Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64132: 1998-007-03 EXP GRANDE RONDE SUPPLEMENTATION O&M
Project Number:
Title:
Grande Ronde Supplementation O&M on Catherine Creek/Upper Grande Ronde River
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
64132
Contract Title:
1998-007-03 EXP GRANDE RONDE SUPPLEMENTATION O&M
Contract Continuation:
Previous: Next:
60221: 1998-007-03 EXP GRANDE RONDE SUPPLEMENTATION O&M
  • 67993: 1998-007-03 EXP GRANDE RONDE SUPPLEMENTATION O&M
Contract Status:
Closed
Contract Description:
I. Project Goal

To preserve the genetic variability and enhance the population size of the depressed spring Chinook salmon populations in Catherine Creek and the Upper Grande Ronde River using a hatchery program based on the indigenous stock.

RPA 177: In 2002, BPA shall begin to implement and sustain NMFS-approved, safety-net projects.
Deliverables:  All of the deliverables contained in this statement of work will apply to this RPA.

II. Background

The ceded lands and usual and accustomed fishing sites in northeast Oregon of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) include areas where fish and wildlife populations have been negatively affected by the construction and operation of mainstem Columbia and Snake River dams. CTUIR is seeking restoration of these populations.  

The CTUIR, Nez Perce Tribe (NPT), and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSP) to increase natural production and eventually allow harvest of spring Chinook salmon in the Grande Ronde River basin. This integrated salmon program uses captive and conventional broodstock artificial propagation components in order to prevent extinction, supplement natural production and restore productive fisheries in currently underutilized habitat in the Grande Ronde River basin. A comprehensive plan developed by comanagers to more functionally combine and integrate the captive brood and conventional components of the program was completed in 1998. All aspects of the GRESCSP are fully integrated with the Lower Snake River Compensation Plan (LSRCP).  Project activities are incorporated into the LSRCP/BPA Annual Operations Plan.

The GRESCSP is an extension of the LSRCP which has temporarily changed the emphasis of its spring Chinook programs from mitigation to conservation.  Grande Ronde Basin tributaries currently being targeted for spring Chinook supplementation under LSRCP include the upper Grande Ronde River, Catherine Creek and the Lostine River.  The primary focus of this project is the programs directed at Catherine Creek and the upper Grande Ronde River which lie within the ceded lands boundary of CTUIR.

The captive broodstock component of the program was initiated by NPT and ODFW in 1995 under initial funding from LSRCP.  CTUIR became involved in the program in late 1996.  Naturally-produced juvenile salmon are captured from three tributaries of the Grande Ronde River (Catherine Creek, upper Grande Ronde, and Lostine rivers) and then reared to maturity and spawned in captivity. Spawning of mature captive brood fish began in 1998.  Final rearing of these captive broodstock progeny occurs at Lookingglass Hatchery.  Smolts are then transferred back to their stream of origin for acclimation and release.

The conventional broodstock component of the program began in 1997 on the same three Grande Ronde tributaries.  Naturally-produced adult spring Chinook salmon are captured at weirs on these tributaries and taken to Lookingglass Hatchery for spawning. CTUIR operates the adult collection weirs in the upper Grande Ronde River and Catherine Creek for population monitoring and collection of conventional broodstock. Due to low numbers of returning adults, no conventional broodstock were spawned from either Catherine Creek or the upper Grande Ronde River until 2001.  As with the captive brood portion of the program, final rearing of the conventional progeny is expected to occur at Lookingglass Hatchery.  Smolts will then be transferred back to their stream of origin for acclimation and release.

CTUIR operates juvenile acclimation facilities for spring Chinook salmon in the upper Grande Ronde River and Catherine Creek. The first juveniles produced from the program were1998 brood captive brood progeny which were acclimated and released in 2000. Our current annual smolt production goal at the Catherine Creek facility is 150,000 and our annual smolt production goal at the upper Grande Ronde is 250,000.


V. BPA-Furnished Property

BPA will provide all required water right permits from Oregon Water Resources (water rights) and instream work permits from the Division of State Lands for all facilities.
1. Catherine Creek acclimation water right and intake maintenance
2. Catherine Creek adult weir maintenance.
3. Upper Grande Ronde acclimation water right and intake maintenance.
4. Upper Grande Ronde adult weir maintenance.

