Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 85245: 2002-070-00 EXP LAPWAI CREEK WATERSHED RESTORATION
Project Number:
Title:
Lapwai Creek Anadromous Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
85245
Contract Title:
2002-070-00 EXP LAPWAI CREEK WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
82058: 2002-070-00 EXP NP SWCD LAPWAI CREEK WATERSHED RESTORATION
  • 87866: 2002-070-00 EXP LAPWAI CREEK WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
BPA project 2002-070 -00, entitled “Restoring Anadromous Fish Habitat in the Lapwai Creek Watershed”, addresses the need to restore the Lapwai Creek aquatic ecosystem so that the habitat within the watershed no longer limits recovery of the ESA Threatened lower Clearwater Steelhead population.

As a part of an ongoing partnership with the Nez Perce Tribe, the Nez Perce Soil and Water Conservation District proposes to implement habitat improvement projects to address primary limiting factors in order to increase the productivity and viability of the watershed’s steelhead population.

The NPSWCD proposes to address the primary factors limiting abundance and productivity of the focal species, steelhead (O. mykiss). The NPSWCD and NPT have prioritized restoration projects to address these limiting factors based on the Clearwater Subbasin Plan (NPPC, 2005), the Lapwai Creek Ecological Restoration Strategy (Richardson and Rasmussen, 2009), current watershed surveys (NPT 2012), and the Clearwater Expert Panel process (2012). Since the completion of the Lapwai Creek Restoration Strategy in 2009, additional habitat and fish distribution data has been collected. In 2020, the NPSWCD plans to update the 2009 plan to incorporate the adult steelhead data collected from 2012 to 2018 and juvenile distribution and abundance collected by the University of Idaho from 2015 to 2018.

Limiting factors for the Lower Clearwater Steelhead population in the Lapwai Creek watershed were identified in the 2009 Ecological Restoration Strategy and then updated during the 2012 FCPRS BiOp Expert Panel process using NOAA’s newly developed standardized terminology.  The limiting factors for the watershed include: anthropogenic barriers, riparian condition, large wood debris recruitment, bed and channel form, in-stream structural complexity, increased sediment quantity, elevated temperatures, toxic contaminants, and decreased water quantity.

Past accomplishments have entailed the installation of land improvement projects to address these limiting factors, including 9.92 miles of riparian fencing, 6.21 miles of upland fencing, 928.07 acres of weed control, two livestock waste systems, 10,916.8 LF of riparian plantings, 8 stream crossings, 12.25 miles of road improvements, 2 miles of streambank bioengineering restoration, 10.38 acres of wetland enhancement, 24,655.8 acres of direct seeding, 20 alternative watering systems for livestock, 13 water and sediment control structures, 2,200 LF grassed waterway, the development of 16 habitat conservation plans, 9.27 miles of access restored, 3.1 miles of floodplain reconnected, 85.1 acres of tree planting, and 200 acres of grass seeding.

Work planned for the May 1, 2020 through April 30, 2021 contract period includes:

- Vegetative plantings - 1.5 acres with native trees, shrubs, grass
- Maintenance of vegetation planted at 6 sites from 2015 to 2019 (21.7 acres). Protection of approximately 39 acres of wetland meadow from noxious weeds, and 0.8 acre of streambanks protected from hybrid knotweed
- Inventory and assessment on four private land parcels and development of restoration plans for those parcels
- Installation of 1,450 feet of fence
- Installation of 1,109 acres of direct seeding
- Stream temperature monitoring at 12 sites
- Preparation of non-technical annual progress report for prior contract period
- Preparation of draft RME report for 2020 temperature data
- Finalization and uploading of RME report for 2019 temperature data
- Outreach efforts to landowners in high priority restoration areas including direct mailings, website, and newsletters
- Identify and select projects for future contract periods
- Develop 1 to 4 designs for restoration projects at various sites in the Lapwai Creek basin.

Work completed under this contract assists in meeting the following objectives from the Lapwai Creek restoration plan:

Objective 1 – Reduce stream temperatures
Reduce water temperatures to levels meeting applicable water quality standards for life stage specific needs of anadromous and native resident fish, with an established upward trend in the number of stream miles meeting standards. The benchmark for this objective is to reduce overall days exceeding daily average temperatures at less than 16 degrees Celsius for spawning and rearing for anadromous salmonids and less than 20 degrees Celsius under all circumstances (NPCC 1994). Additional benchmarks for specific project types are discussed under relevant deliverables. Desired outcomes include restoring hydrologic and riparian functions related to temperature, identifying and rehabilitating wetland and floodplain areas, and continuing efforts aimed at increasing streamside shading where shading has been reduced by anthropogenic activities. This objective is consistent with the Clearwater Subbasin Management Plan, pg 35 (NPCC, 2005).

Objective 2 – Improve aquatic habitat diversity and complexity
Improve aquatic habitat diversity and complexity to levels consistent with objectives in the subbasin plan, with particular emphasis on recovery of anadromous stocks. Aquatic habitat condition (including diversity and/or complexity components) is limiting all focal species. Improvement in habitat productivity is considered critical to attainment of goals for both anadromous and resident species. Address priority problems with protection and restoration activities designed to promote development of more complex and diverse habitats through improved watershed condition and function. Desired outcomes include additions of large woody debris, stream channel reconstruction, increased side channels, increased pool quality/quantity, floodplain reconstruction, protecting and restoring wetland, and improved hydrologic functions. Management criteria includes water temperature of 16°C, adequate sources of woody debris recruitment, width to depth ratios <10, streambank conditions are >90% stable, with on average, less than 10% of banks actively eroding, and overbank flows occur on a 1.5 – 2 year event. Link to Clearwater Subbasin Plan, pg. 37 (NPCC, 2005).

