Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 94120: 1996-040-00 EXP UC COHO & UC KELT REARING + FISH HEALTH
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
94120
Contract Title:
1996-040-00 EXP UC COHO & UC KELT REARING + FISH HEALTH
Contract Continuation:
Previous: Next:
91922: 1996-040-00 EXP UC COHO & UC KELT REARING + FISH HEALTH
Contract Status:
Issued
Contract Description:
Coho Rearing:

The activities in this contract are outlined in the Master Yakama Nation project under Operation and Maintenance objectives and tasks and identified as BPA direct fund work. The long term vision of the larger restoration project is to restore coho salmon to the Wenatchee and Methow river basins at biologically sustainable levels that will support harvest in most years. The project works toward development of locally adapted, naturally spawning coho populations in the Wenatchee and Methow subbasins by increasing the fitness of reintroduced coho salmon by reducing domestication and emphasizing local adaptation.

Hatchery smolt production work is covered under BPA contracts supporting the Yakama Nation's coho reintroduction efforts through egg incubation and juvenile rearing of full-term coho at the Willard NFH and Winthrop NFH while also providing holding, spawning, incubation and acclimation space at the Leavenworth NFH and the Winthrop NFH.  Work also includes fish health laboratory services provided by the Lower Columbia River and the Olympia Fish Health Centers for monitoring adult and juvenile coho salmon health.  The Statement of Work included within this contract represents activities for the 12-month period February 1 thru January 31.

Steelhead Kelt Reconditioning:

Additionally, for the Yakama Nation Steelhead Kelt Reconditioning Project, the U.S. Fish and Wildlife Service’s Winthrop National Fish Hatchery will perform tasks associated with the operations and maintenance of the Methow Steelhead Kelt Facility (MSKF).  The operations will take place at the Winthrop National Fish Hatchery during the time period of February 1st through January 31st.  The Service will: 1) Remove snow from the access road to the kelt reconditioning facility, 2) maintain the lawn and grounds, 3) ensure continuity of fish production water to the facility, 4) provide first response to all low water alarms, 5) conduct minor facility repair and maintenance, and 6) coordinate with the YN regarding facility operations which may affect either parties programs.
The U.S. Fish and Wildlife Service’s Winthrop National Fish Hatchery will manage necessary permits and/or requirements to operate and maintain the MSKF as a part of the Winthrop National Fish Hatchery.  The tasks will include: 1)  acquire and maintain an NPDES permit for the Winthrop NFH, 2) Assist the YN personnel in developing adequate safety plans for the facility that meet Service requirements, 3) Assist YN personnel in developing adequate Hazard Analysis and Critical Control Point (HACCP) plans for the facility that meet Service requirements.
Account Type(s):
Expense
Contract Start Date:
02/01/2024
Contract End Date:
01/31/2025
Current Contract Value:
$1,129,461
Expenditures:
$146,056

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Iaa
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Michael Clark US Fish and Wildlife Service (USFWS) No Administrative Contact michael_l_clark@fws.gov (509) 493-1730
Andrew Goodwin US Fish and Wildlife Service (USFWS) No Supervisor andrew_goodwin@fws.gov (503) 231-6784
Cory Kamphaus Yakama Confederated Tribes No Interested Party kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Kenneth Lujan US Fish and Wildlife Service (USFWS) Yes Contract Manager kenneth_lujan@fws.gov (509) 637-4862
Mathew Maxey US Fish and Wildlife Service (USFWS) Yes Interested Party mathew_maxey@fws.gov (509) 548-2917
Eric McOmie Bonneville Power Administration Yes COR ermcomie@bpa.gov (503) 230-4964
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Lori Orr US Fish and Wildlife Service (USFWS) Yes Administrative Contact lori_orr@fws.gov (509) 493-1730
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Sara Reese US Fish and Wildlife Service (USFWS) Yes Administrative Contact sara_reese@fws.gov (509) 996-2424
Shawn Skinner Bonneville Power Administration No Env. Compliance Lead srskinner@bpa.gov (503) 230-3727
Gregory Wolfe Yakama Confederated Tribes No Interested Party wolg@yakamafish-nsn.gov (509) 881-0674


