Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 60770: 1995-060-01 EXP ISQUULKTPE WATERSHED PROJECT (OPERATIONS)
Project Number:
Title:
Isqúulktpe Watershed Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
60770
Contract Title:
1995-060-01 EXP ISQUULKTPE WATERSHED PROJECT (OPERATIONS)
Contract Continuation:
Previous: Next:
51656: 1995-060-01 EXP ISQUULKTPE WATERSHED PROJECT
  • 64530: 1995-060-01 EXP ISQUULKTPE WATERSHED PROJECT (OPERATIONS)
Contract Status:
Closed
Contract Description:
Summary: This contract supports the continuation of management activities on the Isqúulktpe Watershed Project.  Management efforts undertaken under this contract are designed to promote watershed health and ecosystem function, protect, enhance and mitigate target wildlife mitigation species, and nurture self-sustaining habitats for fish and wildlife.  Project activities include: 1) Planning and Design; 2) Construction and Implementation; 3) Operations and Maintenance; and 4) Monitoring and Evaluation.  Many of the major tasks are annual in nature, and contribute to ongoing protection and enhancement of the fish and wildlife habitat values, and the ecosystem health and function, desired within the watershed.    

Status:  The current SOW provides direction for planned actions during the contract period.  Management activities planned for 2013 encompass the following tasks:

- Administer and operate the watershed habitat area
- Renew grazing leases to provide rest from livestock grazing
- Monitor and maintain existing fence to control trespass livestock
- Maintain wildlife water facilities and spring exclosures
- Continue monitoring and treatment strategies to control and eradicate weeds
- Continue treatment of Himalayan blackberry, which out-competes desirable vegetation
- Maintain seasonal road closure to protect habitat for spawning steelhead
- Continue efforts to control medusahead, and re-vegetate with native plants.
- Plant native grasses and shrubs on previously treated blackberry control sites

Background

The Isqúulktpe Creek watershed is a fifth-order subbasin located in the Umatilla River Basin, encompassing approximately 24,200 acres.  Located on the western slopes of the Blue Mountains in Oregon, Isqúulktpe (formerly known as Squaw) Creek, drains into the Umatilla River upstream of Pendleton, Oregon.  Topography of the Isqúulktpe Watershed is typical of the Blue Mountain foothills, with broad flat ridges dissected by steep canyons with a wide variety of aspects.

The CTUIR developed the Isqúulktpe Watershed Project under the Columbia Basin Fish and Wildlife Program in 1995.  (Note: In 2009, the spelling of the project title was changed from Iskuulpa to Isqúulktpe.)  The purpose of the project is to offset habitat losses from, and provide in-kind mitigation for, the impacts of construction and operation of the John Day and McNary hydroelectric projects.  The Project emphasizes two principle strategies for acquiring, protecting, and enhancing habitat to meet these project purposes: fee acquisitions; and the leasing of Bureau of Indian Affairs (BIA) administered grazing allotments, and resting them from livestock use.
Account Type(s):
Expense
Contract Start Date:
02/01/2013
Contract End Date:
01/31/2014
Current Contract Value:
$213,532
Expenditures:
$213,532

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Project operating smoothly; contracting requirements met. A: 119. Project Management and Contract Administration 01/31/2014 01/31/2014
Timely and successful Environmental Compliance documentation and clearance B: 165. Obtain Environmental Compliance Clearance for ecological restoration & habitat enhancement projects 01/31/2014 01/31/2014
Rest 11,219 grassland acres from livestock grazing C: 92. Purchase grazing lease for Bureau of Indian Affairs grazing unit 10/31/2013 10/24/2013
Livestock exclusion D: 26. Prevent trespass by unauthorized livestock 12/31/2013 12/31/2013
20 miles of intact fence E: 186. Monitor and maintain existing range unit boundary fence 10/31/2013 10/31/2013
Regulate public access and provide visitor information F: 188. Provide and regulate public access 01/31/2014 01/31/2014
40 acres of noxious weeds treated; 27 road and riparian miles surveyed G: 197. Control and monitor noxious weeds 01/31/2014 10/24/2013
Blackberry controlled on 160 acres H: 197. Remove blackberry in lower Isqúulktpe Creek 11/30/2013 10/24/2013
Medusahead Control I: 197. Medusahead pilot restoration project 01/31/2014 10/24/2013
Establish native plants J: 47. Revegetate invasive plant treatment sites 01/20/2014 01/13/2014
Submit two-year Progress Report for 2012 and 2013 K: 132. Submit 2012 - 2013 Progress Report 01/31/2014 01/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 3 instances of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 92 Lease Land

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project Management and Contract Administration 02/01/2013
B 165 Obtain Environmental Compliance Clearance for ecological restoration & habitat enhancement projects 02/01/2013
C 92 Purchase grazing lease for Bureau of Indian Affairs grazing unit 02/01/2013
D 26 Prevent trespass by unauthorized livestock 02/01/2013
E 186 Monitor and maintain existing range unit boundary fence 02/01/2013
F 188 Provide and regulate public access 02/01/2013
G 197 Control and monitor noxious weeds 04/26/2013
H 197 Remove blackberry in lower Isqúulktpe Creek 04/26/2013
I 197 Medusahead pilot restoration project 09/11/2013
J 47 Revegetate invasive plant treatment sites 09/11/2013
K 132 Submit 2012 - 2013 Progress Report 02/01/2013
L 185 Periodic Status Reports for BPA 02/01/2013