Objective 3 – Reduce instream sedimentation
Reduce instream sedimentation to levels meeting applicable water quality standards, with an established upward trend in the number of stream miles meeting standards. Benchmarks for this activity include streambanks are >90% stable, < 20% cobble embeddedness, and turbidity is low (NOAA, 1996). Additional benchmarks for specific project types are discussed under relevant deliverables. Desired outcomes include restoring streambank condition, reducing sediment delivery to the stream from hydrologically connected roads and uplands, and reducing sediment inputs by implementing practices that address problems from logging, mining, agriculture, and other historic and current sediment producing activities. This objective is consistent with the Clearwater Subbasin Management Plan, pg 35 (NPCC, 2005).

Status and Trend and Implementation/Effectiveness monitoring under this contract is coordinated with the Nez Perce Tribe. The Nez Perce Tribe conducts the monitoring and evaluation required to determine population status and trends, as well as the physical and biological response to the habitat/watershed restoration efforts. The Nez Perce Soil and Water Conservation District (NPSWCD) utilizes the Nez Perce Tribe's monitoring data to prioritize habitat improvement and site specific project areas.  
Account Type(s):
Expense
Contract Start Date:
05/01/2020
Contract End Date:
04/30/2021
Current Contract Value:
$259,496
Expenditures:
$259,496

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed annual report for contract 82058, 2019 Calendar Year Stream Temperature Report, and Draft 2020 Calendar Year Stream Temperature Report. B: 132. Produce annual progress reports for the contract period 04/26/2021 04/29/2021
Environmental Compliance Requirements Completed C: 165. Environmental Compliance 04/30/2021 04/29/2021
Manage 5/1/2019 to 4/30/2020 contract D: 119. Management, Coordination, and Communication 04/30/2021 04/29/2021
Coordinate Lapwai Creek Watershed Activities E: 191. Coordinate Lapwai Creek Watershed Activities 04/30/2021 04/29/2021
Produce an accessible, error-checked dataset with metadata for the stream temperature data collected in 2020. F: 157. Stream Temperature Data Collection in the Lapwai Creek Watershed 04/29/2021 04/29/2021
Updated GIS database G: 160. Maintain project database 04/30/2021 04/29/2021
Outreach plan implementation H: 99. Implement Lapwai Watershed outreach plan 04/30/2021 04/29/2021
Projects selected for installation in future contract years I: 114. Select, Prioritize, and Obtain Permission for 2021-2023 Projects 04/20/2021 04/29/2021
Completed Inventory and assessment on up to 4 non-tribal Properties J: 115. Complete Habitat Restoration Plans 04/26/2021 04/29/2021
Inventory/Analysis K: 115. Lapwai Creek RM 10 Inventory/Analysis Project number 20-2175 04/30/2021 04/29/2021
Design package for 1 to 4 land improvement projects L: 175. Prepare Engineering and Technical Designs for 2020/2021 Projects 04/30/2021 04/29/2021
61.5 acres of vegetation maintained at 21 sites M: 198. Maintain Vegetation at Sites in Contract Years 2015 through 2019 04/20/2021 04/29/2021
1109.15 acres seeded with direct seeding systems N: 48. Reduce Sediment Delivery and Improve Hydrology 11/15/2020 10/28/2020
Install 1,450 lf of fence O: 40. Install New Fence at site 16-1430 Mission Creek Streambank 04/30/2021 04/29/2021
0.5 AC of Riparian Plantings P: 47. Plant riparian vegetation at site 16-1430/Mission Creek 04/15/2021 04/29/2021
1 AC of Plantings Q: 47. Site 17-1918 Rock Creek Floodplain - Plant vegetation- Phase 2 04/30/2021 04/29/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 48 Practice No-till and Conservation Tillage Systems
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 132 Produce annual progress reports for the contract period
C 165 Environmental Compliance
D 119 Management, Coordination, and Communication
E 191 Coordinate Lapwai Creek Watershed Activities
F 157 Stream Temperature Data Collection in the Lapwai Creek Watershed 06/25/2020
G 160 Maintain project database
H 99 Implement Lapwai Watershed outreach plan
I 114 Select, Prioritize, and Obtain Permission for 2021-2023 Projects
J 115 Complete Habitat Restoration Plans 05/01/2020
K 115 Lapwai Creek RM 10 Inventory/Analysis Project number 20-2175 05/01/2020
L 175 Prepare Engineering and Technical Designs for 2020/2021 Projects 05/01/2020
M 198 Maintain Vegetation at Sites in Contract Years 2015 through 2019 06/25/2020
N 48 Reduce Sediment Delivery and Improve Hydrology 05/01/2020
O 40 Install New Fence at site 16-1430 Mission Creek Streambank 04/09/2021
P 47 Plant riparian vegetation at site 16-1430/Mission Creek 04/09/2021
Q 47 Site 17-1918 Rock Creek Floodplain - Plant vegetation- Phase 2 09/01/2020