In 2002 the project was divided into 2 separate Projects, Operations and Maintenance (1998-007-03) and Monitoring and Evaluation (2007-083-00).
Account Type(s):
Expense
Contract Start Date:
01/01/2014
Contract End Date:
12/31/2014
Current Contract Value:
$525,401
Expenditures:
$525,401

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Steve Boe Umatilla Confederated Tribes (CTUIR) No Interested Party steveboe@ctuir.org (541) 429-7944
Julie Burke Umatilla Confederated Tribes (CTUIR) Yes Administrative Contact julieburke@ctuir.org (541) 429-7292
Katey Grange Bonneville Power Administration Yes Env. Compliance Lead kcgrange@bpa.gov (503) 230-4047
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jon Lovrak Umatilla Confederated Tribes (CTUIR) No Technical Contact jonlovrak@ctuir.org (541) 429-7278
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Mike McLean Umatilla Confederated Tribes (CTUIR) Yes Contract Manager mikemclean@ctuir.org (541) 429-7960
Brian Zimmerman Umatilla Confederated Tribes (CTUIR) No Supervisor brianzimmerman@ctuir.org (541) 429-7286


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Documentation and assistance to support BPA's Environmental Compliance Group. A: 165. Obtain Permits and submit copies to BPA NEPA group. 12/31/2014 12/31/2014
Hatchery program for upper Grande Ronde River B: 176. Upper Grande Ronde Hatchery Program 10/31/2014 08/15/2014
Hatchery program for Catherine Creek. C: 176. Catherine Creek Hatchery Program 09/15/2014 07/31/2014
Environmental conditions, fish numbers, fish condition, PIT tag information, fish spawned D: 157. Collection of data at facilities 11/01/2014 11/01/2014
Data Analysis of Current Data Collection For Management Decisions E: 162. Data Analysis For Management 12/31/2014 12/31/2014
Maintain Upper Grande Ronde facilities F: 61. Upper Grande Ronde Facility Maintenance 12/31/2014 12/31/2014
Maintain Catherine Creek facilities G: 61. Catherine Creek Facility Maintenance 12/31/2014 12/31/2014
Maintain La Grande Shop/Office. H: 61. La Grande Office/Shop Maintenance 12/31/2014 12/31/2013
Attend meetings for project implementation I: 189. Coordination of Project Activities 12/31/2014 12/31/2014
Produce Plans J: 174. Produce AOP 02/28/2014 02/28/2014
Produce quarterly reports K: 141. Other Reports for BPA 12/31/2014 12/31/2014
Send weekly reports to co-managers during periods of acclimation and adult facility operation L: 161. Weekly Reports 10/15/2014 09/22/2014
Attach Progress Report in Pisces M: 132. Submit Progress Report for the period Jan 1 - Dec 31, 2013 05/15/2014 01/23/2014
FY15 SOW, Budget, Property Inventory & September Accrual Estimate N: 119. Annual Budget Package/Accrual Reports/Provincial Review 12/31/2014 12/24/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 3 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group. 01/01/2014
B 176 Upper Grande Ronde Hatchery Program 11/14/2013
C 176 Catherine Creek Hatchery Program 11/14/2013
D 157 Collection of data at facilities 11/14/2013
E 162 Data Analysis For Management 01/01/2014
F 61 Upper Grande Ronde Facility Maintenance 11/14/2013
G 61 Catherine Creek Facility Maintenance 11/14/2013
H 61 La Grande Office/Shop Maintenance 11/14/2013
I 189 Coordination of Project Activities 01/01/2014
J 174 Produce AOP 11/14/2013
K 141 Other Reports for BPA 01/01/2014
L 161 Weekly Reports 01/01/2014
M 132 Submit Progress Report for the period Jan 1 - Dec 31, 2013 01/01/2014
N 119 Annual Budget Package/Accrual Reports/Provincial Review 01/01/2014
O 185 Periodic Status Reports for BPA 01/01/2014