Completed NEPA Checklist |
A: 165. NEPA analysis and documentation |
|
04/30/2019 |
04/30/2019 |
Selection of Restoration Projects |
B: 114. Identify and select new restoration projects in the Hangman watershed |
|
04/30/2019 |
04/30/2019 |
Activation of engineered channel |
C: 29. Activate historical channels on lower Sheep Creek |
|
04/30/2019 |
09/28/2018 |
Enhanced Floodplain Communities on Hangman Creek |
D: 47. Riparian enhancement at Hangman Creek, Phase 3: EPA Grant |
|
04/30/2019 |
05/25/2018 |
Newly planted riparian plants maintained, protected, and or replaced |
E: 198. Maintain vegetation on Hangman Creek, Phases 1-4 |
|
04/30/2019 |
04/30/2019 |
Newly planted riparian plants maintained, protected, and or replaced |
F: 198. Maintain vegetation on Hangman Creek, Sweatlodge |
|
04/30/2019 |
04/30/2019 |
Newly planted riparian plants maintained, protected, and or replaced |
G: 198. Maintain vegetation on Sheep Creek |
|
04/30/2019 |
04/30/2019 |
Provide dam building materials for 6 dams |
H: 186. Maintain beaver dams in Hangman Creek with hardwood supplementation |
|
04/30/2019 |
04/26/2019 |
Raw Bank Treated with Bioengineering on Hangman Creek, Phase 2 |
I: 55. Treat stream banks on Hangman Creek using bioengineering |
|
04/30/2019 |
04/30/2019 |
Installation of Wildlife Exclusion Measures |
J: 40. Install wildlife exclusion fencing on Hangman Creek |
|
09/21/2018 |
09/14/2018 |
Produce data from redband trout captured in migrant traps in Hangman Creek watershed |
K: 157. Sample Redband trout and non-native salmonids using migration traps |
|
04/30/2019 |
04/30/2019 |
Produce Data from Electroshock Sampling of Fish in Hangman Watershed |
L: 157. Sample Redband trout in Hangman Creek using electroshocking |
|
04/30/2019 |
03/29/2019 |
PIT-tag juvenile and adult redband trout in Hangman Creek project area. |
M: 158. Uniquely mark redband trout in Upper Hangman |
|
04/30/2019 |
04/30/2019 |
Removal of non-native cutthroat trout from Nehchen Creek |
N: 190. Remove non-native cutthroat trout from Nehchen Creek |
|
04/30/2019 |
04/30/2019 |
Collect Water Quality Data in the Hangman Creek Watershed |
O: 157. Collect water quality and quantity data in Hangman Creek |
|
04/30/2019 |
04/30/2019 |
Collect Continuous Temperature Data in the Hangman Creek Watershed |
P: 157. Monitor water temperature in Hangman Creek |
|
04/30/2019 |
04/30/2019 |
Collect Interrogation Data from Stationary PIT tag Antenna Arrays in the Hangman Creek Watershed |
Q: 157. Collect data and maintain fixed PIT tag antennae arrays |
|
04/30/2019 |
04/30/2019 |
Examination of distribution and density patterns at the sub-watershed and watershed scale |
R: 162. Analyze data generated from sampling salmonids in tributary habitats in upper Hangman watershed |
|
04/30/2019 |
04/30/2019 |
Abundance and life-history information for migratory redband trout in upper Hangman |
S: 162. Analyze data generated for redband trout captured in migrant traps in Hangman Creek |
|
04/30/2019 |
04/30/2019 |
Pit Tag Array Data Analyzed |
T: 162. Analyze data logged at stationary PIT antenna arrays for Redband trout in Hangman Creek |
|
04/30/2019 |
04/30/2019 |
Water Temperature Analyzed |
U: 162. Analyze stream temperature data in Hangman Creek |
|
04/30/2019 |
04/30/2019 |
GIS Summarization of Project Data Collected and Updated Trout Distribution for input to Regional Map |
V: 161. Summarize Redband trout population status and habitat in Hangman Creek using GIS |
|
04/30/2019 |
04/30/2019 |
Coordination of RM&E and Restoration for Redband partners in the Upper Columbia basin |
W: 191. Coordinate restoration and RM&E with Upper Columbia and Spokane Sub-basin partners |
|
04/30/2019 |
04/30/2019 |
Management and Administration of Project |
Z: 119. Manage and administer project |
|
04/30/2019 |
04/30/2019 |