Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 61026: 1995-027-00 EXP LAKE ROOS. STURGEON RECOV. PROJECT
Project Number:
Title:
Lake Roosevelt Sturgeon Recovery
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
61026
Contract Title:
1995-027-00 EXP LAKE ROOS. STURGEON RECOV. PROJECT
Contract Continuation:
Previous: Next:
57415: 1995-027-00 EXP LAKE ROOS. STURGEON RECOV.PROJECT
  • 65088: 1995-027-00 EXP LAKE ROOS. STURGEON RECOV. PROJECT
Contract Status:
Closed
Contract Description:
Recruitment failure in the white sturgeon population occupying the Transboundary Reach of the upper Columbia River (Grand Coulee Dam, WA, U.S.A to Hugh Keenleyside Dam, British Columbia, Canada) was first documented during studies conducted in the early 1990’s in the Canadian portion of the Reach (referred to as the Keenleyside Reach) (Hildebrand and English 1991; R.L.&L. 1994; Hildebrand et al. 1999).  These studies determined that juvenile age-classes (under ten years of age) were lacking within the population.  Similar results were obtained in the U.S. section of the Reach (referred to as the Roosevelt Reach) in 1998 (Devore et al. 2000; Kappenman et al. 2000).  Recent sturgeon studies in the Keenleyside Reach (Golder Associates Ltd. 2003, 2005a; Arndt 2003) and Roosevelt Reach (Lee and Underwood 2002; Lee and Pavlik 2003; Howell and McLellan 2005, 2006, 2007, in prep.) show a continuation of poor recruitment through a failure to catch large numbers of juvenile sturgeon representing multiple year classes.

The onset of the recruitment decline in the Transboundary Reach white sturgeon population coincided with the construction of Columbia River mainstem dams in Canada commencing with Hugh L. Keenleyside (HLK; 1968), and followed by Mica (1976) and Revelstoke (1984).  Reproductive failure of this population therefore appears directly related to the effects of river regulation (R.L. & L. 1994).  The exact mechanisms limiting recruitment are unknown but are currently the focus of ongoing studies in the Transboundary Reach.

The Upper Columbia White Sturgeon Recovery Initiative (UCWSRI), an international organization with members from state, provincial, and federal fisheries agencies and First Nations tribes in British Columbia and Washington State produced the Upper Columbia White Sturgeon Recovery Plan (UCWSRP) in 2002 (UCWSRI 2002).  The UCWSRP outlined various short, mid and long-term measures required to prevent the extinction of white sturgeon populations in the Columbia River above Grand Coulee Dam (UCWSRI 2002).  Efforts in 2013 will focus on continuing to examine limiting factors for sturgeon in the Transboundary Reach and maintaining the interim conservation sturgeon hatchery releases.

FY2013 Work:
Project sampling anticipated to continue in 2013 includes sub-yearling (juvenile) assessment monitoring, adult stock assessment monitoring, and telemetry monitoring.  Sub-yearling (juvenile) assessments will be conducted to detect natural recruitment, evaluate the conservation aquaculture program, estimate survival, and assess distribution, condition, growth, age, and behavior of wild and hatchery origin juvenile sturgeon in the U.S. portion of the upper Columbia River.  Adult white sturgeon stock assessment monitoring will be conducted cooperatively with UCWSRI and Lake Roosevelt research and project partners to determine abundance of white sturgeon in the Transboundary Reach.  Telemetry monitoring will provide information on U.S. spawning areas and identify important seasonal habitats and patterns of sturgeon movement in the Roosevelt and Transboundary reaches as part of a cooperative UCWSRI Transboundary Telemetry and Data Management Project.  Additional tasks include benthic invertebrate sample processing, and completion of the study assessing the efficacy of using calcein as a long-term marking tool for sturgeon monitoring.  Benthic invertebrate sample assessments will provide insight into food resources available in larval sampling areas, and examining long-term (one year) mark efficacy will provide clearer understanding of which marking techniques are most effective and demonstrate mark appearance long-term.  Interim hatchery operations will continue in 2013 using wild caught sturgeon larvae, following protocols devised in 2011, to protect the genetic diversity of the upper Columbia River sturgeon population.  The larvae will be reared at Sherman Creek Hatchery and released at Kettle Falls, WA in December 2013.  Genetics samples from hatchery and wild fish through all sampling events will be collected for future analyses.  

