Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67015: 2007-395-00 EXP NPT LOCHSA WATERSHED RESTORATION
Project Number:
Title:
Protect and Restore Lochsa Watershed
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
67015
Contract Title:
2007-395-00 EXP NPT LOCHSA WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
63419: 2007-395-00 EXP NPT LOCHSA WATERSHED RESTORATION
  • 71057: 2007-395-00 EXP NPT LOCHSA WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Project/Contract History:

This project is a component of the Nez Perce-Clearwater National Forests-Nez Perce Tribe Watershed Restoration Partnership.  This project represents a combination of two ongoing BPA and NPT restoration projects, Project 1996-077-03, Project 2002-074-00, and an extension of the project area to include the entire Lochsa Watershed rather than just the upper watersheds.  This project unification has significantly increased administrative and financial efficiency in order to maximize the direct benefit to fish and wildlife.

Restoration follows a ridge top to ridge top approach with implementation focused on decreasing sediment inputs into area streams, increasing aquatic habitat connectivity, decreasing resource impacts from roads, and eradicating exotic, invasive plants. The cost share for this project has been contributed by the Nez Perce-Clearwater National Forests who provides an approximate 20% match including cash and in-kind contributions. Project planning and implementation responsibilities are also shared with the Forest.

To date, the partnership has re-opened access to 88.95 miles of habitat, removed 503 miles of road through decommissioning or abandonment, improved 35.4 miles of road, planted 784.4 acres of vegetation, and treated over 2,234 acres of invasive, non-native plants. Major activities proposed for the 2014-18 funding cycle include over 18 miles of habitat re-opened through barrier removal/replacement, 119 miles of road decommissioning, 35 miles of road improvement or relocation, 250 acres of planting, 5,000 acres of weed treatment, approximately 1,500 feet of channel reconstruction, a vehicle wash station at Lolo Pass, investigating the potential to reconnect 3-5 major meanders in the Lochsa River, and the addition of large wood into streams.


FY 2015 Contract Implementation:

FY 15 implementation includes the removal of up to 15 miles of roads (to reduce sediment inputs to streams), up to 20 miles of spraying previously decommissioned roads to reduce invasive weeds (to reduce chronic sediment inputs to priority spawning streams), up to 6 culvert replacements (to improve hydrologic capacity and reduce potential sediment delivery, as well as  provide habitat connectivity), planting up to 2,000 native riparian shrubs/trees, planting up to 40,000 additional native trees, installing wood into Waw’alamnima  Creek and relocating the 108 road in that immediate area, and continued planning and coordination for future habitat improvement projects.

NPT Watershed personnel will also conduct invasive weed treatment, an invasive weed inventory, and continue an inventory of roads and culverts throughout the Lochsa watershed in order to identify fish passage barriers and road associated risks to aquatic species.  

Matching Costs Summary 2015: In 2015 the Nez Perce-Clearwater National Forests will provide approximately 20% of project costs for road decommissioning/improvement and culvert replacement, which includes project planning, contract administration, and implementation as described in the existing MOA with BPA.    

In addition, the project will seek outside matching funds for the invasive species wash station at Lolo Pass and the project to reconnect one of the five meanders that are currently disconnected from the Lochsa River by Highway 12.
Account Type(s):
Expense
Contract Start Date:
12/01/2014
Contract End Date:
11/30/2015
Current Contract Value:
$1,280,023
Expenditures:
$1,280,023

