Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 91122: 1988-053-03 EXP HOOD RIVER PRODUCTION M&E - CTWS
Project Number:
Title:
Hood River Production Program Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
91122
Contract Title:
1988-053-03 EXP HOOD RIVER PRODUCTION M&E - CTWS
Contract Continuation:
Previous: Next:
88909: 1988-053-03 EXP HOOD RIVER PRODUCTION M&E - CTWS
  • 93499: 1988-053-03 EXP HOOD RIVER PRODUCTION M&E - CTWS FY24
Contract Status:
Issued
Contract Description:
Project Leader: Ryan Gerstenberger (541) 352-9326
Fiscal Officer: El Freda Gentry (541) 553-3375
Fisheries Program Manager:  Brad Houslet (541) 553-2014
Address: 6030 Dee Highway, Parkdale, OR 97041

Fiscal Year 2023 contract tasks include:
-Estimate run year 2023 adult spring Chinook and hatchery winter steelhead returns.
-Develop spring Chinook harvest recommendation.
-Monitor and estimate 2023 tribal harvest at Punchbowl Falls.
-Capture juvenile salmonids at downstream migrant traps and generate smolt population estimates.
-Determine BY 21 hatchery Chinook smolt out migration timing.
-Document run year 2023 spring Chinook spawning locations, timing and success.
-Measure river flows and water temperatures throughout the Hood River basin.
-Reconstruct run year 2022 harvest and escapement.
-Assisting Parkdale Fish Hatchery staff with various fish culture activities including implementing natural feeding program.
-Install, maintain and operate PIT receivers in the basin.
-Report fiscal and calendar year 2022 findings to BPA.

During FY 23 NOAA will contract with BPA using funds from this project to:
1. Analyze data for the Deschutes/Hood Comparative hatchery study.
2. Work on producing completion report of project findings over the course of the study and prepare scientific manuscript(s) if appropriate.
Account Type(s):
Expense
Contract Start Date:
10/01/2022
Contract End Date:
09/30/2023
Current Contract Value:
$413,514
Expenditures:
$105,163

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Relevant documents/permits submitted to BPA for environmental compliance review. B: 165. Ensure environmental compliance is adequate 09/30/2023 03/30/2023
Effective implementation management and timely contract administration C: 119. Manage BPA Project 09/30/2023
Approximately 25,260 PIT tagged spring Chinook salmon. D: 158. PIT tag hatchery spring Chinook salmon 09/30/2023
Operate and maintain PIT antennae at 4 sites in the Hood River basin. E: 157. Install and operate PIT antennae 09/30/2023
Submit HRPP implanted PIT tag codes to PTAGIS database. F: 159. Input Hood River PIT tag data to appropriate databases 09/30/2023
Monitor water temperatures in the Hood River subbasin G: 157. Collect water temperature data in the Hood River subbasin 09/30/2023
Record water flows in Rogers, Neal, Odell Creeks and Dog River. H: 157. Record stream flows in the Hood River basin. 09/30/2023
Forecast adult spring Chinook salmon returns to the mouth of the Hood River. I: 157. Update run forecast models and generate spring Chinook salmon preseason adult run size estimate for upcoming run year 09/30/2023
Estimate tribal harvest of spring Chinook salmon in the Hood River. J: 157. Spring Chinook salmon tribal harvest monitoring 09/30/2023
2022-2023 Hood River Basin spring Chinook salmon redd enumeration and spawning distribution. K: 157. Spring Chinook spawning surveys 09/30/2023
Develop study design for eDNA based fish distribution monitoring L: 156. Develop study design and methodology for eDNA sampling to monitor fish distribution 09/30/2023
Capture and tag juvenile steelhead and Chinook to generate estimates of smolts emigrating from the Hood River watershed. M: 157. Hood River subbasin juvenile and smolt abundance monitoring 09/30/2023
Provided data and analysis from genetic samples to facilitate Chinook and steelhead population monitoring in the Hood River N: 157. Genetic based population monitoring of natural produced steelhead and spring Chinook in the Hood River 09/30/2023
Fish abundance estimates for steelhead and spring Chinook stocks at the smolt and adult life stages. Updated population modeling and analysis tools. O: 162. Perform data analysis and modeling to determine salmon and steelhead population abundance and productivity 09/30/2023
Completed Annual Report P: 132. Produce RM&E Annual Report for 1/1/2022 - 12/31/2022 03/31/2023 03/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 7 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Ensure environmental compliance is adequate
C 119 Manage BPA Project
D 158 PIT tag hatchery spring Chinook salmon 09/12/2022
E 157 Install and operate PIT antennae 09/12/2022
F 159 Input Hood River PIT tag data to appropriate databases
G 157 Collect water temperature data in the Hood River subbasin 09/12/2022
H 157 Record stream flows in the Hood River basin. 09/12/2022
I 157 Update run forecast models and generate spring Chinook salmon preseason adult run size estimate for upcoming run year 09/12/2022
J 157 Spring Chinook salmon tribal harvest monitoring 09/12/2022
K 157 Spring Chinook spawning surveys 09/12/2022
L 156 Develop study design and methodology for eDNA sampling to monitor fish distribution 09/12/2022
M 157 Hood River subbasin juvenile and smolt abundance monitoring 09/12/2022
N 157 Genetic based population monitoring of natural produced steelhead and spring Chinook in the Hood River 09/12/2022
O 162 Perform data analysis and modeling to determine salmon and steelhead population abundance and productivity
P 132 Produce RM&E Annual Report for 1/1/2022 - 12/31/2022