Additional tasks for 2013 include supporting the White Sturgeon Enhancement Project (BPA 2008-116-00) in the development of an upper Columbia River white sturgeon database (the Colville Confederated Tribe is the lead agency; the Spokane Tribe will provide support and data as requested),  Past due deliverables will be completed (Annual Reports 2008-2011) in conjunction with project partners and the researchers responsible for completion of that work in previous study years.  The 2012 progress report will be completed.  An article for publication in a peer-reviewed journal is in progress with project partners (not currently working for this project, but working with white sturgeon in the upper Columbia River).  Public outreach activities will continue in 2013, including outreach at public forums such as the Lake Roosevelt Forum Conference, Kettle Falls Water Festival, and other opportunities that may arise throughout the year.  The intent is to educate the public about the decline of white sturgeon in Lake Roosevelt and the Upper Columbia River.  Project coordination will be conducted at several levels including coordination amongst project participants, the Lake Roosevelt/upper Columbia River White Sturgeon Technical Group, and the Upper Columbia River White Sturgeon Recovery Initiative Technical Work Group that will facilitate integrated white sturgeon research activities in Lake Roosevelt and the broader Columbia River basin white sturgeon research community.

To address concerns regarding the status of late deliverables, we will have at least draft versions of 2008 and 2009 annual reports attached in Pisces by the deadline noted in the work element milestones (4/5/2013), prior to participation in peer review activities and conference participation.
Account Type(s):
Expense
Contract Start Date:
04/01/2013
Contract End Date:
03/31/2014
Current Contract Value:
$476,532
Expenditures:
$476,532

