SOW Report
Contract 62810: 2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE (CLT)
Project Number:
Title:
Columbia Land Trust Estuarine Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 50.00%
Elochoman 5.00%
Grays 5.00%
Lower Columbia Columbia Lower 30.00%
Kalama 5.00%
Sandy 5.00%
Contract Number:
62810
Contract Title:
2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE (CLT)
Contract Continuation:
Previous: Next:
59773: 2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE
  • 66801: 2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE (CLT)
Contract Status:
Closed
Contract Description:
The recovery of Columbia River salmonids requires that a sufficient amount and diversity of habitat opportunity is provided in the estuary to accommodate the full spectrum of stocks and life history types in the basin. To accomplish this, the primary objective of this contract is to increase the diversity, extent, and spatial distribution of habitats capable of supporting multiple salmon ESUs and life history types. With this contract Columbia Land Trust will increase the development, design and construction of on-the-ground habitat restoration actions in the Columbia River Estuary that benefit threatened and endangered salmonid species and help meet survival benefit targets/goals required under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp). The Columbia Land Trust Estuarine Restoration Project is intended to assist in the implementation of RPA 37 of the 2008 FCRPS BiOp which states:  

“Estuary Habitat Implementation 2010-2018 - Achieving Habitat Quality and Survival Improvement Targets.  The AAs will provide funding to implement additional specific projects as needed to achieve the total estuary survival benefits identified in the FCRPS BA.”  
All restoration actions conceived of and implemented within this project are intended to benefit threatened and endangered salmonid species rearing and migrating in main stem and tidal habitats of the Columbia River estuary.   As a principle implementer of restoration in the Columbia Estuary, Columbia Land Trust has conserved over four thousand acres of Columbia Estuary floodplain over the last nine years.  Columbia Land Trust accomplished this by permanently securing a land base from willing land owners through fair market processes.  These lands now serve as a platform from which on-the-ground restoration projects are able to be implemented.  Columbia Land Trust restoration projects result in some of the highest survival benefits for threatened and endangered salmon in the estuary (Johnson et al. 2007).  

Columbia Land Trust will assist the Action Agencies achieve their specific estuary land protection and restoration goals by working closely with land owners, local, state and federal agencies, providing risk capital through a revolving transaction fund, negotiation capacity, legal expertise and an ability to leverage significant sources of project funding. This approach enables Columbia Land Trust to act quickly and effectively to meet estuary habitat restoration goals and allows Columbia Land Trust to accomplish restoration where other practitioners may not be able to. Columbia Land Trust has identified and is developing numerous estuary habitat acquisition and restoration projects within priority areas that this project will support.

The project types and actions developed within this contract are largely related to tidal reconnection actions that restore full or near full tidal influence to areas that have been historically disconnected from tidal and fluvial  hydrologic processes by levees, roads, dredge material and railroad causeways.  These restoration actions intend to restore such natural habitat forming processes as tidal hydrology, sediment accretion, and the movement of macro-detritus that shape and maintain estuarine wetland habitats.  Specific restoration objectives are:

1) Restore connectivity between river and floodplain, as well as in-river habitats
2) Increase shallow water peripheral and side channel habitats toward historic levels.  

Columbia Land Trust will coordinate with, and utilize the Lower Columbia River Estuary Partnership’ s Science Work Group for the initial level of scientific review for on-the-ground habitat projects.  The second level of scientific review will be done by the RPA 37 Expert Regional Technical Group as required in the 2008 BiOp; this review will be conducted in coordination with the Science Work Group.
Account Type(s):
Expense
Contract Start Date:
10/01/2013
Contract End Date:
09/30/2014
Current Contract Value:
$694,371
Expenditures:
$694,371

