Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 75750: 2010-072-00 EXP LEMHI RIVER RESTORATION
Project Number:
Title:
Upper Salmon Basin Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
75750
Contract Title:
2010-072-00 EXP LEMHI RIVER RESTORATION
Contract Continuation:
Previous: Next:
71307: 2010-072-00 EXP LEMHI RIVER RESTORATION
Contract Status:
Closed
Contract Description:
The Lemhi River Restoration Project (2010-072-00) seeks to implement habitat actions  to protect in-stream and riparian habitat, improve stream flow in the Lemhi River, and assist in reconnecting tributary streams to the Lemhi River to benefit all life stages of Snake River spring/summer-run Chinook and Snake River steelhead.

This contract covers calendar year 2017 actions by Idaho Department of Fish and Game (IDFG), Lemhi Soil and Water Conservation District (Lemhi SWCD), Lemhi Regional Land Trust (LRLT), Trout Unlimited, and Rocky Mountain Research Station, in cooperation with University of Idaho.
Account Type(s):
Expense
Contract Start Date:
01/01/2017
Contract End Date:
02/28/2018
Current Contract Value:
$2,102,219
Expenditures:
$2,102,219

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc No Interested Party chris@qcinc.org (360) 620-2883
Daniel Bertram Idaho Governor's Office of Species Conservation Yes Technical Contact daniel.bertram@osc.idaho.gov (208) 756-6322
Allen Bradbury Idaho Governor's Office of Species Conservation Yes Technical Contact allen.bradbury@osc.idaho.gov (208) 756-6322
Jessica Buelow Idaho Department of Fish and Game (IDFG) Yes Technical Contact jessica.buelow@idfg.idaho.gov (208) 756-2271
Art Butts Idaho Department of Fish and Game (IDFG) Yes Technical Contact art.butts@idfg.idaho.gov (208) 287-2798
Sharon Clark Idaho Department of Fish and Game (IDFG) Yes Technical Contact sharon.clark@idfg.idaho.gov (208) 287-2784
Becky Coffey Lemhi Soil and Water Conservation District (SWCD) No Technical Contact lswcd@hotmail.com (208) 756-3211x101
Jeffrey DiLuccia Idaho Department of Fish and Game (IDFG) Yes Technical Contact jeff.diluccia@idfg.idaho.gov (208) 756-2271
Hannah Dondy-Kaplan Bonneville Power Administration Yes COR hadondy-kaplan@bpa.gov (503) 230-4071
Mike Edmondson Idaho Governor's Office of Species Conservation No Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Abbie Gongloff Idaho Governor's Office of Species Conservation Yes Technical Contact abbie.gongloff@osc.idaho.gov (208) 756-6322
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
Paul Kline Idaho Department of Fish and Game (IDFG) Yes Technical Contact paul.kline@idfg.idaho.gov (208) 287-2788
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Stacey Meyer Idaho Department of Fish and Game (IDFG) Yes Technical Contact stacey.meyer@idfg.idaho.gov (208) 756-6022
Bob Minton Lemhi Soil and Water Conservation District (SWCD) No Technical Contact bobminton@hotmail.com (208) 756-4262
Adair Muth Idaho Governor's Office of Species Conservation Yes Technical Contact adair.muth@osc.idaho.gov (208) 756-6322
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
All administrative tasks fulfilled with timely quality products A: 119. Manage and Administer Project 02/28/2018 02/28/2018
Complete all required EC and obtain permits prior to implementation of project B: 165. Produce Environmental Compliance Documentation 12/31/2017 12/29/2017
Completed Annual Report D: 132. Submit Progress Report for the period (Jan 2016) to (Dec 2016) 04/30/2017 04/27/2017