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mitch Combs Washington Department of Fish and Wildlife (WDFW) No Interested Party mitch.combs@dfw.wa.gov (509) 738-6971
Jeanne Flett Spokane Tribe No Administrative Contact jeannef@spokanetribe.com (509) 458-6560
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
B.J. Kieffer Spokane Tribe No Supervisor bjk@spokanetribe.com (509) 626-4427
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Carlos Matthew Bonneville Power Administration Yes COR cjmatthew@bpa.gov (503) 230-3418
Brent Nichols Spokane Tribe Yes Contract Manager bnichols@spokanetribe.com (509) 244-7031x200
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nancy Weintraub Bonneville Power Administration Yes Interested Party nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Complete Environmental Compliance A: 165. Complete BPA Environmental Compliance 03/31/2014 03/31/2014
Mark white sturgeon with calcein. B: 158. Calcein Mark larval/juvenile white sturgeon 10/31/2013 10/18/2013
Hatchery fish individually marked with a PIT tag/scute mark prior to release. C: 158. PIT tag and scute mark hatchery white sturgeon 12/31/2013 12/31/2013
Produce and release BY2013 hatchery white sturgeon D: 176. Rear & release BY2013 hatchery fish into Lake Roosevelt/upper Columbia River 03/31/2014 02/06/2014
Funding Package - Sign contract E: 119. Manage and administer Lake Roosevelt White Sturgeon Recovery Project 03/31/2014
Stock status field and lab work complete F: 157. Conduct white sturgeon sub-yearling monitoring, data entry, and data quality control 11/15/2013 11/29/2013
Conduct Adult Stock Status Monitoring G: 157. Conduct white sturgeon adult monitoring, data entry, and data quality control 12/01/2013 12/01/2013
Acoustic Telemetry Monitoring Complete H: 157. Conduct white sturgeon telemetry monitoring, data entry, and data quality control 03/31/2014 03/31/2014
Assist in development/maintenance of Lake Roosevelt/upper Columbia River Sturgeon Recovery Database I: 160. Develop and Maintain a database for the Lake Roosevelt Sturgeon Recovery Project 03/31/2014 03/31/2014
Develop, organize and participate in public outreach activities J: 99. Lake Roosevelt White Sturgeon Recovery Project Public Outreach 03/31/2014 03/31/2014
Fish Assessment Data Analyses K: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project adult and sub-yearling data 12/15/2013 12/15/2013
Benthic Macro-invertebrate Analyses L: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Report Benthic macro-invertebrate data 01/31/2014 01/31/2014
Annual Report Telemetry Analyses M: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry data 03/31/2014 03/31/2014
Distribute data and results amongst project participants and the UCWSRI N: 161. Provide summary data to project participants and the Upper Columbia White Sturgeon Initiative 03/31/2014 03/31/2014
Produce 2008 Lake Roosevelt Sturgeon Recovery Project Annual Progress Report. O: 132. Submit 2008 (Annual) Progress Report for the period (April 2008) to (March 2009) 08/31/2013 08/31/2013
Produce 2009 Lake Roosevelt Sturgeon Recovery Project Annual Progress Report. P: 132. Submit 2009 (Annual) Progress Report for the period (April 2009) to (March 2010) 08/31/2013 08/31/2013
Produce 2010 Lake Roosevelt Sturgeon Recovery Project Annual Progress Report. Q: 132. Submit 2010 (Annual) Progress Report for the period (April 2010) to (March 2011) 01/31/2014 01/31/2014
Produce 2011 Lake Roosevelt Sturgeon Recovery Project Annual Progress Report. R: 132. Submit 2011 (Annual) Progress Report for the period (April 2011) to (March 2012) 03/31/2014
Attach Progress Report in Pisces S: 132. Submit 2012 (Annual) Progress Report for the period (April 2012) to (March 2013) 02/28/2014
Produce Upper Columbia River White Sturgeon Annual Production Plan T: 174. Produce Upper Columbia White Sturgeon Plan 01/31/2014 01/31/2014
Finalize journal article U: 183. Produce journal article on upper Columbia River sturgeon 01/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 183 Produce Journal Article
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete BPA Environmental Compliance 04/01/2013
B 158 Calcein Mark larval/juvenile white sturgeon 04/01/2013
C 158 PIT tag and scute mark hatchery white sturgeon 04/01/2013
D 176 Rear & release BY2013 hatchery fish into Lake Roosevelt/upper Columbia River 04/01/2013
E 119 Manage and administer Lake Roosevelt White Sturgeon Recovery Project 04/01/2013
F 157 Conduct white sturgeon sub-yearling monitoring, data entry, and data quality control 04/01/2013
G 157 Conduct white sturgeon adult monitoring, data entry, and data quality control 04/01/2013
H 157 Conduct white sturgeon telemetry monitoring, data entry, and data quality control 04/01/2013
I 160 Develop and Maintain a database for the Lake Roosevelt Sturgeon Recovery Project 04/01/2013
J 99 Lake Roosevelt White Sturgeon Recovery Project Public Outreach 04/01/2013
K 162 Analysis of Lake Roosevelt White Sturgeon Recovery Project adult and sub-yearling data 04/01/2013
L 162 Analysis of Lake Roosevelt White Sturgeon Recovery Project Report Benthic macro-invertebrate data 04/01/2013
M 162 Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry data 04/01/2013
N 161 Provide summary data to project participants and the Upper Columbia White Sturgeon Initiative 04/01/2013
O 132 Submit 2008 (Annual) Progress Report for the period (April 2008) to (March 2009) 04/01/2013
P 132 Submit 2009 (Annual) Progress Report for the period (April 2009) to (March 2010) 04/01/2013
Q 132 Submit 2010 (Annual) Progress Report for the period (April 2010) to (March 2011) 04/01/2013
R 132 Submit 2011 (Annual) Progress Report for the period (April 2011) to (March 2012) 04/01/2013
S 132 Submit 2012 (Annual) Progress Report for the period (April 2012) to (March 2013) 04/01/2013
T 174 Produce Upper Columbia White Sturgeon Plan 04/01/2013
U 183 Produce journal article on upper Columbia River sturgeon 04/01/2013
V 185 Periodic Status Reports for BPA 04/01/2013