SOW Report
Contract 82542: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
82542
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED - UCD
Contract Continuation:
Previous: Next:
79517: 1998-019-00 EXP WIND RIVER WATERSHED UCD
  • 85431: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
Contract Status:
Closed
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District (UCD), US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues Underwood Conservation District's support and participation in the project.  UCD will provide habitat restoration work in support of the recovery of the Wind River summer steelhead stock in 2019 and 2020.  Work will focus on further developing the design plans and permitting for the Little Wind River Habitat Enhancement Project, Phase IV, upstream of previous habitat work conducted by UCD.  Under the previous statement of work we selected the highest priority project that was the most ready to carry forward for implementation.  This project is being readied for potential implementation with BPA dollars in a subsequent contract.  Additional work involves maintaining vegetation at past planting sites and installing new plants at key restoration sites in the Wind River watershed.  Other work such as producing periodic (quarterly) status reports, the annual progress report, coordinating with project partners, producing environmental compliance documentation, stream temperature monitoring, as well as managing and administering the project will be funded at levels to allow continued maintenance of these activities.
Account Type(s):
Expense
Contract Start Date:
07/01/2019
Contract End Date:
06/30/2020
Current Contract Value:
$88,472
Expenditures:
$88,472

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Ann Gross Underwood Conservation District (UCD) Yes Administrative Contact ann@ucdwa.org (509) 493-1936
Carly Lemon Underwood Conservation District (UCD) No Technical Contact carly@ucdwa.org (509) 493-1936
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Paul Newell Underwood Conservation District (UCD) No Supervisor pnewell@embarqmail.com (509) 493-1936
Dan Richardson Underwood Conservation District (UCD) Yes Technical Contact dan@ucdwa.org (509) 493-1936
Jan Thomas Underwood Conservation District (UCD) Yes Technical Contact jan@ucdwa.org (509) 493-1936
Tova Tillinghast Underwood Conservation District (UCD) Yes Contract Manager tova@ucdwa.org (509) 493-1936


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance is Complete A: 165. Environmental Compliance 06/30/2020 06/18/2020
Share Project Information B: 191. Share Project Activities Updates with Project Partners 06/30/2020 06/18/2020
Complete Habitat Enhancement in Little Wind River, Phase 4 C: 29. Little Wind River Habitat Enhancement Phase IV 06/30/2020 02/28/2020
Complete Site Enhancement at High Bridge Park D: 55. Enhance Steelhead Habitat at High Bridge 06/30/2020 06/18/2020
Updated project list for future years E: 114. Identify and Develop Potential Steelhead Habitat Restoration Projects 06/30/2020 06/18/2020
Stabler Bend design complete to 90% design level F: 175. Stabler Bend Design 06/30/2020 04/15/2020
Temperature and Stage Data Collected, Stored in Water Quality Database G: 157. Water Quality and Stage Monitoring 06/30/2020 06/18/2020
Provide temperature data to RM&E Leads H: 202. Support RM&E Leads with CY2018 BiOp RPA Report 03/15/2020 03/15/2020
Submit Calendar-Year Annual Report for 2019 I: 132. Submit Progress Report for the Period Jan 01, 2019 - Dec 31, 2019 05/22/2020 06/14/2020
Manage Project K: 119. Manage and Administer Projects 06/30/2020 06/18/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 07/01/2019
B 191 Share Project Activities Updates with Project Partners 07/01/2019
C 29 Little Wind River Habitat Enhancement Phase IV 05/01/2019
D 55 Enhance Steelhead Habitat at High Bridge 05/01/2019
E 114 Identify and Develop Potential Steelhead Habitat Restoration Projects 07/01/2019
F 175 Stabler Bend Design
G 157 Water Quality and Stage Monitoring 07/01/2019
H 202 Support RM&E Leads with CY2018 BiOp RPA Report
I 132 Submit Progress Report for the Period Jan 01, 2019 - Dec 31, 2019 07/01/2019
J 185 Periodic Status Reports for BPA 07/01/2019
K 119 Manage and Administer Projects 07/01/2019