Furnish and install a closed irrigation system. E: 203. LSWCD: Middle Pratt Creek Access Improvement Project (Snook) 02/28/2018 09/23/2017
Relocate irrigation system intake to a new fish screen and improve irrigation. F: 203. LSWCD: Eighteenmile Creek Restoration Beyeler 11/30/2017 12/21/2017
Furnish irrigation pipeline and appurtenances. G: 203. LSWCD: Upper Pratt Creek Access and Flow Enhancement Project (Moulton) 02/28/2018 12/01/2017
Final engineering designs for Pratt Creek culvert on Lemhi County Back Road H: 175. LSWCD: Pratt Creek County Road Bridge- final design 02/28/2018 01/22/2018
Manage vegetation through noxious weed treatments I: 199. LSWCD: Lemhi Vegetation Management: Noxious Weed Treatments 11/30/2017 10/27/2017
Rehabilitate project sites through hydroseeding J: 47. LSWCD: Lemhi Vegetation Managment: Rehabilitate Project Sites 06/15/2017 04/27/2017
Produce draft engineering designs for the Middle Eighteenmile Creek Habitat Improvement Project K: 175. LSWCD: Middle Eighteenmile Creek Habitat Improvement Project Breshears- draft design 12/31/2017 08/30/2017
Furnish large woody debris for construction of woody debris habitat structures L: 29. TU: Wimpey Creek (Skinner) Restoration Project: Furnish LWD 02/28/2018 02/28/2018
Construction Management Complete M: 100. TU: Wimpey Creek (Skinner) Restoration Project: Construction management 02/28/2018 02/28/2018
Draft engineering designs for restoration/relocation of lower Pratt Creek N: 175. TU: Pratt Creek Channel Restoration: draft design 02/28/2018 12/12/2017
Final engineering designs for creek restoration on Little Sawmill Creek. O: 175. TU: Little Sawmill Creek Restoration Project: final design 02/28/2018 02/08/2018
Draft engineering designs for creek restoration on Haynes Creek. P: 175. TU: Haynes Creek Restoration Design: draft design 02/28/2018 01/16/2018
Install small woody debris structures instream. Q: 47. TU: Little Springs Revegetation Project 02/28/2018 02/28/2018
Data analysis complete R: 162. RMRS: Lemhi Hydrologic Modeling Using LiDAR Data 2017 12/31/2017 12/29/2017
Survey of Lower part of the Lemhi River S: 157. RMRS: Lemhi Hydrologic Modeling - Data Collection on Lower part of the Lemhi River 12/31/2017 12/29/2017
All administrative tasks fulfilled with timely quality products T: 119. IDFG: Lemhi Basin Habitat Improvement Manage & Administer 02/28/2018 02/28/2018
Bohannon Creek Diversion #3 Final Design - Stokes Segment U: 175. IDFG: Final Design for Bohannon Creek Diversion #3 Removal - Stokes Segment 02/28/2018
Construction Management Complete V: 100. IDFG: Bohannon Cr #3 Diversion Construction Oversight - Stokes Segment 02/28/2018
Final design Bohannon Creek 12 and 13 Diversion Consolidation W: 175. IDFG: Bohannon Cr 12/13 Diversion Consolidation Design 02/28/2018
Lateral habitat development X: 35. IDFG: Amonson Pond Habitat Development - Upper Little Springs Creek 10/31/2017
Highway 29 Culvert Replacement Final Design Y: 175. IDFG: Final Design for Highway 29 Culvert Replacement Project 02/28/2018
Revegetated Lower Lemhi Rehabilitation Project Sites AA: 47. IDFG: Revegetate Eagle Valley Subreach 3 02/28/2018
Construction Management Complete AB: 100. IDFG: Provide Construction oversight and management of Eagle Valley Subreach 3 02/28/2018
Large Woody Structures Installed in Subreach #3 AC: 29. IDFG: Install Large Woody Structures in Eagle Valley Subreach 3 02/28/2018
