Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 86723: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION- LOSTINE M&E
Project Number:
Title:
Grande Ronde Supplementation Operations and Maintenance (O&M) and Monitoring and Evaluation (M&E) on Lostine River
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
86723
Contract Title:
1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION- LOSTINE M&E
Contract Continuation:
Previous: Next:
83821: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION M&E ON LOSTINE RIVER
  • 89446: 1998-007-02 EXP GRANDE RONDE SUPPLEMENTATION- LOSTINE M&E
Contract Status:
Closed
Contract Description:
This contract provides for monitoring and evaluation of the Nez Perce Tribe’s Chinook salmon supplementation program in the Lostine River as well as monitoring of Steelhead and Bull trout captured at the Lostine River weir. Monitoring and evaluation consists of data collection, data analysis, and communication of results. These activities are coordinated and accomplished cooperatively with fisheries co-managers of the Nez Perce Tribe. The scope of this contract includes monitoring and evaluation of Steelhead during the spring and an ongoing evaluation of Lostine River natural- and hatchery-origin Chinook salmon within the Wallowa/Lostine River spring Chinook population area.

Ongoing activities within this contract include: monitoring and evaluating the release of juvenile Lostine River hatchery-origin Chinook salmon; summarizing and reporting catch at the Lostine River weir; maintaining and validating a database of fish captured at the Lostine River weir; assisting co-managers with spawning ground surveys in northeast Oregon; PIT-tagging juvenile hatchery Chinook salmon; collecting and analyzing environmental data in the Lostine River. Data summaries and analyses are consistent with performance measures outlined in the Monitoring and Evaluation Plan for Northeast Oregon Hatcheries (Hesse et al. 2006). These performance measures describe juvenile and adult life history characteristics, distribution, abundance, productivity, and survival of natural- and hatchery-origin Chinook salmon. As a contract deliverable, these data are summarized and documented in an annual report.

Regionally, the program provides the Nez Perce Tribe with technical representation for management of the Lostine and Imnaha River Chinook salmon, including database development for the Lower Snake River Compensation Plan (FINS). Summary and analysis of data collected for this contract are also used in the Annual Operation Plan for the Lower Snake River Compensation Plan for Northeast Oregon. There will be no work, under this contract, on Coho salmon.
Account Type(s):
Expense
Contract Start Date:
01/01/2021
Contract End Date:
12/31/2021
Current Contract Value:
$494,892
Expenditures:
$494,892

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe Yes Technical Contact jayh@nezperce.org (208) 621-3552
Rebecca Johnson Nez Perce Tribe No Interested Party beckyj@nezperce.org (208) 621-4629
Kristen Jule Bonneville Power Administration Yes F&W Approver krjule@bpa.gov (503) 230-3588
Peter Lofy Bonneville Power Administration No Interested Party ptlofy@bpa.gov (503) 230-4193
Claire McClory Bonneville Power Administration Yes Env. Compliance Lead cdmcclory@bpa.gov (503) 230-5922
Eric McOmie Bonneville Power Administration Yes COR ermcomie@bpa.gov (503) 230-4964
Shane Vatland Nez Perce Tribe Yes Contract Manager shanev@nezperce.org (541) 432-2508
Jason Vogel Nez Perce Tribe Yes Supervisor jasonv@nezperce.org (208) 621-3602
Tish Whitman Nez Perce Tribe No Administrative Contact tishw@nezperce.org (208) 843-7320
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Rick Zollman Nez Perce Tribe No Interested Party rickz@nezperce.org (541) 432-2505


