Contract 73982 REL 38: 1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E FY18
Project Number:
Title:
Umatilla Basin Natural Production Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
73982 REL 38
Contract Title:
1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E FY18
Contract Continuation:
Previous: Next:
73982 REL 9: 1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E FY17
  • 73982 REL 68: 1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E FY19
Contract Status:
Closed
Contract Description:
Natural Production Monitoring and Evaluation

The Natural Production Monitoring and Evaluation Project provides information to tribal, state and federal fisheries managers by monitoring tribal harvest, juvenile outmigration, water temperatures, age and growth, adult salmon passage, and natural spawning of salmon and steelhead in the Umatilla Basin.  To optimize efficiencies, these objectives will be conducted collaboratively with CTUIR’s Lamprey Project, CTUIR’s Habitat Project, CTUIR’s Passage Project.  CTUIR Artificial Production Project, CTUIR Biomonitoring Project (CHaMP and AEM), and ODFW’s Outmigration Monitoring Project.
Account Type(s):
Expense
Contract Start Date:
03/01/2018
Contract End Date:
02/28/2019
Current Contract Value:
$777,132
Expenditures:
$777,132

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Maintain ESA Permits and Complete Permit Annual Reports A: 165. Maintain existing permits & submit Annual ESA Permit Reports 02/28/2019 02/26/2019
Completed Spawning Survey Data Sets for Each Spawning Season B: 157. Spawning Surveys 02/28/2019 02/28/2019
Estimates of Tribal Harvest C: 157. Harvest Monitoring 02/28/2019 02/28/2019
Completed Scale Interpretation and Cataloging D: 157. Age, growth, and brood-year monitoring 02/28/2019 01/09/2019
Trap, tag, and recapture steelhead in Meacham Creek and the upper Umatilla River E: 157. Outmigration Monitoring 02/28/2019 02/28/2019
Water Temperature Data F: 157. Monitor Water Temperatures 01/31/2019 12/31/2018
Produce accessible, error-checked datasets G: 157. USGS Flow Gage Operations 02/28/2019 02/28/2019
Up to 7,000 Steelhead Pit Tagged I: 158. PIT tag up to 7,000 Steelhead 02/28/2019 02/28/2019
Maintain and Develop Accessible Databases J: 160. Manage and summarize data 02/28/2019 02/28/2019
Completed Data Analysis K: 162. Analyze fish data 12/28/2018 12/28/2018
Participate in UMMEOC and AOP L: 189. Participate in Umatilla Management Monitoring & Evaluation Oversight Committee (UMMEOC) and Um 02/28/2019 02/28/2019
Meacham Creek Water Quality ISCO Sampling and Lab Analysis M: 162. Laboratory Analsysis of Meacham Creek Water Qualtiy ISCO Samples 12/28/2018 12/28/2018
Project administration and coordination N: 119. Manage Projects and administrative duties 02/28/2019 02/28/2019
Upload completed 2017 Annual Report O: 132. 2017 Annual Report (January 2017 to December 2017) 03/15/2018 03/15/2018
Submit BiOp 2017 RPA Report in Taurus P: 202. Submit BiOp RPA Report for CY2017 and prepare draft CY2018 03/15/2018 03/15/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 6 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Maintain existing permits & submit Annual ESA Permit Reports 03/01/2018
B 157 Spawning Surveys 11/27/2017
C 157 Harvest Monitoring 11/27/2017
D 157 Age, growth, and brood-year monitoring 11/27/2017
E 157 Outmigration Monitoring 10/16/2018
F 157 Monitor Water Temperatures 11/29/2017
G 157 USGS Flow Gage Operations 11/29/2017
H 157 Salmon Passage Evaluations 10/16/2018
I 158 PIT tag up to 7,000 Steelhead 10/16/2018
J 160 Manage and summarize data 03/01/2018
K 162 Analyze fish data 03/01/2018
L 189 Participate in Umatilla Management Monitoring & Evaluation Oversight Committee (UMMEOC) and Um 03/01/2018
M 162 Laboratory Analsysis of Meacham Creek Water Qualtiy ISCO Samples 03/01/2018
N 119 Manage Projects and administrative duties 03/01/2018
O 132 2017 Annual Report (January 2017 to December 2017) 03/01/2018
P 202 Submit BiOp RPA Report for CY2017 and prepare draft CY2018
Q 185 Quarterly Status Reports 03/01/2018