Completed channel construction AD: 30. IDFG: Construct side channel in Eagle Valley Subreach 3 02/28/2018
Produce Plan AE: 174. LRLT - Big Timber 2 Produce Plan - Modeling of Project and Tech Team Presentations 02/28/2018 11/30/2017
Final design for Big Timber 2 and L63 AF: 175. LRLT - Big Timber 2 Diversion Removal Suite: final engineering 02/01/2018 10/30/2017
Remove Big Timber 2 diversion AG: 84. LRLT - Big Timber 2 Diversion Removal Suite: diversion removal 02/28/2018
Install pump, pipeline and pod system AH: 84. LRLT - Big Timber 2 Diversion Removal Suite: alternate irrigation method 02/28/2018
Use LWD to create aquatic complexity in Big Timber Creek AI: 29. LRLT - Big Timber 2 Diversion Removal Suite: install LWD 02/28/2018
Purchase and install plants for bank rehabilitation, and seeding AJ: 47. LRLT - Big Timber 2 Diversion Removal Suite: planting 02/28/2018
Install stockwater system AK: 34. LRLT - Big Timber 2 Diversion Removal Suite: stockwater 02/28/2018
Final design for Big Springs Restoration AL: 175. LRLT - Big Springs Restoration: final engineering 12/31/2017 10/30/2017
Construct new channel sections, point bars, and islands on Big Springs AM: 30. LRLT - Big Springs Restoration: create channel 11/30/2017 11/30/2017
installation of structures to create and promote aquatic and floodplain complexity AN: 29. LRLT - Big Springs Restoration: instream, bank, and floodplain complexity 11/30/2017 11/30/2017
Purchase and install plants, sodmats, seed AO: 47. LRLT - Big Springs Restoration: planting 11/30/2017 11/30/2017
Install fence AP: 40. LRLT - Big Springs Restoration: fence 02/28/2018 02/28/2018
Final design for Lemhi Fayle Restoration AQ: 175. LRLT- Lemhi Fayle Restoration: final engineering 06/30/2017 05/31/2017
Construct new channel sections, point bars, and islands on the Lemhi River. AR: 30. LRLT- Lemhi Fayle Restoration: create channel 11/30/2017 08/25/2017
installation of structures to create and promote aquatic and floodplain complexity AS: 29. LRLT- Lemhi Fayle Restoration: instream, bank, and floodplain complexity 11/30/2017 08/25/2017
Purchase and installation of plants, sedge mats, and seeding. AT: 47. LRLT - Lemhi Fayle Restoration: planting 11/30/2017 09/15/2017
Install fence AU: 40. LRLT - Lemhi Fayle Restoration: fence 02/28/2018 02/28/2018
Install bridge on Sandy Creek AV: 184. LSWCD: Sandy Creek Culvert Replacement: Bridge installation 11/15/2017 06/27/2017
Install stockwater system AW: 34. LSWCD - Sandy Creek Stockwater 10/31/2017 09/28/2017
Operate and maintain Lemhi River adult weir AX: 157. IDFG: Monitoring-Install, operate, and maintain Lemhi River weir 02/28/2018 08/31/2017
Juvenile survey data AY: 157. IDFG: Monitoring-Collect and sample juvenile salmonids in Lemhi River watershed 02/28/2018 11/30/2017
Chinook salmon tagging records from Lemhi River weir and remote surveys AZ: 158. IDFG: Monitoring-Tag Chinook salmon captured at Lemhi River weir and remote surveys 02/28/2018 11/30/2017
Steelhead tagging records at Lemhi River weir and remote surveys BA: 158. IDFG: Monitoring-Tag steelhead captured at Lemhi River weir and remote surveys 02/28/2018 11/30/2017
Bull Trout tagging records from Lemhi River weir and remote surveys BB: 158. IDFG: Monitoring-Tag Bull Trout captured at Lemhi River weir and remote surveys 02/28/2018 11/30/2017
Westslope Cutthroat Trout tagging records at Lemhi River weir and remote surveys BC: 158. IDFG: Monitoring-Tag Westslope Cutthroat Trout captured at Lemhi River weir and remote surveys 02/28/2018 11/30/2017
