SOW Report
Contract 73548 REL 12: 2007-224-00 EXP IMPLEMENT OKANOGAN SUBBASIN PLAN
Project Number:
Title:
Okanogan Subbasin Habitat Implementation Program (OSHIP)
Stage:
Complete
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73548 REL 12
Contract Title:
2007-224-00 EXP IMPLEMENT OKANOGAN SUBBASIN PLAN
Contract Continuation:
Previous: Next:
72866: 2007-224-00 EXP IMPLMNT OKANOGAN SUBBASIN PLAN
  • 73548 REL 36: 2007-224-00 EXP IMPLEMENT OKANOGAN SUBBASIN PLAN
Contract Status:
Closed
Contract Description:
CCR-39701:

Change Request:  A contract modification with the contractor is necessary for the following reasons.  Add a design WE to SoW (AK), add milestones to WE-AD, canceled work (P, W, X, AA), de-obligate funding, adjust WE budgets up or down (numerous), and modified the LIB accordingly. This contracting action is necessary because the CCT’s engineer who was designing a culvert project resigned. In addition, landowner agreements were not secured for other WEs, therefore, work was canceled and thus funding needs to be de-obligated.
_________________________________________________________________________________________________________________________________________________________________________________________________________________________


The goal of this project is to implement the Okanogan Sub-Basin Plan.  The Sub-Basin Plan was developed to describe in detail the current state of the Okanogan Basin and then describe what are the limiting factors for anadromous salmonid production and survival.  Implementing the Sub-Basin Plan will require a sequenced set of key habitat restoration and protective actions.  The Okanogan River, Similkameen River and associated tributaries have several factors that limit salmonid production and rearing.  These factors include but are not limited to:  temperature, flow, habitat complexity, barriers, sedimentation and substrate.  We will be addressing limiting factors throughout the Okanogan River Basin, (main-stem and tributary portions)  by implementing a list of stream habitat restoration projects and developing feasibility plans on future projects.
Account Type(s):
Expense
Contract Start Date:
07/01/2017
Contract End Date:
06/30/2018
Current Contract Value:
$1,567,484
Expenditures:
$1,567,484

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Applicable permits and other environmental clearances received A: 165. Environmental Compliance 06/30/2018 06/30/2018
Manage and administer Project B: 119. Manage and Administer Project 06/30/2018 06/30/2018
Progress Report for the period 7/1/16 - 6/30/17 D: 132. Progress Report for the period 7/1/16 - 6/30/17 04/04/2018 04/04/2018
Develop Landowner contacts and participation in watershed forums E: 191. Contact Landowners and interested Public parties, attend meetings 06/30/2018 06/30/2018
Develop and negotiate water rights transaction F: 154. Develop water rights transactions 06/30/2018
Okanogan and Methow Basin instream flow acquisition G: 164. Okanogan and Methow Basin Water acquisition 06/30/2018
Okanagan Sub-basin design H: 175. Okanagan Sub-basin design in Canada 06/30/2018 06/30/2018
Beaver Relocation I: 190. Beaver relocation to headwaters of anadromous streams 06/30/2018 06/30/2018
Johnson Creek Streamflow Monitoring J: 157. Johnson Creek Streamflow Monitoring 06/30/2018 06/30/2018
Antoine Creek Streamflow Monitoring K: 157. Antoine Creek Streamflow Monitoring 06/30/2018 06/30/2018
Stapaloop and Swimptkin vegetation model L: 175. Stapaloop and Swimptkin vegetation model 06/30/2018 06/30/2018
Okanogan River stream-side planting M: 47. Okanogan River stream-side planting 06/30/2018 12/15/2017
Ninemile Creek stream habitat complexity N: 29. Ninemile Creek habitat complexity 02/28/2018 02/28/2018
Education about salmon recovery and habitat restoration O: 99. Watershed education 06/30/2018 06/30/2018
Johnson Creek diversion modification Q: 84. Johnson Creek diversion modification 06/30/2018
Pipe Johnson to Duck lake Canal R: 203. Pipe Johnson Creek Canal to Duck Lake 06/30/2018
EDT analysis scenarios S: 114. Continue EDT analysis scenarios 06/30/2018 06/30/2018
Okanogan River Screening T: 69. Okanogan River Diversion Screening 11/30/2017 11/30/2017
Johnson Creek HWY 97 Culvert designs U: 175. HWY 97 at Johnson Creek Culvert 06/30/2018
Green Acres Road Culvert designs V: 175. Greenacres road at Johnson Creek Culvert 06/30/2018
Mission Falls Boulder Removal Y: 85. Mission Falls Boulder removal 06/30/2018
WHS sediment abatement Z: 47. WHS sediment abatement 06/30/2018
Pre-Acquisition Activities AB: 172. Conduct Boundary Line Assessments and environmental assessments of potential property purchases 06/30/2018
Cultural Resource Surveys for habitat improvement projects AC: 165. Cultural Resource Surveys 06/30/2018
Property Appraisals AD: 172. Conduct Appraisals on potential property purchases 06/30/2018
Floodplain Habitat Design-Pharr Road AE: 175. Expand floodplain and side channel habitat designs for the Okanogan River-Pharr Road 06/30/2018
Floodplain Habitat Design-Shell Rock Point AF: 175. Expand floodplain and side channel habitat designs for the Okanogan River-Shell Rock Point 02/28/2018
Floodplain Habitat Design- Hegdale Site AG: 175. Expand floodplain and side channel habitat designs for the Okanogan River-Hegdale Site 06/30/2018
Floodplain Habitat Design-Klein Site AH: 175. Expand floodplain and side channel habitat designs for the Okanogan River-Klein Site 06/30/2018
Vegetation Planting in lower Omak Creek floodplain AJ: 47. Plant riparian vegetation throughout the Omak River Floodplain below Mission Falls 04/30/2018 04/30/2018
Antoine Creek Culvert removal design AK: 175. Antoine Creek Culvert Design 06/29/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 164 Acquire Water Instream
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 69 Install Fish Screen
  • 5 instances of WE 175 Produce Design
Sockeye (O. nerka) - Okanogan River ESU
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 2 instances of WE 203 Install Water Conservation Measure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 84 Remove/Install Diversion
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 2 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 9 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 154 Develop and Negotiate Water Right Transaction
  • 1 instance of WE 164 Acquire Water Instream

