Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62202: 2008-905-00 EXP SBT ACCORD SUPPLEMENTATION
Project Number:
Title:
Supplementation Projects
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
62202
Contract Title:
2008-905-00 EXP SBT ACCORD SUPPLEMENTATION
Contract Continuation:
Previous: Next:
57877: 2008-905-00 EXP ACCORD SUPPLEMENTATION PROJECTS
  • 66365: 2008-905-00 EXP SBT ACCORD SUPPLEMENTATION
Contract Status:
Closed
Contract Description:
This contract is being developed to fund the Supplementation Projects to develop and finalize a "project" Narrative Proposal, develop and finalize a long-term Monitoring, Research, and Evaluation (MR&E) Plan, while also providing funds to manage and administer the project, develop quarter narrative reports, develop annual reports, complete two mixed-stock genetic analysis to identify the origin of Chinook salmon in Yankee Fork and Panther Creek, develop an Annual Operating Plan for the Steelhead Streamside Incubation Project, continue baseline data collection to inform management decisions that are a component of phase one (reintroduction) of our fishery restoration plans in Panther Creek, and test equipment and design a PIT tag array system for Panther Creek.
Account Type(s):
Expense
Contract Start Date:
07/01/2013
Contract End Date:
06/30/2014
Current Contract Value:
$287,395
Expenditures:
$287,395

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Lytle Denny Shoshone-Bannock Tribes Yes Technical Contact ldenny@sbtribes.com (208) 239-4560
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Melissa Evans Shoshone-Bannock Tribes No Technical Contact mevans@sbtribes.com (208) 681-6975
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Gaylene Turnage Shoshone-Bannock Tribes No Administrative Contact gturnage@sbtribes.com (208) 478-3821
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Permits Acquired A: 165. Project Permitting - Panther Creek PIT Tag Array 06/30/2014
Project Meets Scientific Review Criteria B: 122. Develop Narrative Proposal for Supplemenation Projects 06/30/2014
Final Monitoring, Research, and Evaluation Plan C: 174. Monitoring, Research, and Evaluation Plan 06/30/2014
Fish Monitoring Equipment Design Complete D: 70. Fish Monitoring Equipment - Panther Creek PIT Tag Array 02/28/2014 12/18/2013
Mixed-Stock Analyses Completed E: 141. Genetic Analysis of the Origin of Panther Creek Chinook salmon 06/30/2014
Mixed-Stock Analyses Completed F: 141. Genetic Analysis of the Origin of Yankee Fork Chinook salmon 06/30/2014 06/30/2014
Data Collected G: 157. Spawning Ground Surveys, Electrofishing Surveys, and Habitat Surveys in Panther Creek 11/29/2013 11/10/2013
Attach Progress Report in Pisces H: 132. Develop Annual Progress Report for period 7/1/2012 - 6/30/2013 06/30/2014
Steelhead Streamside Incubation Project Implementation J: 176. Steelhead Streamside Incubation Project 06/30/2014 06/30/2014
Annual Operations Plan K: 174. Steelhead Streamside Incubation Project Annual Operation Plan 04/30/2014 02/28/2014
All administrative tasks fulfilled with timely quality products L: 119. Management and Administration 06/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Project Permitting - Panther Creek PIT Tag Array 07/01/2013
B 122 Develop Narrative Proposal for Supplemenation Projects 07/01/2013
C 174 Monitoring, Research, and Evaluation Plan 06/13/2013
D 70 Fish Monitoring Equipment - Panther Creek PIT Tag Array 11/07/2013
E 141 Genetic Analysis of the Origin of Panther Creek Chinook salmon 07/01/2013
F 141 Genetic Analysis of the Origin of Yankee Fork Chinook salmon 07/01/2013
G 157 Spawning Ground Surveys, Electrofishing Surveys, and Habitat Surveys in Panther Creek 11/07/2013
H 132 Develop Annual Progress Report for period 7/1/2012 - 6/30/2013 07/01/2013
I 132 Annual (technical) report for this period will be submitted in subsequent contract 07/01/2013
J 176 Steelhead Streamside Incubation Project 07/01/2013
K 174 Steelhead Streamside Incubation Project Annual Operation Plan 07/01/2013
L 119 Management and Administration 07/01/2013
M 185 Periodic Status Reports for BPA 07/01/2013