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA B: 165. Work with BPA NEPA Group for EC Review 02/01/2024 02/01/2024
The production goal for this program is 700,000 healthy pre-smolts for transfer to upper river locations. C: 176. Willard NFH Coho BY2022 Production Activities 04/17/2024
The production goal for this program is 700,000 healthy pre-smolts for transfer to upriver locations. D: 176. Willard NFH Coho BY2023 Production Activities 01/31/2025
The production goal for this program is 700,000 healthy pre-smolts for transfer to upriver locations. E: 176. Willard NFH Coho BY2024 Production Activities 01/31/2025
Willard NFH Fish Health Activities F: 60. Willard NFH Coho Fish Health Activities 01/31/2025
Transport approximately 170,000 coho and spring Chinook salmon smolts to locations in the Methow drainage. G: 66. Winthrop NFH Fish Transport Activities 04/30/2024
Willard NFH BY2022-2024 Maintenance and contract services. H: 61. Willard, Winthrop NFH Coho Maintenance & Contract Services 01/31/2025
Winthrop NFH BY2022 Production Activities I: 176. Winthrop NFH Coho BY2022 Production Activities 04/30/2024
Winthrop NFH BY2023 Production Activities J: 176. Winthrop NFH Coho BY2023 Production Activities 01/31/2025
Winthrop NFH BY2024 Production Activities K: 176. Winthrop NFH Coho BY2024 Production Activities 01/31/2025
Winthrop NFH Fish Health Activities L: 60. Winthrop NFH Coho Fish Health Activities 01/31/2025
Leavenworth NFH holding, spawning, incubating, and maintenance activities M: 61. Leavenworth NFH holding, spawning, incubation and juvenile rearing space maintenance activities 01/31/2025
Leavenworth NFH Fish Health Activities N: 60. Leavenworth NFH Fish Health Activities 01/31/2025
Completed Annual Report O: 132. CY 2024 Annual Report for US Fish & Wildlife Service Coho Rearing 01/31/2025
Effective implementation management and timely contract administration P: 119. Manage and Administer FY2024/25 Projects at Willard, Leavenworth & Winthrop NFH, and the Pacific Region Fish Health Program 01/31/2025
Kelts for reconditioning project Q: 66. Steelhead Broodstock Collection and Live Spawning 06/30/2024
Reconditioned kelts R: 176. Steelhead Kelt Reconditioning 01/31/2025
Functional Kelt Facility S: 61. Methow Steelhead Kelt Facility (MSKF) Operation 01/31/2025

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
Coho (O. kisutch) - Unspecified Population
  • 6 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 3 instances of WE 60 Maintain Fish Health
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Work with BPA NEPA Group for EC Review
C 176 Willard NFH Coho BY2022 Production Activities 10/25/2023
D 176 Willard NFH Coho BY2023 Production Activities 10/25/2023
E 176 Willard NFH Coho BY2024 Production Activities 10/25/2023
F 60 Willard NFH Coho Fish Health Activities 10/25/2023
G 66 Winthrop NFH Fish Transport Activities 10/25/2023
H 61 Willard, Winthrop NFH Coho Maintenance & Contract Services 10/25/2023
I 176 Winthrop NFH Coho BY2022 Production Activities 10/25/2023
J 176 Winthrop NFH Coho BY2023 Production Activities 10/25/2023
K 176 Winthrop NFH Coho BY2024 Production Activities 10/25/2023
L 60 Winthrop NFH Coho Fish Health Activities 10/25/2023
M 61 Leavenworth NFH holding, spawning, incubation and juvenile rearing space maintenance activities 10/25/2023
N 60 Leavenworth NFH Fish Health Activities 10/25/2023
O 132 CY 2024 Annual Report for US Fish & Wildlife Service Coho Rearing
P 119 Manage and Administer FY2024/25 Projects at Willard, Leavenworth & Winthrop NFH, and the Pacific Region Fish Health Program
Q 66 Steelhead Broodstock Collection and Live Spawning 10/25/2023
R 176 Steelhead Kelt Reconditioning 10/25/2023
S 61 Methow Steelhead Kelt Facility (MSKF) Operation 10/25/2023