Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 60023: 2007-064-00 EXP SLATE CREEK WATERSHED RESTORATATION
Project Number:
Title:
Slate Creek Watershed Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
60023
Contract Title:
2007-064-00 EXP SLATE CREEK WATERSHED RESTORATATION
Contract Continuation:
Previous: Next:
56587: 2007-064-00 EXP NPT SLATE CREEK WATERSHED RESTORATION
  • 63843: 2007-064-00 EXP SLATE CREEK WATERSHED RESTORATATION
Contract Status:
History
Contract Description:
Contract History:

This project began in 2007 and became part of the Nez Perce Tribe Fisheries Watershed Department’s Habitat Restoration program.  In 2007 and 2008, the Nez Perce Tribe (NPT) and Nez Perce National Forest (NPNF) worked collaboratively to complete stream crossing assessments and the associated culvert replacement prioritization in the Slate Creek Watershed.  In 2009, the Nez Perce Tribe and Nez Perce National Forest worked collaboratively to implement a high priority culvert replacement on Little Slate Creek (#3246).   Another high priority crossing was replaced in 2010 (the 9315 crossing) as well as crossing #3135 in 2011.  All culvert replacement projects have had riparian planting after implementation and have undergone monitoring in accordance with our Nez Perce Tribe Culvert Replacement monitoring protocol.

This project will operate under a Partnership Agreement between the Nez Perce Tribe and the Nez Perce National Forest.  The Nez Perce National Forest contributes approximately 20% of project costs in both cash and in kind for contract preparation, administration, and technical oversight.  


Summary of FY 2012 Contract Implementation:

FY 12 contract implementation, which included the implementation of the 3136 culvert replacement located on FS road 221 (the main Grangeville Salmon Roads), associated riparian planting, and design for one to three priority culvert replacements, were all canceled due to the large Sheep Creek Fire and subsequent snow fall.  Project implementation/effectiveness monitoring and evaluation of the 3135 (year 1 post) and 3136 (pre) culvert replacements was completed.  

FY 2013 Contract Implementation:

FY 13 contract implementation will complete the work that was canceled in FY 2012.  This includes the 3136 culvert replacement and designs for up to three more priority culvert replacements.  Baseline and post implementation project monitoring will also be completed for the 3136 culvert replacement.
Account Type(s):
Expense
Contract Start Date:
03/01/2013
Contract End Date:
02/28/2014
Current Contract Value:
$167,451
Expenditures:
$167,451

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration No Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Stephanie Bransford Nez Perce Tribe Yes Contract Manager stephanieb@nezperce.org (208) 983-0675
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance requirements completed A: 165. Submit environmental compliance documentation to BPA for 2013 projects 06/30/2013 06/28/2013
3136 Culvert Replacement Complete B: 184. 3136 Culvert Replacement 10/31/2013 07/26/2013
Culvert Design(s) Complete C: 175. Design Culvert Replacement(s) 02/28/2014 12/31/2013
Culvert Data Collected D: 157. 3136 Culvert on FS Road 221 Data Collection 10/31/2013 09/30/2013
FY 2014 SOW package and FY 2013 accrual estimate E: 119. Management, Coordination, and Communication 10/31/2013 10/31/2013
Final FY 2013 annual report uploaded to Pisces and Taurus F: 132. Produce Annual Report for Period 1/1/2013 - 12/31/2013 02/28/2014 02/24/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit environmental compliance documentation to BPA for 2013 projects 03/01/2013
B 184 3136 Culvert Replacement 02/22/2010
C 175 Design Culvert Replacement(s) 03/01/2013
D 157 3136 Culvert on FS Road 221 Data Collection 02/22/2010
E 119 Management, Coordination, and Communication 03/01/2013
F 132 Produce Annual Report for Period 1/1/2013 - 12/31/2013 03/01/2013
G 185 Periodic Status Reports for BPA 03/01/2013