SOW Report
Contract 63756: 2008-903-00 EXP ESA HABITAT RESTORATION
Project Number:
Title:
ESA Habitat Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
63756
Contract Title:
2008-903-00 EXP ESA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
59850: 2008-903-00 EXP ESA HABITAT RESTORATION
  • 67741: 2008-903-00 EXP ESA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
Since 2013 Geographic Review the ESA Habitat Restoration Program has retooled it's objectives to assist as a first priority; implementing habitat restoration, and additional data collection in the Yankee Fork Salmon River.  In 2014 will be implementing on-the-ground habitat restoration projects in Yankee Fork, Lemhi River, Panther Creek, and Upper Salmon River watersheds.  This year the ESA program will collaborate work and cost-share with various agencies, non-profit organization within the Salmon Subbasin; Sawtooth National Recreation Area (SNRA); IDTeam members: Bureau of Reclamation (BOR), ID-OSC Pacific Coastal Salmon Recovery Funds (PCSRF), Trout Unlimited (TU), and private land owners.  Habitat projects to be implemented in 2014 are exclosure fence on Lee Creek, and Upper Salmon on Pole Creek, as well there will be continued work on Kenney Creek from 2012, and 2013 follow-up revegetation and fence work on Lee Creek; both of the latter two are tributaries of the Lemhi River.  This year there is a carry-over project to replace a culvert with a  bridge on Pole Creek to improve fish passage and complement the project area and a suite of habitat restoration actions.  In addition to those there will be a stream restoration project on Panther Creek by removing an abandoned diversion, remove berms, and leave a straightened channel to allow Panther Creek to flow sinuously back across and through the riparian area.





CCR 33056 cancels the milestones for Work Elements F (Pole Creek Fence), H (Panther Creek Stream Restoration), and K (North Fork Habitat Improvement).  Corresponding line-item budgets have been moved to the fund the  increased cost for completion of WE G (Pole Creek Bridge).
Account Type(s):
Expense
Contract Start Date:
01/01/2014
Contract End Date:
12/31/2014
Current Contract Value:
$502,098
Expenditures:
$502,098

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Steven Campbell Shoshone-Bannock Tribes No Interested Party scampbell@sbtribes.com (208) 236-1047
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Sammy Matsaw Shoshone-Bannock Tribes Yes Technical Contact smatsaw@sbtribes.com (208) 239-4550
Gaylene Turnage Shoshone-Bannock Tribes No Administrative Contact gturnage@sbtribes.com (208) 478-3821
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Provide all Environmental Compliance documents to BPA A: 165. Environmental Compliance 12/31/2014 12/31/2014
Planning, Prioritize and Selecting habitat restoration projects B: 114. Prioritize & Select Habitat Projects 12/31/2014 12/31/2014
Conference attending, presenting and communicating fisheries science C: 99. Conference attendance and presentation 10/31/2014 10/31/2014
Lee Creek Historical Reconnect, Cottom Ranch Project D: 30. Lee Creek Revegetation 07/31/2014 06/06/2014
Lee Creek/Lemhi River Exclosure fence E: 40. Lee Creek/Lemhi River Exclosure Fence 07/31/2014 06/06/2014
Pole Creek culvert to bridge G: 184. Pole Creek culvert to bridge 10/31/2014 10/31/2014
Kenney Creek Troughs I: 34. Kenney Creek Troughs 11/01/2014 11/01/2014
Yankee Fork Mainstem: Jordan Creek to Eightmile Creek LWD J: 29. Yankee Fork Mainstem: Jordan Creek to Eightmile Creek LWD 12/31/2014 12/31/2014
Yankee Fork CHaMP/AEM data collection L: 157. Yankee Fork CHaMP/AEM data collection 12/31/2014 12/31/2014
Yankee Fork CHaMP/AEM disseminate data M: 161. Yankee Fork CHaMP/AEM disseminate data 12/31/2014 12/31/2014
Administrative tasks fulfilled with timely quality products N: 119. Administer & Manage ESA Habitat 12/31/2014 12/31/2014
Attach Progress Report in Pisces O: 132. Submit Progress Report for the period 1/1/2013 to 12/31/2013 01/31/2014 01/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 01/01/2014
B 114 Prioritize & Select Habitat Projects 01/01/2014
C 99 Conference attendance and presentation 01/01/2014
D 30 Lee Creek Revegetation 01/01/2014
E 40 Lee Creek/Lemhi River Exclosure Fence 01/14/2014
F 40 Pole Creek II: Upper Salmon River Exclosure Fence 01/01/2014
G 184 Pole Creek culvert to bridge 01/14/2014
H 29 Panther Creek Stream Restoration 01/01/2014
I 34 Kenney Creek Troughs 01/01/2014
J 29 Yankee Fork Mainstem: Jordan Creek to Eightmile Creek LWD 01/01/2014
K 29 North Fork Habitat Improvement 01/01/2014
L 157 Yankee Fork CHaMP/AEM data collection 01/14/2014
M 161 Yankee Fork CHaMP/AEM disseminate data 01/01/2014
N 119 Administer & Manage ESA Habitat 01/01/2014
O 132 Submit Progress Report for the period 1/1/2013 to 12/31/2013 01/01/2014
P 132 2014 annual report met in 2015 contract 01/01/2014
Q 185 Periodic Status Reports for BPA 01/01/2014