Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71145: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
Project Number:
Title:
Malheur River Wildlife Mitigation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Middle Snake Malheur 100.00%
Contract Number:
71145
Contract Title:
2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
67695: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
  • 74624: 2000-027-00 EXP MALHEUR RIVER WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The Malheur River Wildlife Mitigation Project was purchased in November 2000 to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins.  The 31,781-acre Project is located eleven miles east of Juntura, Oregon and is adjacent to the Malheur River.  The Project includes 6,385 deeded acres owned by the Burns Paiute Tribe, 4,154 acres leased from the Department of State Lands, and 21,242 acres leased from the BLM.  The Project is comprised of meadow, wetland, and shrub-steppe habitats and stretches for seven miles along the Malheur River.

In 2016, this contract will allow the Burns Paiute Tribe in the following management activities: complying with cultural resource and ESA requirements, improving and maintaining multiple vegetation communities through seeding and planting projects, identifying and controlling noxious weeds, re-establishing a riparian corridor, providing access, and education/coordination with tribal, government and general public parties.
Account Type(s):
Expense
Contract Start Date:
01/01/2016
Contract End Date:
12/31/2016
Current Contract Value:
$378,895
Expenditures:
$378,895

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Cultural Resource clearance complete A: 165. Cultural Resources/Tribal Monitor 12/31/2016 12/31/2016
Weed Control B: 198. Weed Control 12/31/2016 12/31/2016
Maintain Wet Meadow Irrigation System C: 198. Maintain Wet Meadow Irrigation 09/30/2016 09/30/2016
Haying Operations D: 198. Haying Operations 09/30/2016 09/30/2016
Graze BLM, State and Meadows. E: 199. Graze State and Meadows 09/15/2016 09/15/2016
Plant willows F: 47. Plant Willows on Riparian 12/31/2016 12/31/2016
Plant milkweed plugs G: 47. Plant Milkweed in 'wildlife field' 12/31/2016 12/31/2016
Plant seed in alfalfa field H: 47. seed alfalfa field 10/31/2016 08/15/2016
Fence Maintained I: 186. Maintain Fence 12/31/2016 12/31/2016
complete excavation of wetland ponds / culvert installation of OWEB grant project (if awarded funds) J: 181. re-contour ponds in meadow and oversee OWEB grant wetland enhancement project (if awarded) 12/31/2016 12/31/2016
Conservation Reserve Enhancement Program Maintenance K: 198. Conservation Reserve Enhancement Program Maintenance 12/31/2016 12/31/2016
Data Collected and entered L: 157. Conduct Project Surveys 12/31/2016 12/31/2016
Juniper removed M: 199. juniper eradication - NRCS SGI contract 12/31/2016 12/31/2016
Sage Grouse study N: 158. Sage Grouse Study 12/31/2016 12/31/2016
Coordination between BPA funded programs O: 98. Assist Fisheries Department 12/31/2016 12/31/2016
Access controlled P: 188. Control Access 12/31/2016 12/31/2016
Community education and information Q: 99. Public Education and Information 12/31/2016 12/31/2016
Tribal education complete R: 99. Tribal Community Education 12/31/2016 12/31/2016
Staff education and communication S: 99. Seminars/Training for staff 12/31/2016 12/31/2016
Project administration T: 119. Project Administration 12/31/2016 12/31/2016
Completed Annual Report V: 132. Submit Progress Report for the period (1/1/2015) to (12/31/2015) 02/29/2016 02/29/2016
Improved roads X: 38. Improve roads on mitigation site 12/31/2016
Update energy efficiency of Site Manager's House Y: 186. Update energy efficiency of Site Manager's House 12/31/2016 12/31/2016
Restored and Updated Data Management System Z: 160. Post Fire Data Management 12/31/2016 12/31/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 98 Other
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 98 Other
Wildlife
  • 4 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 199 Remove Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Cultural Resources/Tribal Monitor 01/01/2016
B 198 Weed Control 02/10/2016
C 198 Maintain Wet Meadow Irrigation 02/10/2016
D 198 Haying Operations 02/10/2016
E 199 Graze State and Meadows 02/10/2016
F 47 Plant Willows on Riparian 11/09/2016
G 47 Plant Milkweed in 'wildlife field' 07/26/2016
H 47 seed alfalfa field 02/10/2016
I 186 Maintain Fence 02/10/2016
J 181 re-contour ponds in meadow and oversee OWEB grant wetland enhancement project (if awarded) 11/09/2016
K 198 Conservation Reserve Enhancement Program Maintenance 02/10/2016
L 157 Conduct Project Surveys 02/10/2016
M 199 juniper eradication - NRCS SGI contract 02/10/2016
N 158 Sage Grouse Study 02/10/2016
O 98 Assist Fisheries Department 02/10/2016
P 188 Control Access 02/10/2016
Q 99 Public Education and Information 01/01/2016
R 99 Tribal Community Education 01/01/2016
S 99 Seminars/Training for staff 01/01/2016
T 119 Project Administration 01/01/2016
U 185 Periodic Status Reports for BPA 01/01/2016
V 132 Submit Progress Report for the period (1/1/2015) to (12/31/2015) 01/01/2016
W 132 Prepare data for draft annual report for period 1/2016 to 12/2016 01/01/2016
X 38 Improve roads on mitigation site
Y 186 Update energy efficiency of Site Manager's House 07/08/2016
Z 160 Post Fire Data Management 01/01/2016