
CB 157 CFC - Collect / Generate / Validate Field Data for Water Transactions 10/01/2012
CC 154 CFC - Develop water transactions for implementation 10/01/2012
CD 148 CFC - Install flow measuring device at certain Project Streams 10/01/2012
CE 141 Other Reports for BPA 10/01/2012
CF 119 CFC - Manage and Administer Project as part of CBWTP 10/01/2012
CG 114 CFC - Identify and Select Water Transactions for FY13 Development 10/01/2012
CH 99 CFC - Provide outreach and education - event/conference speaking 10/01/2012
CI 191 IDWR - Local watershed coordination 10/01/2012
CJ 189 IDWR - Regional Coordination 10/01/2012
CK 157 IDWR - Collect / Generate / Validate Field Data for Water Transactions 10/01/2012
CL 154 IDWR - Develop and Negotiate water transactions 10/01/2012
CM 141 Other Reports for BPA 10/01/2012
CN 119 IDWR - Manage and Administer Projects and par of CBWTP 10/01/2012
CO 114 IDWR - Identify and Select Water Transactions for FY13 Development 10/01/2012
CP 191 DRC - Local watershed coordination 10/01/2012
CQ 189 DRC - Regional Coordination 10/01/2012
CR 174 DRC - Strategic Planning 10/01/2012
CS 157 DRC - Collect / Generate / Validate Field Data for Water Transactions 10/01/2012
CT 154 DRC - Develop and Negotiate Water Right Transactions 10/01/2012
CU 141 Other Reports for BPA 10/01/2012
CV 119 DRC - Manage and Administer Projects as part of CBWTP 10/01/2012
CW 114 DRC - Identify and Select Water Transactions for FY13 Development 10/01/2012
CX 99 DRC - Provide outreach and education - event/conference speaking 10/01/2012
CY 164 184-08 TU-WWP (Entiat HD-KW Consolidation) 10/01/2012
CZ 164 227-09 TU-MWP (Nevada Spring Creek Partners) 10/01/2012
DA 164 234-09 (WWT - First Creek No. 1) 10/01/2012
DB 164 255-09 TU-WWP (Pioneer Water Users) 10/01/2012
DC 164 214-09 TU-WWP (Beaver Creek - Wenatchee Basin) 10/01/2012
DD 164 271-09 (WWT - First Creek No. 2 ) 10/01/2012
DE 164 270-09 (WWT - First Creek No. 3) 10/01/2012
DF 164 269-09 (WWT - Nile Creek No. 1 - 2009) 10/01/2012
DG 164 301-10 CFC (Placid Creek Split Season Forbearance and Lease) 10/01/2012
DH 164 291-10 WWT (Okanogan River No. 1) 10/01/2012
DI 164 299-10 TFT (Muir & McDonald Tannery) 10/01/2012
DJ 164 314-11 DRC (TSID Hurtley Lateral Piping) 10/01/2012
DK 164 351-12 TFT (Chouinard Instream Exchange) 10/01/2012
DL 164 35c-12 (WWT - Teanaway No. 4 - 2012) 10/01/2012
DM 164 275b-12(WWT - Gold Creek No. 3 - 2012) 10/01/2012
DN 164 272b-12(WWT - Gold Creek No. 4 - 2012) 10/01/2012
DO 164 364-12 TFT (Tualatin ECREP: Hensel ) 10/01/2012
DP 164 365-12 TFT (Tualatin ECREP: Gardner) 10/01/2012
DQ 164 146c-13 CFC (Von der Ruhr Renewal) 10/01/2012
DR 164 71j-13 DRC (Annual Water Leasing Program 2013) 10/01/2012
DS 164 359b-13 TFT (HD_Fifteenmile_CH_2013) 10/01/2012
DT 164 181b-13 TFT (HD_Fifteenmile_DP_2013) 10/01/2012
DU 164 75d-13 TFT (DE_Buck Hollow_JU_2013) 10/01/2012
DV 164 391-13 WWT (Teanaway No 22 - 2013) 09/30/2013
DW 164 393-13 TFT (HD_Fifteenmile_RC_2013) 09/30/2013
DX 164 380-13 TFT (HD_Fifteenmile_SA_2013) 09/30/2013
DY 164 78c-13 TFT (HD_Fifteenmile_EU_2013) 09/30/2013
DZ 164 390-13 CFC (Perkins Clark Fork River Diversion Reduction) 09/30/2013
EA 164 345-12 WATU (API_Entiat) 09/30/2013
EB 164 263d-12 TFT (Jacobs/Roberts Creek Coop) 09/30/2013
EC 164 361-12 WATU (Roseburg/unnammed) 09/30/2013
ED 164 102d-13(Pole Creek 2013) 09/30/2013
EE 164 376-13(Spring Creek - R&E Beard Transaction) 09/30/2013
EF 164 375-13(Spring Creek - Lavere Beard Transaction) 09/30/2013
EG 164 374-13(Spring Creek - Smaellie Donation) 09/30/2013
EH 164 373-13(Spring Creek - City of Tetonia Donation) 09/30/2013
EI 164 371-13(North Unit ID Main Canal Lining Project) 09/30/2013
EJ 164 24c-12(WWT - Libby Creek No 1 - 2012) 09/30/2013
EK 164 97b-06(Cowiche Creek Water Users Association) 09/30/2013
EL 164 383-13(German Gulch, Spangler Ranch) 10/01/2012
EM 164 386-13(Sauerkraut Creek/Sunnyslope Diversion reduction) 09/30/2013
EN 164 387-13(Braziel Creek-Stitt) 09/30/2013