Contract 65556: 2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity and Spatial Structure Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 5.00%
Methow 35.00%
Okanogan 25.00%
Wenatchee 35.00%
Contract Number:
65556
Contract Title:
2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
Contract Continuation:
Previous: Next:
61612: 2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
  • 69256: 2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
Contract Status:
Closed
Contract Description:
In 2014 we plan to install a new permanent array at the OID (Okanogan Irrigation District) diversion on Salmon Creek. Additional interrogation system installations may occur in Canada beginning in Shuttleworth Creek (depending on inter governmental approvals) provided addition dollars for equipment can be secured from other sources (Approximately 20K short at present). If additional temporary arrays can be secured they will be placed in either Whitestone Creek, upper Ninemile Creek, Chiliwist Creek or McClean Creek with ongoing O&M at all remaining sites.

Prior to this project only one intermittent PIT tag array existed in the Okanogan River basin on Omak Creek. With the funding from this project the Colville Tribes have partnered with WDFW and BPA to embark upon creating a basin wide network of PIT-tag interrogation systems throughout the Okanogan River basin numbering close to 30 when the goal is fully realized. This contract supports installation and ongoing O&M for these sites. To date, 9 permanent systems (7 constructed under this contract and 2 under other funding) are operating within the Okanogan River Basin. These sites are used to enumerate both adult returns and juvenile out-migrants on perennial streams and the mainstem river. Another 11 total (8 constructed under this project and 3 from another funding source) temporary interrogation sites are operated seasonally. The O&M for all these arrays (except those funded through other sources) is provided under this contract.

WDFW will be the research lead for the project and will conduct all the analysis and complete research reports, obtain all necessary environmental compliance permits under CR-272835 for the project which includes CR-272836. Andrew Murdoch will be the point of contact for WDFW.  Colville Confederated Tribes (CCT) will be the primary contractor for array installation, operation, and maintenance of sites located within the Okanogan Basin.  John Arterburn is the point of contact for the CCT.

BiOp reporting for this contract will be covered under CR# 272835, 2010-034-00 EXP UPPER COLUMBIA SPRING CHINOOK, by Andrew Murdoch of the WDFW.

Background Information concerning the overall project:

This contract provides funding to expand BPA project # 2010-034-00 into the Okanogan subbasin to complete coverage of the entire Upper Columbia ESU for summer steelhead. The master project is part of a unique, well coordinated,  and standardized group of monitoring and evaluation program(s) that exist in the Upper Columbia River Basin.  Monitoring and evaluation programs are funded by a combination of  federal (BPA, BOR, USFWS), State, Tribal, and regional (PUDs) entities.  While all these various programs contribute data to estimate VSP parameters for spring Chinook and summer steelhead, these programs also share common deficiencies related to precision and accuracy of the abundance estimates.  Existing M & E activities combined with recent advances in PIT tag technology provide an opportunity to improve the quality of the data generated to make proper management decisions concerning ESA listed species.  The overall objectives of the project are to: 1) evaluate precision and accuracy of the smolt monitoring methodology for both steelhead and spring Chinook , 2) estimate the proportion of hatchery steelhead in each primary population, 3) estimate the precision of redd counts for both steelhead and spring Chinook and 4) evaluate the accuracy of the steelhead spawning ground survey design.  This contract provides operations and maintenance support to the Colville Tribes that supports basin wide PIT tag integration infrastructure used for a multitude of monitoring and evaluation efforts.  These tasks address in part or fully the critical uncertainties identified under Supplementation in the Columbia River Basin Research Plan (2006-03) and steelhead population characteristics (abundance, productivity, and ratio of hatchery fish) under the Fish and Wildlife Program.  Additionally, all of the studies in this proposal are directly consistent with RPAs for the FCRPS BiOp.  In summary, the umbrella project seeks to build on the existing programs in all the subbasins while this contract focuses on supporting the PIT tagging efforts specific to the Okanogan River basin. This contract provides information and equipment needed for long term monitoring of VSP parameters with a known level of accuracy and precision of the Okanogan subbasins summer steelhead population that link directly to a subset of tasks contained in the umbrella project (i.e. PIT-tag array deployment and development of precision and accuracy estimates, validation of summer steelhead redd survey methodology, and potentially a more viable way to enumerate adult steelhead returns under all environmental conditions).
Account Type(s):
Expense
Contract Start Date:
07/01/2014
Contract End Date:
06/30/2015
Current Contract Value:
$140,858
Expenditures:
$140,858

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance documents provided under CR-272835 A: 165. Environmental compliance documents for this project provided under CR-272835 06/30/2015 06/30/2015
All administrative tasks fulfilled with timely quality products B: 119. Manage and administer project 06/30/2015 06/30/2015
Conducted site specific assessments and developed landowner agreements C: 114. Conduct site specific assessments and develop landowner agreements 06/30/2015 06/30/2015
Installation, operation, and maintenance of permanent PIT tag arrays D: 70. Installation, operation, and maintenance of permanent in-stream PIT tag arrays. 06/30/2015 06/30/2015
PIT tag recapture data uploaded E: 159. Upload PIT tag data to PTAGIS database 06/30/2015 06/30/2015
Number and age of hatchery and wild steelhead based upon PIT tag detections estimated F: 162. Estimate the number and age of hatchery and wild steelhead 06/30/2015 06/30/2015
Installed, operated, maintain, and removed temporary PIT tag antennas G: 70. Construct, install, maintain, and remove temporary PIT tag arrays in preselected locations 06/30/2015 03/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documents for this project provided under CR-272835 07/01/2014
B 119 Manage and administer project 07/01/2014
C 114 Conduct site specific assessments and develop landowner agreements 07/01/2014
D 70 Installation, operation, and maintenance of permanent in-stream PIT tag arrays. 04/28/2015
E 159 Upload PIT tag data to PTAGIS database 07/01/2014
F 162 Estimate the number and age of hatchery and wild steelhead 07/01/2014
G 70 Construct, install, maintain, and remove temporary PIT tag arrays in preselected locations 04/28/2015
H 185 Periodic Status Reports for BPA 07/01/2014
I 132 Submit Progress Report - Not applicable in this contract 07/01/2014