Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64623: 2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
Project Number:
Title:
Habitat Restoration Planning/Design/Implementation within boundaries of Warm Springs Reservation, lower Deschutes River, Oregon
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Deschutes 100.00%
Contract Number:
64623
Contract Title:
2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
Contract Continuation:
Previous: Next:
60707: 2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
  • 68230: 2008-301-00 EXP HABITAT RESTORATION PLAN/DESIGN IMPLEMENT WSR
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) will develop and execute the Confederated Tribes of the Warm Springs Reservation of Oregon Habitat Restoration Program (CTWSHRP).  This program will focus on projects aimed at improving instream habitat along with holistic watershed restoration directed at factors limiting salmonid production.  Projects will occur mostly on the Warm Springs Indian Reservation.  

Projects will target four limiting factors including habitat complexity and quantity, fine sediment, water temperature and altered hydrology.  These projects will be tiered to the Deschutes River Subbasin Plan, and the Mid-Columbia Steelhead Recovery Plan.  All of the projects will focus on the Tribes goal of sustaining harvestable levels of fish for many generations.  The limiting factors were developed using guidance from the U.S. Fish and Wildlife Service (USFWS) and NOAA Fisheries matrix indicator methods for making Endangered Species Determinations and were linked with biological monitoring and production data collected by Tribal Fisheries staff on the Reservation.

Instream and watershed restoration projects are important in this portion of the Deschutes Basin for several reasons.  The 660,000 acre Warm Springs Indian Reservation provides critical habitat for wild populations of spring Chinook salmon, Mid-Columbia summer steelhead, bull trout, redband trout, Pacific lamprey, and a variety of other native non-salmonid species.  Protection and maintenance of these populations is important to Tribal culture and future harvest opportunities.  The new regulatory license agreement for the Pelton-Round Butte Hydroelectric Complex (~river mile 100) requires the co-owners to reintroduce salmon and steelhead into the upper Deschutes Basin.  The populations downstream of the hydro complex on the Reservation will provide the donor stock for rebuilding the populations upstream.      

The CTWSHRP will use funding from the recent Memorandum of Agreement between the Tribes and the Bonneville Power Administration (BPA) matched with funding from the National Resources Conservation Service (NRCS), the Pacific Coastal Salmon Recovery Fund, the Oregon Watershed Enhancement Board, the Pelton-Round Butte Fund, and other competitive sources.  Additionally, the program will have access to restoration funding received through the American Transport Inc.  1999 gasoline spill settlement fund.  It is anticipated that over the next ten years (2008-2018) these funds will exceed $6 million dollars.

Projects will be planned by Tribal staff from the Fish Habitat Program, designed by the NRCS or other technical assistance providers, and implemented by both Tribal and non-tribal contractors.  All projects will pass through the Tribe’s Integrated Resource Management Planning process and complete the required Endangered Species Act (ESA) consultation.
Account Type(s):
Expense
Contract Start Date:
03/01/2014
Contract End Date:
02/28/2015
Current Contract Value:
$703,822
Expenditures:
$703,822

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
NEPA Compliance Requirements Complete for Habitat Restoration Projects To Be Implemented A: 165. Obtain Environmental Compliance 02/28/2015 06/30/2014
Riparian Fence Monitoring Report B: 186. Maintain Riparian Fencing 02/28/2015 02/09/2015
Riparian Fence Monitoring Report C: 186. Maintain Water Developments 02/28/2015 02/09/2015
Mill Creek Habitat Restoration Project Completion Report D: 30. Mill Creek Habitat Restoration Project 02/28/2015
Mill Creek Habitat Restoration Project Completion Report E: 180. Mill Creek Habitat Restoration Project 02/28/2015
Mill Creek Habitat Restoration Project Completion Report F: 29. Mill Creek Habitat Restoration Project 02/28/2015
Mill Creek Habitat Restoration Project Completion Report G: 47. Mill Creek Habitat Restoration Project 02/28/2015
2014 Effectiveness Monitoring H: 157. Collect Monitoring Data on Habitat Restoration & Protection Projects 02/28/2015 02/09/2015
Out Year Planning Summary I: 114. Identify & Select Projects for Future Implementation 02/28/2015 02/09/2015
Education & Outreach Summary J: 99. Communication with Tribal Public 02/28/2015
Attach Progress Report in Pisces K: 132. Submit Progress Report for the Period (March 2013) to (Feb 2014) 01/31/2015 01/15/2015
Funding Package - Submit Package To COTR M: 119. Manage Project 11/30/2014 11/10/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Deschutes River Summer/Fall ESU
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
Lamprey, Pacific (Entosphenus tridentata)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Environmental Compliance 03/01/2014
B 186 Maintain Riparian Fencing 12/05/2013
C 186 Maintain Water Developments 12/05/2013
D 30 Mill Creek Habitat Restoration Project 03/13/2014
E 180 Mill Creek Habitat Restoration Project 03/13/2014
F 29 Mill Creek Habitat Restoration Project 03/13/2014
G 47 Mill Creek Habitat Restoration Project 03/01/2014
H 157 Collect Monitoring Data on Habitat Restoration & Protection Projects 03/01/2014
I 114 Identify & Select Projects for Future Implementation 03/01/2014
J 99 Communication with Tribal Public 03/01/2014
K 132 Submit Progress Report for the Period (March 2013) to (Feb 2014) 03/01/2014
L 185 Periodic Status Reports for BPA 03/01/2014
M 119 Manage Project 03/01/2014