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Anne Creason Bonneville Power Administration Yes COR amcreason@bpa.gov (503) 230-3859
Glenn Lamb Columbia Land Trust No Supervisor glamb@columbialandtrust.org
Scott McEwen Columbia Land Trust Yes Contract Manager smcewen@columbialandtrust.org (360) 213-1210
Ian Sinks Columbia Land Trust Yes Contract Manager isinks@columbialandtrust.org (503) 799-9505
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jesse Wilson Bonneville Power Administration Yes Env. Compliance Lead jcwilson@bpa.gov (503) 230-4506
Benjamin Zelinsky Bonneville Power Administration Yes F&W Approver bdzelinsky@bpa.gov (503) 230-4737


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Produce the Necessary Environmental Compliance A: 165. Ensure All Environmental Compliance is Complete 08/20/2014 08/20/2014
All administrative tasks fulfilled with timely quality products B: 119. Provide Management and Administration of Projects 09/30/2014 09/30/2014
Documentation Describing Priorities Projects C: 114. Identify Priority Land Acquisition and Restoration Projects 09/26/2014 09/26/2014
Final Realty Package for Priority Acquisitions D: 172. Conduct All Necessary Due Diligence Related to Land Acquisition 09/30/2014 09/30/2014
Produce conceptual designs and preliminary engineering for estuary restoration projects. E: 175. Produce Conceptual Designs and Preliminary Engineering for Estuary Restoration Projects 09/30/2014 09/30/2014
Tidegate replacement F: 180. WALLUSKI-- Replace failing tidegate 09/30/2014
Invasive Gorse Removal H: 199. WALLACUT-- Remove Invasive Plants 11/30/2013 11/30/2013
Wallacut Pre-restoration Level 3 AEMR data collection I: 157. WALLACUT-- 1-YR Pre-Restoration Level 3 AEMR Data Collection 09/30/2014 09/30/2014
Plant Native Vegetation at Kandoll Road Project J: 47. KANDOLL-- Plant Vegetation 09/30/2014 09/30/2014
Removal of Invasive Vegetation at Kandoll Road K: 199. KANDOLL-- Remove Invasive Plants 04/30/2014 04/30/2014
Attach Presentations in Pisces N: 161. Presentations for Annual Land Trust Rally 2014 09/30/2014 09/30/2014
Attach 2013 RME Report in Pisces P: 132. Submit RME Report-- 2013 03/15/2014 03/15/2014
Attach Progress Report in Pisces Q: 132. Submit Progress Report for the period (Jan 2013--Dec 2013) 02/28/2014 02/28/2014
Kandoll Farm Phase 2 Culvert Removal & Fill R: 98. KANDOLL-- Remove and Fill Culverts 09/30/2014 09/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 98 Other
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
Sockeye (Oncorhynchus nerka) - All Populations
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (Oncorhynchus mykiss) - All Populations
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 98 Other
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Ensure All Environmental Compliance is Complete 10/01/2013
B 119 Provide Management and Administration of Projects 10/01/2013
C 114 Identify Priority Land Acquisition and Restoration Projects 10/01/2013
D 172 Conduct All Necessary Due Diligence Related to Land Acquisition 10/01/2013
E 175 Produce Conceptual Designs and Preliminary Engineering for Estuary Restoration Projects 07/25/2013
F 180 WALLUSKI-- Replace failing tidegate
G 180 WALLACUT-- Dike Removal-- CANCELLED
H 199 WALLACUT-- Remove Invasive Plants 10/01/2013
I 157 WALLACUT-- 1-YR Pre-Restoration Level 3 AEMR Data Collection 10/01/2013
J 47 KANDOLL-- Plant Vegetation 10/01/2013
K 199 KANDOLL-- Remove Invasive Plants 10/01/2013
L 40 LOWER ELOCHOMAN-- Install Elk Exclusion Fence-- CANCELLED
M 175 CROOKED CREEK-- 30% Design-- CANCELLED 10/01/2013
N 161 Presentations for Annual Land Trust Rally 2014 10/01/2013
O 185 Periodic Status Reports for BPA 10/01/2013
P 132 Submit RME Report-- 2013 10/01/2013
Q 132 Submit Progress Report for the period (Jan 2013--Dec 2013) 10/01/2013
R 98 KANDOLL-- Remove and Fill Culverts 09/22/2014