Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73756: 1998-019-00 EXP WIND RIVER WATERSHED WDFW
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
73756
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED WDFW
Contract Continuation:
Previous: Next:
69900: 1998-019-00 EXP WIND RIVER WATERSHED WDFW
Contract Status:
Closed
Contract Description:
Objectives of WDFW Wind River Steelhead Project:

1) Long term collection of accurate and precise Status and Trend information for Upper Gorge (Wind River) Summer Steelhead Major Population Group (MPG) within the  ESA Threatened Lower Columbia Steelhead DPS
a. VSP Parameters (Abundance, Productivity, Spatial Structure, Diversity) collected at basin and sub-basin spatial scales for multiple age classes.
b. Report on Coordinated Data Assessments High Level Indicators (HLIs) including:
     Natural Origin Spawner Abundance (NOSA)
     Juveniles per Spawner (JpS)
     Recruits per Spawner (RpS)
    Smolt to Adult Return rate (SAR)
c. Wild steelhead life cycle monitoring in a watershed with no hatchery program and limited hydrosystem impacts to serve as a reference population for understanding hydrosystem and hatchery impacts on steelhead throughout the Columbia Basin.

2)  Implement Before-After (BA) and Before-After-Control-Impact (BACI) study designs using steelhead smolt and adult abundance, productivity, and biological attributes collected as part of a long term status and trend project to measure and report on steelhead responses to Hemlock Dam Removal.

a.  Determine change in migration timing, adult age (including repeat spawner rate), and adult number (including summer versus winter run) of Trout Creek steelhead before and after removal of Hemlock Dam.
b.  Determine change in the number of steelhead a) smolts b) parr, c) parr-to-smolt ratio, and d) age at smoltification based on smolt trapping at TC, UW, and PC before and after removal of Hemlock Dam.
c.  Determine change in survival of steelhead smolts from Trout Creek before and after removal of Hemlock Dam.
d.  Determine if there is a change in smolt-to-adult return and freshwater productivity from Trout Creek before and after removal of Hemlock Dam. Null Hypothesis: There is no change in productivity and/or capacity estimate from spawner-recruit analysis before and after dam removal
Account Type(s):
Expense
Contract Start Date:
09/01/2016
Contract End Date:
08/31/2017
Current Contract Value:
$189,502
Expenditures:
$189,502

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Thomas Buehrens Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager thomas.buehrens@dfw.wa.gov (206) 715-2551
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Charlie Cochran Washington Department of Fish and Wildlife (WDFW) Yes Supervisor cochrpcc@dfw.wa.gov (360) 721-5000
Patrick Connolly US Geological Survey (USGS) No Interested Party pconnolly@usgs.gov (509) 538-2299x269
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
Michael Garrity Washington Department of Fish and Wildlife (WDFW) No Interested Party michael.garrity@dfw.wa.gov (360) 810-0877
Bryce Glaser Washington Department of Fish and Wildlife (WDFW) Yes Interested Party bryce.glaser@dfw.wa.gov (360) 906-6765
Stephanie Green Bonneville Power Administration Yes Contracting Officer sagreen@bpa.gov (360) 418-2710
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Janice Jackson Washington Department of Fish and Wildlife (WDFW) No Administrative Contact janice.jackson@dfw.wa.gov (360) 902-2444
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Dan Rawding Washington Department of Fish and Wildlife (WDFW) No Interested Party rawdidr@dfw.wa.gov (509) 493-2976
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
All administrative tasks fulfilled with timely quality products B: 119. Project Oversight 08/31/2017 08/31/2017
NOAA-Fisheries Scientific Research Permit C: 165. NOAA-Fisheries ESA Research Permit 08/31/2017 08/31/2017
Completed 2016 Annual Report D: 132. Submit 2016 RM&E Technical Report for the period (Jan2016) to (Dec2016) 05/01/2017 05/01/2017
Submit 2016 BiOp RPA Report in Taurus E: 202. BiOp RPA Report for CY 2016 03/15/2017 03/15/2017
Adult trapping and snorkel surveys. F: 157. Collect adult abundance data via mark-resight 08/31/2017 08/31/2017
Juvenile Out-migrant Trapping - 2016 G: 157. Juvenile Outmigrant Trapping 07/15/2017 07/15/2017
Juvenile tagging and PTAGIS uploads H: 158. Juvenile Tagging 08/31/2017 08/31/2017
Adult tagging and PTAGIS uploads I: 158. Adult Tagging 08/31/2017 08/31/2017
Analyze/interpret juvenile steelhead data and include results in RM&E Calendar Year Technical J: 162. Juvenile Data Analysis 01/15/2017 01/15/2017
Analyze/interpret adult steelhead data and include results in RM&E Calendar Year Technical Rep K: 162. Adult Data Analysis 03/15/2017 03/15/2017
Calculate HLIs and include results in RM&E Calendar Year Technical Report L: 162. Coordinated Data Assessments HLIs 03/15/2017 03/15/2017
Analysis of steelhead responses to Hemlock Dam removal M: 162. Hemlock Dam Steelhead Response 03/15/2017 03/15/2017
Summary memos for adult and juvenile steelhead population estimate N: 161. Summary Memos 08/31/2017 08/31/2017
Project information exchange O: 191. Exchange project activity and progress information with partner agencies 08/31/2017 08/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 4 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/01/2016
B 119 Project Oversight 09/01/2016
C 165 NOAA-Fisheries ESA Research Permit 09/01/2016
D 132 Submit 2016 RM&E Technical Report for the period (Jan2016) to (Dec2016) 09/01/2016
E 202 BiOp RPA Report for CY 2016
F 157 Collect adult abundance data via mark-resight 08/09/2017
G 157 Juvenile Outmigrant Trapping 08/09/2017
H 158 Juvenile Tagging 08/09/2017
I 158 Adult Tagging 08/09/2017
J 162 Juvenile Data Analysis 09/01/2016
K 162 Adult Data Analysis 09/01/2016
L 162 Coordinated Data Assessments HLIs 09/01/2016
M 162 Hemlock Dam Steelhead Response 09/01/2016
N 161 Summary Memos 09/01/2016
O 191 Exchange project activity and progress information with partner agencies 09/01/2016