Oncorhynchus mykiss tagging records from Lemhi River weir and remote surveys BD: 158. IDFG: Monitoring-Tag Oncorhynchus mykiss captured at Lemhi River weir and remote surveys 02/28/2018 11/30/2017
Purchase plants BE: 47. LSWCD: Purchase plants for 2018 planting 02/28/2018 02/26/2018
Completed channel construction BF: 30. LSWCD: Eighteenmile Creek Restoration Beyeler - Channel Reconstruction 02/28/2018 01/26/2018
Install 1,000 feet of electric fence BG: 40. LSWCD: Eighteenmile Creek Restoration Beyeler- install fence 02/28/2018 01/26/2018
Purchase of irrigation infrastructure BH: 203. LSWCD: Little Sawmill Creek Irrigation Enhancement: Irrigation purchase 02/28/2018 02/28/2018
15% draft design for Big Springs Restoration BI: 175. LRLT - Big Springs Restoration: draft engineering, Phase 2 02/28/2018 02/28/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 4 instances of WE 203 Install Water Conservation Measure
  • 1 instance of WE 199 Remove Vegetation
  • 5 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 4 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 34 Develop Alternative Water Source
  • 1 instance of WE 35 Develop Pond
  • 3 instances of WE 40 Install Fence
  • 7 instances of WE 47 Plant Vegetation
  • 2 instances of WE 84 Remove/Install Diversion
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 174 Produce Plan
  • 12 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
  • 4 instances of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 4 instances of WE 203 Install Water Conservation Measure
  • 1 instance of WE 199 Remove Vegetation
  • 5 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 4 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 34 Develop Alternative Water Source
  • 1 instance of WE 35 Develop Pond
  • 3 instances of WE 40 Install Fence
  • 7 instances of WE 47 Plant Vegetation
  • 2 instances of WE 84 Remove/Install Diversion
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 174 Produce Plan
  • 12 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 5 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
  • 4 instances of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Project 01/01/2017
B 165 Produce Environmental Compliance Documentation 01/01/2017
C 185 Periodic Status Reports for BPA 01/01/2017
D 132 Submit Progress Report for the period (Jan 2016) to (Dec 2016) 01/01/2017
E 203 LSWCD: Middle Pratt Creek Access Improvement Project (Snook) 07/17/2017
F 203 LSWCD: Eighteenmile Creek Restoration Beyeler 09/22/2017
G 203 LSWCD: Upper Pratt Creek Access and Flow Enhancement Project (Moulton) 09/07/2017
H 175 LSWCD: Pratt Creek County Road Bridge- final design 03/03/2017
I 199 LSWCD: Lemhi Vegetation Management: Noxious Weed Treatments 05/02/2017
J 47 LSWCD: Lemhi Vegetation Managment: Rehabilitate Project Sites 05/02/2017
K 175 LSWCD: Middle Eighteenmile Creek Habitat Improvement Project Breshears- draft design 04/28/2017
L 29 TU: Wimpey Creek (Skinner) Restoration Project: Furnish LWD 02/23/2017
M 100 TU: Wimpey Creek (Skinner) Restoration Project: Construction management 01/01/2017
N 175 TU: Pratt Creek Channel Restoration: draft design 02/27/2017
O 175 TU: Little Sawmill Creek Restoration Project: final design 05/26/2017
P 175 TU: Haynes Creek Restoration Design: draft design 02/27/2017
Q 47 TU: Little Springs Revegetation Project 05/02/2017