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
David Forestieri Nez Perce Tribe Yes Contract Manager dforestieri@nezperce.org (208) 942-0318
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Amber MacLachlan Bonneville Power Administration Yes Contracting Officer almcmahon@bpa.gov (503) 230-3983
Heidi McRoberts Nez Perce Tribe No Administrative Contact heidim@nezperce.org (208) 621-3548
Emmit Taylor, Jr. Nez Perce Tribe Yes Supervisor emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance documentation submitted to BPA A: 165. Provide Necessary Environmental Compliance Documentation to BPA 11/30/2015 11/30/2015
Provide periodic review of proposed partner actions B: 191. Review of Proposed Partner Actions 11/30/2015 11/30/2015
Alkire Creek Culvert Replacement C: 184. Replace the Alkire Creek Culvert 10/31/2015 10/31/2015
EFK Imnamatnoon Creek Tributary Culvert Replacement D: 184. Replace the EFK Imnamatnoon Creek Tributary Culvert 10/31/2015 10/31/2015
Erosion and Sedimentation Prevented E: 55. Replace up to 4 Brushy Fork Tributary Culverts- Phase II 10/31/2015 10/31/2015
15 Miles of Roads Decommissioned F: 33. Mt. Fugi Road Decommissioning 10/31/2015 10/31/2015
108 Road Relocation and Instream Wood Installation G: 33. 108 Road Relocation 11/30/2015 11/30/2015
Plant native species in disturbed areas on previously decommissioned roads H: 47. Road Decommissioning Planting 11/30/2015 11/30/2015
Chemically and Mechanically Treat Invasive Plant Species I: 199. Treat Exotic Invasive Species 11/30/2015 11/30/2015
Erosion Prevented for Culverts and Roads J: 55. Erosion Control on Culvert Replacments, Decommissioned/Improved Roads 10/30/2015 10/30/2015
Completed Weed Inventory and Data Analysis K: 115. Inventory of Invasive Plants 11/30/2015 11/30/2015
Road and Culvert Inventory L: 115. Collect Data on Roads and Culverts to Identify Aquatic Impacts 11/30/2015 11/30/2015
Update Database M: 160. Input & Analyze Road, Weed, and Culvert Data 11/30/2015 11/30/2015
Designs for Future Project Implementation N: 175. Designs for Road Decommissioning/Improvement, Channel Reconnection & Culvert Replacement 10/31/2015 10/31/2015
Watershed Condition Assessments Updated IWMP Developed O: 174. Update Watershed Condition Assessments & Develop Integrated Weed Management Plan 11/30/2015 11/30/2015
Conduct Pre-Acquisition Activities P: 172. Pre-Acquisition Activities for Checkerboard Landownership 11/30/2015
Watershed restoration and health education and outreach Q: 99. Watershed Restoration and Health Outreach and Education 11/30/2015 11/30/2015
FY 2016 Contract Package and FY 2015 Accrual Estimate R: 119. Management, Coordination, and Communication 10/31/2015 10/31/2015
Final FY 2015 annual report attached to this contract S: 132. Submit Annual Report for 12/1/14 - 11/30/15 11/30/2015 11/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 199 Remove Vegetation
  • 2 instances of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 2 instances of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 55 Erosion and Sedimentation Control
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Cutthroat Trout, Coastal (O. clarkii clarkii)- Resident Populations
  • 1 instance of WE 184 Install Fish Passage Structure
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 199 Remove Vegetation
  • 2 instances of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 33 Decommission Road/Relocate Road
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 55 Erosion and Sedimentation Control
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide Necessary Environmental Compliance Documentation to BPA 12/01/2014
B 191 Review of Proposed Partner Actions 12/01/2014
C 184 Replace the Alkire Creek Culvert 04/27/2015
D 184 Replace the EFK Imnamatnoon Creek Tributary Culvert 06/04/2015
E 55 Replace up to 4 Brushy Fork Tributary Culverts- Phase II 12/01/2014
F 33 Mt. Fugi Road Decommissioning 12/01/2014
G 33 108 Road Relocation 02/23/2015
H 47 Road Decommissioning Planting 12/01/2014
I 199 Treat Exotic Invasive Species 12/01/2014
J 55 Erosion Control on Culvert Replacments, Decommissioned/Improved Roads 12/01/2014
K 115 Inventory of Invasive Plants 12/01/2014
L 115 Collect Data on Roads and Culverts to Identify Aquatic Impacts 02/12/2015
M 160 Input & Analyze Road, Weed, and Culvert Data 12/01/2014
N 175 Designs for Road Decommissioning/Improvement, Channel Reconnection & Culvert Replacement 06/02/2015
O 174 Update Watershed Condition Assessments & Develop Integrated Weed Management Plan 12/01/2014
P 172 Pre-Acquisition Activities for Checkerboard Landownership 12/01/2014
Q 99 Watershed Restoration and Health Outreach and Education 12/01/2014
R 119 Management, Coordination, and Communication 12/01/2014
S 132 Submit Annual Report for 12/1/14 - 11/30/15 12/01/2014
T 185 Periodic Status Reports for BPA 12/01/2014