Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 67: 2010-030-00 EXP YN PROJECT TO PROVIDE VSP ESTIMATE
Project Number:
Title:
Yakima Steelhead VSP Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 67
Contract Title:
2010-030-00 EXP YN PROJECT TO PROVIDE VSP ESTIMATE
Contract Continuation:
Previous: Next:
56662 REL 46: 2010-030-00 EXP YN PROJECT TO PROVIDE VSP ESTIMATE
  • 56662 REL 87: 2010-030-00 EXP YN PROJECT TO PROVIDE VSP ESTIMATE
Contract Status:
Closed
Contract Description:
This project expands RM & E activities conducted by the co-managers in the Yakima Basin (Yakama Nation and Washington Department of Fish and Wildlife) to better evaluate VSP parameters (abundance, productivity, spatial structure, and diversity) for Yakima steelhead populations.  It was developed to fill critical monitoring gaps identified in the 2009 Columbia Basin monitoring strategy review and the FCRPS Biological Opinion RPA review. This proposal builds upon the infrastructure and monitoring capacities of the YKFP umbrella M&E project (199506325).  Data from this project will be used to evaluate population status and trends, inform NOAA status reviews and implementation of the FCRPS Biological Opinion, and address critical uncertainties (e.g., the relationship between resident and anadromous life histories in the Upper Yakima and Naches populations), consistent with the NPCC Fish and Wildlife program, Columbia Basin research plan (uncertainties 3.1, 7.1 & 7.3), NOAA mid-Columbia steelhead recovery plan, and Fish Accords.  The improved understanding of steelhead population performance produced by this project will provide long term Status and trends monitoring data for the Yakima River Steelhead MPG populations, and directly inform efforts to recover steelhead populations in the Yakima Basin.

Specific activities include:

1.  Maintaining biological and DNA sampling at Prosser adult monitoring facility (Abundance, Productivity),

2.  PIT tagging of Juvenile O.mykiss in Naches River, and adults at Prosser Dam (Abundance, Productivity, Spatial Structure),

3.  Analysis of data collected for 3 year telemetry study.  This will include generating independent adult spawner escapement estimates for individual populations using telemetry data, PIT-tag detection data from instream arrays, and GSI assignments. A final comparison between the 3 methods will be evaluated. Other data to be analyzed includes the fate of all radio tagged fish, and life history characteristics of individual populations (run timing, adult holding, prespawn survival, spawn timing, kelt rates and respective outmigrant survival).  Analysis of age data for Cohort analysis (adult productiivity) based on spawning locations of radio tracked fish.  Age data will be evaluated for the Yakima MPG as a whole and for individual populations

4. Installation and maintenance of PIT-tag detection antennas.  Using the telemetry data, the project has identified the last of key locations needed for long term status and trends monitoring (spawning escapement for individual populations). These include Sunnyside Dam, and Marion Drain (both will use cost effective allflex antennas and reader boards).  The project will also conduct routine maintenance on all Yakima River Instream PIT-tag detection arrays funded by this project.

5.  Naches River- Compilation of PIT- tagging effort, detection history, rearing patterns, and life stage specific survival estimates (outmigrant survival, Smolt-to-adult return rates).

6.  Evaluate interactions in the upper Yakima and Naches between resident rainbow and steelhead trout (Diversity, Productivity).
This project addresses reasonable and prudent alternatives (RPAs) 50.6 and 62.5 in the FCRPS biological opinion.
Account Type(s):
Expense
Contract Start Date:
10/15/2014
Contract End Date:
10/14/2015
Current Contract Value:
$282,570
Expenditures:
$282,570

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dave Fast Yakama Confederated Tribes No Supervisor fast@yakama.com (509) 966-5291
Joanne Fernandez Yakama Confederated Tribes Yes Administrative Contact joannef@yakama.com (509) 865-5121x6337
Sandra Fife Bonneville Power Administration Yes COR safife@bpa.gov (503) 230-3678
Chris Frederiksen Yakama Confederated Tribes Yes Contract Manager chrisf@yakama.com (509) 966-5156
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jennifer Lord Bonneville Power Administration Yes Env. Compliance Lead jklord@bpa.gov (503) 230-5192
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Andrew Murdoch Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact andrew.murdoch@dfw.wa.gov (509) 664-3148x15
Gabriel Temple Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact gabriel.temple@dfw.wa.gov (509) 925-4467
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
2014 BiOp RM&E report uploaded in Taurus A: 202. 2014 BiOp RM&E report uploaded in Taurus 03/15/2015 03/15/2015
PIT-tag adult migrating steelhead at Prosser Dam Denil trap across entire run-timing B: 158. Insert PIT-tags into adult steelhead 05/08/2015 05/08/2015
Attach Progress Report in Pisces C: 132. Submit Progress Report for the period 10/15/2013 through 10/14/2014 03/15/2015 03/15/2015
Analyze, interpret and report on 3 year telemetry study D: 162. Analyze 3 year radio telemetry data 08/31/2015 08/31/2015
Evaluate rearing patterns and Smolt-to-adult return rates E: 162. Synthesize and evaluate Naches juvenile PIT-tag data 07/31/2015 07/31/2015
EC documents obtained for this contract F: 165. Provide EC documentation to BPA 10/01/2015 10/01/2015
All administrative tasks fulfilled with timely quality products G: 119. Manage and administer project 10/14/2015 10/14/2015
PIT-tag juvenile steelhead in the Naches and its tributaries H: 158. PIT-tag juvenile steelhead 10/14/2015 10/14/2015
Collect biological data for estimating productivity and diversity VSP metrics I: 157. Collect biological data on migrating adult steelhead 05/08/2015 05/08/2015
Install and Maintain Yakima River Remote Instream PIT-Tag detection Arrays J: 70. Install PIT-arrays, conduct routine servicing and maintenance of PIT-arrays 10/14/2015 10/14/2015
Generate and compare Yakima Steelhead populations estimates between independent methods K: 162. Generate and compare Steelhead population estimates between independent methods 10/14/2015 10/14/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 3 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 202 2014 BiOp RM&E report uploaded in Taurus
B 158 Insert PIT-tags into adult steelhead 10/15/2014
C 132 Submit Progress Report for the period 10/15/2013 through 10/14/2014 10/15/2014
D 162 Analyze 3 year radio telemetry data 10/15/2014
E 162 Synthesize and evaluate Naches juvenile PIT-tag data 10/15/2014
F 165 Provide EC documentation to BPA 10/15/2014
G 119 Manage and administer project 10/15/2014
H 158 PIT-tag juvenile steelhead 10/15/2014
I 157 Collect biological data on migrating adult steelhead 10/15/2014
J 70 Install PIT-arrays, conduct routine servicing and maintenance of PIT-arrays 10/15/2014
K 162 Generate and compare Steelhead population estimates between independent methods 10/15/2014
L 185 Periodic Status Reports for BPA 10/15/2014