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 07/01/2017
B 119 Manage and Administer Project 07/01/2017
C 185 Periodic Status Reports for BPA 07/01/2017
D 132 Progress Report for the period 7/1/16 - 6/30/17 07/01/2017
E 191 Contact Landowners and interested Public parties, attend meetings 07/01/2017
F 154 Develop water rights transactions 07/01/2017
G 164 Okanogan and Methow Basin Water acquisition 07/01/2017
H 175 Okanagan Sub-basin design in Canada 07/01/2017
I 190 Beaver relocation to headwaters of anadromous streams 07/01/2017
J 157 Johnson Creek Streamflow Monitoring 08/30/2017
K 157 Antoine Creek Streamflow Monitoring 08/30/2017
L 175 Stapaloop and Swimptkin vegetation model 08/30/2017
M 47 Okanogan River stream-side planting 10/19/2017
N 29 Ninemile Creek habitat complexity 09/26/2017
O 99 Watershed education 07/01/2017
P 85 Antoine Creek Culvert Removal
Q 84 Johnson Creek diversion modification
R 203 Pipe Johnson Creek Canal to Duck Lake
S 114 Continue EDT analysis scenarios 07/01/2017
T 69 Okanogan River Diversion Screening 06/06/2018
U 175 HWY 97 at Johnson Creek Culvert 07/01/2017
V 175 Greenacres road at Johnson Creek Culvert 04/09/2018
W 29 Similkameen River log structures
X 55 Okanogan River Bank Sloping 10/19/2017
Y 85 Mission Falls Boulder removal 07/01/2017
Z 47 WHS sediment abatement
AA 203 Loup Loup Canal
AB 172 Conduct Boundary Line Assessments and environmental assessments of potential property purchases 07/01/2017
AC 165 Cultural Resource Surveys 07/01/2017
AD 172 Conduct Appraisals on potential property purchases 07/01/2017
AE 175 Expand floodplain and side channel habitat designs for the Okanogan River-Pharr Road 07/01/2017
AF 175 Expand floodplain and side channel habitat designs for the Okanogan River-Shell Rock Point 07/01/2017
AG 175 Expand floodplain and side channel habitat designs for the Okanogan River-Hegdale Site 07/01/2017
AH 175 Expand floodplain and side channel habitat designs for the Okanogan River-Klein Site 07/01/2017
AI 55 Omak Creek erosion and sediment control
AJ 47 Plant riparian vegetation throughout the Omak River Floodplain below Mission Falls 06/04/2018
AK 175 Antoine Creek Culvert Design 07/01/2017