Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 62614: 2012-013-00 EXP WDFW SNAKE RIVER FALL CHINOOK M&E
Project Number:
Title:
Snake River Fall Chinook Monitoring and Evaluation
Stage:
Closed
Area:
Province Subbasin %
Middle Snake Snake Lower Middle 100.00%
Contract Number:
62614
Contract Title:
2012-013-00 EXP WDFW SNAKE RIVER FALL CHINOOK M&E
Contract Continuation:
Previous: Next:
n/a
  • 67619: 2012-013-00 EXP WDFW SNAKE RIVER FALL CHINOOK M&E
Contract Status:
Closed
Contract Description:
This project was developed to support research identified in the SRFC Hatchery and Genetic Management Plan (HGMP) Addendum and in association with the subsequent issuance of a Section 10(a)(l)(A) ESA take permit. NOAA Fisheries has indicated that this research would contribute to satisfying the requirements for the Snake River Fall Chinook portion of FCRPS RPA Actions 64 and 65. The project will help us better understand the behavior and spatial distribution of returning adults from subyearling and yearling smolt releases.

This study will 1) determine fidelity to release location of returning adults from acclimated and direct released fall Chinook subyearling smolts, and 2) quantify adult fall Chinook fallback at Lower Granite Dam. Distribution of hatchery-origin spawners is important for understanding the potential interactions of the supplementation program on natural production. Data on fall back is important when constructing escapement and productivity estimates.

This SOW describes the initial efforts to get the project going and collect the first season of data.  A request to extend this contract through 12/31/2014 will be submitted after work is underway.
Account Type(s):
Expense
Contract Start Date:
09/01/2013
Contract End Date:
12/31/2014
Current Contract Value:
$123,659
Expenditures:
$123,659

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain and submit environmental permits B: 165. Maintain Environmental Compliance 12/31/2014 12/31/2014
Mark and tag adult fall Chinook C: 158. Insert Radio Transmitters into Adult fall Chinook at Lower Granite Dam 11/30/2014 11/11/2014
Escapement monitoring data and adult production estimation D: 157. Monitor movement of Adult fall Chinook salmon in the Snake, Clearwater and Grande Ronde Rivers 12/31/2014 12/31/2014
Effectiveness of supplementation E: 162. Evaluate fidelity and fall back of fall Chinook tagged at LGD 12/31/2014
Disseminated Information F: 161. Communication of Preliminary Results 12/31/2014 12/31/2014
All administrative tasks fulfilled with timely quality products G: 119. Manage and Administer fall Chinook fidelity and fall back Project 12/31/2014 12/31/2014
DRAFT BiOp report(s) completed H: 141. Other Reports for BPA 04/11/2014 04/11/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/01/2013
B 165 Maintain Environmental Compliance 09/01/2013
C 158 Insert Radio Transmitters into Adult fall Chinook at Lower Granite Dam 09/01/2013
D 157 Monitor movement of Adult fall Chinook salmon in the Snake, Clearwater and Grande Ronde Rivers 09/02/2013
E 162 Evaluate fidelity and fall back of fall Chinook tagged at LGD 09/01/2013
F 161 Communication of Preliminary Results 09/01/2013
G 119 Manage and Administer fall Chinook fidelity and fall back Project 09/01/2013
H 141 Other Reports for BPA 09/01/2013
I 132 Progress Report will be due under subsequent contract 09/01/2013
J 141 Other Reports for BPA 09/01/2013