Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77111 REL 5: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
77111 REL 5
Contract Title:
2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Continuation:
Previous: Next:
75002: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
  • 77111 REL 13: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Status:
Closed
Contract Description:
The overall goal of the Shoshone-Bannock Tribes is the recovery of Chinook salmon and Steelhead within the Salmon River Basin and the Columbia River Basin with the approach to protect, enhance, and restore habitats to sustain and recover native aquatic and terrestrial species diversity and abundance with emphasis on the recovery and delisting of Endangered Species Act listed species. One objective is to enhance these species populations to healthy levels that support Tribal Treaty and public harvest goals.  The Tribes interest is the protection and restoration of natural ecological functions and habitats. The Yankee Fork Restoration Project’s implementation objectives are to 1) reconnect historic channel and floodplain interaction, re-establish dynamic channel and floodplain interactions where they have been disconnected through  anthropogenic disturbances; 2) Floodplain enhancement and instream complexity, Re-establish channel dynamics and floodplain interactions by improving floodplain patch size, creating or improving side channel habitats, planting appropriate vegetation, placing large wood for fish cover and complexity, and constructing instream structures; 3) Adaptive Management, Monitor rehabilitated areas, and modify past rehabilitation actions to improve and/or diversify habitats and processes to maximize fish benefits.
The Tribes fish and wildlife programs will work synergistically to improve habitat conditions and improve fish abundance.  The Yankee Fork Inter-Disciplinary team along with the Tribes, has determined the short and long term goals of the Yankee Fork: short term goals involve restoration actions through 2018 (utilizing the Shoshone-Bannock Tribes Accord funds), which include implementing projects from the Tributary Assessment and Reach Assessments that identified the Dredged sections of Yankee Fork (Bonanza reach and Pole Flat reach) the most impacted and altered, therefore having the greatest potential for habitat restoration. The team is working on other funding sources to supplement the costs of the larger projects within the YFSR.
The Yankee Fork Restoration Project, as a part of the larger Yankee Fork Interdisciplinary team, has implemented five projects within the Yankee Fork drainage.  In 2012, Pond Series 3 Side Channel has filled in ponds to create .6 miles of side channel near Cearly Creek; 2013, the team created an additional side channel at Pond Series 2, improving year around flow; 2014, the Preachers Cove project installed LWD, boulders, and added spawning gravels--to add instream complexity to the straight and narrow near mile river 8; and in 2015-2016 the West Fork Yankee Fork confluence project relocated the confluence to its historic location, the river now has access to its historic floodplain and created three side channels; in 2017, the project teamed up to get implementation completed at Pond Series One with narrowing up the ponds, creating side channel with substrate. The next project will begin 2018-2019 with Bonanza City area. The Yankee Fork Restoration Project is working with the Yankee Fork Inter-Disciplinary team (BOR, TU, USFS, SBT, USFW, and others) to update the “working" Yankee Fork Master Plan; prioritizing the enhancement of in-stream diversity, floodplain function, re-connecting tributaries, etc. The team has an opportunity to continue implementing a projects through 2018. As a team, we are successfully moving forward with restoration actions within the Yankee Fork Salmon River; the Tribes have a long time understanding and previous commitments within the Yankee Fork drainage and look forward to continue working and having traditional and cultural significance increase within this drainage and throughout the Salmon River and Columbia River Basin.
The project will continue baseline data collection consisting of water quality data, physical and biological surveying. We will continue to collect data in the YFSR with the use of Sondes, temperature thermographs, discharge data-utilizing the USGS gauging station, and monitor fish activity/macro-invertebrate collections within rehabilitated/CHaMP sites. Water quality monitoring will include long term deployment of multi-parameter water quality monitors (Sondes) at three or more sites: Flat Rock, Bonanza Bridge, and West Fork Yankee Fork. The data collection of continuous water quality will begin April and continue through November. The Sondes will measure: pH, conductivity, temperature, turbidity, and dissolved oxygen and is dependent upon the stream conditions and storm events.  Temperature data will be collected throughout the Yankee Fork and tributaries. The project installs water thermal data loggers beginning in April and retrieves them in November as conditions permit, and will be collecting data throughout the year, at various sites. We will continue working with USGS to maintain the gauging station (13296200 Yankee Fork above Salmon River Confluence near Clayton, ID).  In 2011 a USGS gauging station was placed on the lower end of the Yankee Fork Salmon River; the USGS will maintain this station while publishing the data on the USGS website. Additionally, will be working with Biomark, Inc. to monitor fish utilizing the Pond Series 3 Side Channel implemented site.
Account Type(s):
Expense
Contract Start Date:
02/01/2018
Contract End Date:
01/31/2019
Current Contract Value:
$298,006
Expenditures:
$298,006

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Evelyn Galloway Shoshone-Bannock Tribes Yes Contract Manager egalloway@sbtribes.com (208) 239-4570
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Daniel Stone Shoshone-Bannock Tribes No Interested Party dstone@sbtribes.com (208) 239-4555
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance & Consultation Review B: 165. Verify all Environmental Compliance has been completed 01/31/2019 01/31/2019
Summarize meeting notes C: 191. Yankee Fork Interdisciplinary team and design Meetings 01/31/2019 01/31/2019
Snorkel CHaMP sites in the Yankee Fork Salmon River D: 157. Snorkel CHaMP sites 01/31/2019 09/30/2018
Macroinvertebrate sample collections E: 157. Collect macroinvertebrate at CHaMP sites 01/31/2019 01/31/2019
confirmation of data collection at end of field season F: 157. Collect Water Quality Data 01/31/2019 01/31/2019
Annual report G: 162. Analyze Water Quality 01/31/2019 01/31/2019
Confirm delivery of snorkel data in proper format to interested parties H: 161. Disseminate Snorkel Data 01/31/2019 01/31/2019
summarized water quality tabled to agencies I: 161. Disseminate water quality 01/31/2019 01/31/2019
Disseminate data from macroinvertebrate samples collected in the Yankee Fork drainage J: 161. Disseminate macroinvertebrate data 01/31/2019 01/31/2019
Effective implementation management and timely contract administration K: 119. Routine administration of contract 01/31/2019 01/31/2019
attach report to Pisces L: 132. Submit Progress Report for the period February 2017 to January 2018 to be completed in 2018 03/15/2018 03/15/2018
Attend trainings and conferences N: 99. Attend safety trainings and public outreach events 01/31/2019 01/31/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2018
B 165 Verify all Environmental Compliance has been completed 02/01/2018
C 191 Yankee Fork Interdisciplinary team and design Meetings 02/01/2018
D 157 Snorkel CHaMP sites 02/01/2018
E 157 Collect macroinvertebrate at CHaMP sites 02/01/2018
F 157 Collect Water Quality Data 02/01/2018
G 162 Analyze Water Quality 02/01/2018
H 161 Disseminate Snorkel Data 02/01/2018
I 161 Disseminate water quality 02/01/2018
J 161 Disseminate macroinvertebrate data 02/01/2018
K 119 Routine administration of contract 02/01/2018
L 132 Submit Progress Report for the period February 2017 to January 2018 to be completed in 2018 02/01/2018
M 132 Draft Progress Report for the period Feb 2018 to Jan 2019 02/01/2018
N 99 Attend safety trainings and public outreach events 02/01/2018