Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77111 REL 1: 2007-402-00 EXP SBT SNAKE RIVER SOCKEYE HABITAT
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
77111 REL 1
Contract Title:
2007-402-00 EXP SBT SNAKE RIVER SOCKEYE HABITAT
Contract Continuation:
Previous: Next:
74770: 2007-402-00 EXP SHO BAN SNAKE RIVER SOCKEYE HABITAT
  • 77111 REL 11: 2007-402-00 EXP SBT SNAKE RIVER SOCKEYE M&E/HABITAT
Contract Status:
Closed
Contract Description:
Goal:  To assess habitat limitations as it pertains to Snake River sockeye salmon Oncorhynchus nerka preservation and recovery, to implement activities necessary to increase and\or reestablish O. nerka productivity in nursery areas in the historic range of Snake River sockeye salmon, and to investigate fish community dynamics in lake nursery areas, including interactions between resident and anadromous O. nerka in present or potential Sawtooth Valley production areas.  We will collaborate with the IDFG to determine release strategies, and assess fish performance from introduction into the lakes up through smolt migration. And provide input to the Technical Oversight Committee for annual strategies regarding the fate of returning adults.

Project objectives include: 1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; 2) monitor sockeye salmon smolt migration from the production of wild/natural adults in Pettit and Alturas lakes;  3) monitor the number of mature kokanee spawning in Fishhook Creek and estimate fry recruitment in Fishhook and Alturas Lake creeks; 4) conduct sockeye and kokanee salmon population surveys; 5) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Pettit, and Alturas lakes; and 6) assist IDFG with captive broodstock production activities and supply IDFG with requested RM&E and RPA/BiOp data.
Account Type(s):
Expense
Contract Start Date:
12/01/2017
Contract End Date:
11/30/2018
Current Contract Value:
$572,576
Expenditures:
$572,575

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Kendra Eaton Shoshone-Bannock Tribes Yes Technical Contact keaton@sbtribes.com (208) 478-4048
Melissa Evans Shoshone-Bannock Tribes Yes Technical Contact mevans@sbtribes.com (208) 681-6975
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Elsha Leavitt Shoshone-Bannock Tribes No Interested Party eleavitt@sbtribes.com (208) 478-3795
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Jenna Peterson Bonneville Power Administration No Interested Party jepeterson@bpa.gov (503) 230-3018
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Kurt Tardy Shoshone-Bannock Tribes Yes Contract Manager ktardy@sbtribes.com (208) 239-4562
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821
Pam Waterhouse Shoshone-Bannock Tribes Yes Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Diana Yupe Shoshone-Bannock Tribes Yes Administrative Contact dyupe@sbtribes.com (208) 478-3790
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
NEPA compliance, NOAA and IDEQ permit reports submitted A: 165. NEPA clearance, NOAA/DEQ Permits 11/30/2018 11/30/2018
Snake River sockeye RPA/BiOp data submission to IDFG project leader B: 202. Snake River sockeye RPA/BiOp Data 02/28/2018 02/27/2018
Complete collection of all limnological variables C: 157. Complete data collection for all limnological variables 11/30/2018 11/15/2018
Evaluate sockeye salmon smolt migrations D: 157. Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 07/15/2018 06/30/2018
PIT Tag sockeye smolts E: 158. PIT Tag sockeye salmon smolts 06/15/2018 05/30/2018
Complete all adult spawning and hydroacoustic surveys F: 157. Estimate O. nerka populations in three Sawtooth Valley lakes 11/30/2018 11/09/2018
Near final weir designs and environmental compliance list G: 175. Intermediate weir designs for Alturas and Pettit Lake creeks 08/15/2018 08/15/2018
Monitor and download data from PIT tag arrays in Pettit and Alturas creeks. H: 157. Monitor PIT tag arrays for returning adult sockeye salmon 11/15/2018 11/15/2018
Complete all milestones I: 162. Provide recommendations on lake fertilization and fish stocking 11/30/2018 11/15/2018
Fertilization of selected lakes J: 44. Nutrient Enhancement 10/30/2018 10/30/2018
Attend and Participate in TOC meetings K: 191. Stanley Basin Sockeye Technical Oversight Committee Meetings 11/30/2018 11/14/2018
Completed Annual Report L: 132. Submit Progress Report for the period 1.01.2016 to 12.31.2016 01/31/2018 12/01/2017
Completed Annual Report M: 132. Submit Progress Report for the period 1.01.2017 to 12.31.2017 10/02/2018 09/27/2018
Contract package (SOW, budget and property inventory) N: 119. Manage and Administer contract associated with SBT Snake River Sockeye Habitat Project 10/16/2018 11/16/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 1 instance of WE 175 Produce Design
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA clearance, NOAA/DEQ Permits 01/01/2018
B 202 Snake River sockeye RPA/BiOp Data
C 157 Complete data collection for all limnological variables 08/18/2017
D 157 Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 08/18/2017
E 158 PIT Tag sockeye salmon smolts 08/18/2017
F 157 Estimate O. nerka populations in three Sawtooth Valley lakes 08/18/2017
G 175 Intermediate weir designs for Alturas and Pettit Lake creeks 08/18/2017
H 157 Monitor PIT tag arrays for returning adult sockeye salmon 10/13/2017
I 162 Provide recommendations on lake fertilization and fish stocking 01/01/2018
J 44 Nutrient Enhancement 08/18/2017
K 191 Stanley Basin Sockeye Technical Oversight Committee Meetings 01/01/2018
L 132 Submit Progress Report for the period 1.01.2016 to 12.31.2016 12/01/2017
M 132 Submit Progress Report for the period 1.01.2017 to 12.31.2017 01/01/2018
N 119 Manage and Administer contract associated with SBT Snake River Sockeye Habitat Project 01/01/2018
O 185 Periodic Status Reports for BPA 01/01/2018