R 162 RMRS: Lemhi Hydrologic Modeling Using LiDAR Data 2017 01/01/2017
S 157 RMRS: Lemhi Hydrologic Modeling - Data Collection on Lower part of the Lemhi River 05/26/2017
T 119 IDFG: Lemhi Basin Habitat Improvement Manage & Administer 01/01/2017
U 175 IDFG: Final Design for Bohannon Creek Diversion #3 Removal - Stokes Segment 09/21/2017
V 100 IDFG: Bohannon Cr #3 Diversion Construction Oversight - Stokes Segment 01/01/2017
W 175 IDFG: Bohannon Cr 12/13 Diversion Consolidation Design 05/26/2017
X 35 IDFG: Amonson Pond Habitat Development - Upper Little Springs Creek 06/20/2017
Y 175 IDFG: Final Design for Highway 29 Culvert Replacement Project 04/24/2017
Z 100 IDFG: Hwy 29 Culvert Replacement Construction Oversight 01/01/2017
AA 47 IDFG: Revegetate Eagle Valley Subreach 3 07/28/2017
AB 100 IDFG: Provide Construction oversight and management of Eagle Valley Subreach 3 01/01/2017
AC 29 IDFG: Install Large Woody Structures in Eagle Valley Subreach 3 08/23/2017
AD 30 IDFG: Construct side channel in Eagle Valley Subreach 3 08/23/2017
AE 174 LRLT - Big Timber 2 Produce Plan - Modeling of Project and Tech Team Presentations 03/01/2017
AF 175 LRLT - Big Timber 2 Diversion Removal Suite: final engineering 02/23/2017
AG 84 LRLT - Big Timber 2 Diversion Removal Suite: diversion removal
AH 84 LRLT - Big Timber 2 Diversion Removal Suite: alternate irrigation method
AI 29 LRLT - Big Timber 2 Diversion Removal Suite: install LWD
AJ 47 LRLT - Big Timber 2 Diversion Removal Suite: planting
AK 34 LRLT - Big Timber 2 Diversion Removal Suite: stockwater
AL 175 LRLT - Big Springs Restoration: final engineering 02/23/2017
AM 30 LRLT - Big Springs Restoration: create channel 10/23/2017
AN 29 LRLT - Big Springs Restoration: instream, bank, and floodplain complexity 10/23/2017
AO 47 LRLT - Big Springs Restoration: planting 10/23/2017
AP 40 LRLT - Big Springs Restoration: fence 10/23/2017
AQ 175 LRLT- Lemhi Fayle Restoration: final engineering 02/23/2017
AR 30 LRLT- Lemhi Fayle Restoration: create channel 07/13/2017
AS 29 LRLT- Lemhi Fayle Restoration: instream, bank, and floodplain complexity 07/13/2017
AT 47 LRLT - Lemhi Fayle Restoration: planting 07/13/2017
AU 40 LRLT - Lemhi Fayle Restoration: fence 07/13/2017
AV 184 LSWCD: Sandy Creek Culvert Replacement: Bridge installation 02/06/2017
AW 34 LSWCD - Sandy Creek Stockwater 05/02/2017
AX 157 IDFG: Monitoring-Install, operate, and maintain Lemhi River weir 07/14/2017
AY 157 IDFG: Monitoring-Collect and sample juvenile salmonids in Lemhi River watershed 07/14/2017
AZ 158 IDFG: Monitoring-Tag Chinook salmon captured at Lemhi River weir and remote surveys 07/14/2017
BA 158 IDFG: Monitoring-Tag steelhead captured at Lemhi River weir and remote surveys 07/14/2017
BB 158 IDFG: Monitoring-Tag Bull Trout captured at Lemhi River weir and remote surveys 01/30/2018
BC 158 IDFG: Monitoring-Tag Westslope Cutthroat Trout captured at Lemhi River weir and remote surveys 01/30/2018
BD 158 IDFG: Monitoring-Tag Oncorhynchus mykiss captured at Lemhi River weir and remote surveys 01/30/2018
BE 47 LSWCD: Purchase plants for 2018 planting 12/06/2017
BF 30 LSWCD: Eighteenmile Creek Restoration Beyeler - Channel Reconstruction 12/06/2017
BG 40 LSWCD: Eighteenmile Creek Restoration Beyeler- install fence 12/06/2017
BH 203 LSWCD: Little Sawmill Creek Irrigation Enhancement: Irrigation purchase 12/06/2017
BI 175 LRLT - Big Springs Restoration: draft engineering, Phase 2 12/06/2017