Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 88322: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
88322
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED - UCD
Contract Continuation:
Previous: Next:
85431: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
  • 90647: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
Contract Status:
Closed
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District (UCD), US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues Underwood Conservation District's support and participation in the project.  UCD will provide habitat restoration work in support of the recovery of the Wind River summer steelhead stock in 2021 and 2022.  Work will focus on finalizing design plans and permitting for the Stabler Bend side channel enhancement project, the highest priority project in the watershed, as identified in the Wind River Habitat Restoration Strategy (LCFRB 2017, https://www.lcfrb.gen.wa.us/windriver).  Additional work involves removing noxious weed vegetation at the Stabler Bend project site, in preparation for construction in 2022 (construction was delayed one year due to lack of construction funds).  As Skamania County continues to plan and implement High Bridge Park improvements to prevent erosion and turbidity and restore riparian vegetation along the mainstem of the Wind River (at one of the only access points along the Wind River canyon, a priority migratory and rearing reach for steelhead), UCD will continue to provide technical assistance and support toward riparian habitat improvement and best practices.  Other work such as participating in the ISRP habitat category review process, producing periodic (quarterly) status reports, the annual progress report, coordinating with project partners, producing environmental compliance documentation, stream temperature monitoring, as well as managing and administering the project will be funded at levels to allow continued maintenance of these activities.

Future projects have been identified and are being developed with partners and landowners, and UCD will coordinate closely with BPA to plan future project work for subsequent contract renewals.  UCD prioritizes projects that were identified and prioritized during the creation of the Wind River Habitat Restoration Strategy in 2017 (https://www.lcfrb.gen.wa.us/windriver).  However, UCD’s work on habitat restoration is influenced by many factors, including input from BPA, and watershed partners, USFS, USGS, and WDFW.  Additional issues such as feasibility, access, funding, permitting, and landowner readiness often dictate which projects can move forward.  

UCD's work benefits greatly through coordination and information sharing with BPA partners, USGS, WDFW, and USFS.  The RME partners provide integral information on fish use and abundance, habitat bottlenecks and capacity constraints.  This local expertise ensures that 1.) we are prioritizing habitat work where it is needed most and provides the biggest lift for steelhead, and 2.) we are able to get feedback and even biological monitoring in some cases, showing the effectiveness of restoration work.  In addition, coordination with USFS partners ensures that 1.) we can coordinate and partner on key, high priority projects, and 2.) we can share expertise and lessons learned about project methodologies for best results in the watershed.    
Account Type(s):
Expense
Contract Start Date:
07/01/2021
Contract End Date:
06/30/2022
Current Contract Value:
$80,480
Expenditures:
$80,480

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Lindsey Arotin Bonneville Power Administration Yes Env. Compliance Lead ldarotin@bpa.gov (503) 230-4039
Joshua Ashline Bonneville Power Administration Yes COR jdashline@bpa.gov (503) 230-3862
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Ann Gross Underwood Conservation District (UCD) Yes Administrative Contact ann@ucdwa.org (509) 493-1936
Carly Lemon Underwood Conservation District (UCD) No Technical Contact carly@ucdwa.org (509) 493-1936
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Paul Newell Underwood Conservation District (UCD) No Supervisor pnewell@embarqmail.com (509) 493-1936
Dan Richardson Underwood Conservation District (UCD) Yes Technical Contact dan@ucdwa.org (509) 493-1936
Jan Thomas Underwood Conservation District (UCD) Yes Technical Contact jan@ucdwa.org (509) 493-1936
Tova Tillinghast Underwood Conservation District (UCD) Yes Contract Manager tova@ucdwa.org (509) 493-1936
Jesse Wilson Bonneville Power Administration Yes F&W Approver jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance is Complete A: 165. Environmental Compliance 06/30/2022 06/30/2022
Share Project Information B: 191. Share Project Activities Updates with Project Partners 06/30/2022 06/30/2022
Updated project list for future years C: 114. Identify and Develop Potential Steelhead Habitat Restoration Projects 06/30/2022 06/30/2022
Support site enhancement at High Bridge Park D: 122. Enhance Steelhead Habitat at High Bridge (carried forward from previous contract) 06/30/2022 06/30/2022
Stabler Bend design complete to 100% final design level E: 175. Stabler Bend Side Channel Project 80-100% Design (carried forward from prior contract) 06/30/2022
Noxious weeds treated at Stabler Bend F: 199. Stabler Bend Weed Treatment (carried forward from previous contract) 06/30/2022 06/30/2022
Temperature and stage data collected, stored in Water Quality Database G: 157. Water Quality and Stage Monitoring 06/30/2022 06/30/2022
Deliverable: Receipt of NPCC Recommendation for Anadromous Fish Habitat and Artificial Production Review H: 141. Other Reports for BPA and NPCC/ISRP Process 06/30/2022 02/16/2022
Submit calendar-year annual report for 2021 I: 132. Submit Progress Report for the Period Jan 01, 2021 - Dec 31, 2021 04/29/2022
Manage Project K: 119. Manage and Administer Projects 06/30/2022 06/30/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance
B 191 Share Project Activities Updates with Project Partners
C 114 Identify and Develop Potential Steelhead Habitat Restoration Projects
D 122 Enhance Steelhead Habitat at High Bridge (carried forward from previous contract)
E 175 Stabler Bend Side Channel Project 80-100% Design (carried forward from prior contract)
F 199 Stabler Bend Weed Treatment (carried forward from previous contract) 03/16/2022
G 157 Water Quality and Stage Monitoring 02/12/2021
H 141 Other Reports for BPA and NPCC/ISRP Process
I 132 Submit Progress Report for the Period Jan 01, 2021 - Dec 31, 2021
J 185 Periodic Status Reports for BPA
K 119 Manage and Administer Projects