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Provide a Capture Summary of ESA Listed Species B: 165. Ensure Environmental Compliance Requirements Have Been Met 12/31/2021 12/20/2021
Final Calendar Year Annual Operation Plan for the Lower Snake River Compensation Program C: 191. LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins 12/31/2021 12/21/2021
Calendar Year 2020 Technical RM&E Report D: 132. Submit an Annual Report to BPA for CY 2020 10/15/2021
Produce accessible, error-checked datasets E: 157. Nez Perce Tribe Adult Weir Data Collection: Spring Chinook and Steelhead Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets F: 157. Nez Perce Tribe Spawning Ground Survey Data Collection: Spring Chinook NE Oregon 12/31/2021 12/21/2021
Produce accessible, error-checked datasets G: 157. Nez Perce Tribe Spawning Ground Survey Data Collection: Bull Trout NE Oregon 12/31/2021 12/21/2021
Produce accessible, error-checked datasets H: 157. Nez Perce Tribe In-Hatchery Data Collection : Spring Chinook Lookingglass Hatchery 12/31/2021 12/21/2021
Produce accessible, error-checked datasets I: 157. Nez Perce Tribe PIT Tag Array Operation: Wallowa/Lostine/Minam River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets J: 157. Nez Perce Tribe Stream Temperature Data Collection: Spring Chinook Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets K: 157. Nez Perce Tribe Stream Flow Data Collection: Spring Chinook Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata L: 157. Nez Perce Tribe Radio Telemetry Data Collection: Spring Chinook Lostine River 12/31/2021 12/21/2021
Mark and Tag Chinook with data on marks transferred to the data repository M: 158. Nez Perce Tribe Marking/Tagging: Juvenile Spring Chinook Lookingglass Hatchery 11/01/2021 10/29/2021
Produce accessible, error-checked datasets with metadata for reports N: 162. Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata for reports O: 162. Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata for reports P: 162. Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata for reports Q: 162. Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata for reports R: 162. Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata S: 162. Nez Perce Tribe Habitat Data Analysis: Spring Chinook Lostine River 12/31/2021 12/21/2021
Produce accessible, error-checked datasets with metadata T: 162. Nez Perce Tribe In-Hatchery Data Analysis: Spring Chinook Lookingglass Hatchery 12/31/2021 12/21/2021
Report life cycle modeling results pertinent to Lostine River Chinook supplementation U: 162. Life cycle modeling to evaluate Chinook Salmon supplementation 12/31/2021 12/21/2021
Complete Administrative Tasks V: 119. Manage and Administer the Project Contract 12/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 7 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 7 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 162 Analyze/Interpret Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Ensure Environmental Compliance Requirements Have Been Met
C 191 LSRCP AOP Meetings for the Grande Ronde and Imnaha River Subbasins
D 132 Submit an Annual Report to BPA for CY 2020
E 157 Nez Perce Tribe Adult Weir Data Collection: Spring Chinook and Steelhead Lostine River 11/02/2020
F 157 Nez Perce Tribe Spawning Ground Survey Data Collection: Spring Chinook NE Oregon 11/02/2020
G 157 Nez Perce Tribe Spawning Ground Survey Data Collection: Bull Trout NE Oregon 11/02/2020
H 157 Nez Perce Tribe In-Hatchery Data Collection : Spring Chinook Lookingglass Hatchery 11/02/2020
I 157 Nez Perce Tribe PIT Tag Array Operation: Wallowa/Lostine/Minam River 11/02/2020
J 157 Nez Perce Tribe Stream Temperature Data Collection: Spring Chinook Lostine River 11/02/2020
K 157 Nez Perce Tribe Stream Flow Data Collection: Spring Chinook Lostine River 11/02/2020
L 157 Nez Perce Tribe Radio Telemetry Data Collection: Spring Chinook Lostine River 06/23/2021
M 158 Nez Perce Tribe Marking/Tagging: Juvenile Spring Chinook Lookingglass Hatchery 11/02/2020
N 162 Nez Perce Tribe Distribution Data Analysis: Spring Chinook Lostine River
O 162 Nez Perce Tribe Adult Abundance and Life History Data Analysis: Spring Chinook Lostine River
P 162 Nez Perce Tribe Adult Abundance and Life History Data Analysis: Steelhead Lostine River
Q 162 Nez Perce Tribe Juvenile Abundance and Life History Data Analysis: Spring Chinook Lostine Rive
R 162 Nez Perce Tribe Survival and Productivity Data Analysis: Spring Chinook Lostine River
S 162 Nez Perce Tribe Habitat Data Analysis: Spring Chinook Lostine River
T 162 Nez Perce Tribe In-Hatchery Data Analysis: Spring Chinook Lookingglass Hatchery
U 162 Life cycle modeling to evaluate Chinook Salmon supplementation
V 119 Manage and Administer the Project Contract
W 202 BiOp RPA Report for CY 2020