Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84042 REL 4: 2010-050-00 EXP EVALUATION OF TUCANNAN ENDEMIC STOCK FY 22
Project Number:
Title:
Tucannon River Steelhead Supplementation Monitoring & Evaluation (M&E)
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
84042 REL 4
Contract Title:
2010-050-00 EXP EVALUATION OF TUCANNAN ENDEMIC STOCK FY 22
Contract Continuation:
Previous: Next:
74314 REL 133: 2010-050-00 EXP EVALUATION OF TUCANNAN ENDEMIC STOCK FY 21
  • 84042 REL 41: 2010-050-00 EXP EVALUATION OF TUCANNAN ENDEMIC STOCK FY 23
Contract Status:
Closed
Contract Description:
Background: In 2010, after a ten-year evaluation by WDFW of an endemic stock test-program in the Tucannon River, state and tribal co-managers (Nez Perce and Umatilla), supported by the Lower Snake River Compensation Program (LSRCP), agreed to implement an endemic steelhead supplementation program. Concurrent with that decision, releases of Lyons Ferry stock steelhead into the Tucannon River were stopped as a harvest mitigation program (under the LSRCP). These actions are consistent with the recommendations of the recently completed HSRG (2009) and HRT (2009) hatchery reviews; and supported by the direction of NOAA Fisheries in the 2008 Biological Opinion (BiOp), the 2017 Biological Opinion (BiOp) to implement the Tucannon River endemic steelhead hatchery supplementation program (RPA 40.2). NOAA Fisheries recently consultation on this program and approved Section 10 Permit #18025 for this program. These Hatchery RPAs, were not continued in the new NOAA CRS BiOp, however Fish in M&E was continued and funding is maintained to support HGMP BiOp requirements and LSRCP program tasks.

The primary goal of this hatchery supplementation program will be to increase total abundance of spawning steelhead and for the long-term conservation of natural origin summer steelhead in the Tucannon River. A second goal is to provide harvest as part of the LSRCP mitigation program in the Tucannon River, once the endemic hatchery program is expanded to full production (150,000 smolts annually).

Purpose: This project was initiated to provide support for the level of monitoring and evaluation sufficient to determine if the supplementation program goals are being met.

Note: Changes in the hatchery program will require facility modifications to provide additional rearing space at Lyons Ferry Hatchery to accommodate the planned expansion in production; actions to modify the hatchery are expected to occur through agreements with LSRCP and BPA, but are still pending [March 2018].
Account Type(s):
Expense
Contract Start Date:
07/01/2022
Contract End Date:
06/30/2023
Current Contract Value:
$252,852
Expenditures:
$252,852

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Joe Bumgarner Washington Department of Fish and Wildlife (WDFW) Yes Supervisor joseph.bumgarner@dfw.wa.gov (509) 382-1710
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Bonnie Greeninger Bonneville Power Administration Yes Contracting Officer begreeninger@bpa.gov (360) 619-6596
Heidi Haak Bonneville Power Administration No CO Assistant hlhaak@bpa.gov (541) 922-6856
Michael Herr Washington Department of Fish and Wildlife (WDFW) Yes Supervisor michael.herr@dfw.wa.gov (509) 751-0823
Janice Jackson Washington Department of Fish and Wildlife (WDFW) Yes Administrative Contact janice.jackson@dfw.wa.gov (360) 902-2444
Kristen Jule Bonneville Power Administration Yes F&W Approver krjule@bpa.gov (503) 230-3588
Todd Kassler Washington Department of Fish and Wildlife (WDFW) No Interested Party Todd.Kassler@dfw.wa.gov (360) 902-2722
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Todd Miller Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager todd.miller@dfw.wa.gov (509) 382-1710
Jessica Power Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Russell Scranton Bonneville Power Administration Yes COR rwscranton@bpa.gov (503) 230-4412
Todd (WDFW) Seamons Washington Department of Fish and Wildlife (WDFW) No Interested Party todd.seamons@dfw.wa.gov (360) 902-2765


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management; timely contract administration B: 119. Project Implementation Management and Contract Administration 06/30/2023 06/30/2023
Timely and successful compliance documentation and clearance C: 165. Environmental Compliance 06/30/2023 06/30/2023
Finalize Technical Progress Report (calendar-year) D: 132. WDFW will produce an annual technical progress report for the work completed, showing cumulative results and synthesis for the duration data collection/analysis studies. BPA needs to have the reports fi 05/31/2023
Produce In-hatchery assessment accessible, error-checked data sets & metadata E: 157. Monitor spawning and survival of hatchery steelhead at Lyons Ferry and Tucannon FH 06/30/2023 06/30/2023
Mark and Tag Supplementation Steelhead for Program Evaluation F: 158. Coded-Wire Tag Hatchery and PIT-Tag juvenile Hatchery Summer Steelhead 02/28/2023 02/28/2023
PIT tag hatchery-origin spring Chinook for Program Evaluation G: 158. PIT-Tag Tucannon River Juvenile Hatchery Spring Chinook 02/01/2023 02/01/2023
Tag Natural Origin Tucannon summer Steelhead for Program Evaluation H: 158. PIT Tag natural origin steelhead at the Tucannon River Smolt Trap 06/30/2023 06/30/2023
Maintain PIT Array Sites and Produce accessible, error-checked data sets with metadata I: 157. Maintain PIT Tag Arrays on the Tucannon River 06/30/2023 06/30/2023
Produce accessible, error-checked data sets & metadata that describes the summer steelhead return to Tucannon FH J: 157. Trap adult steelhead at the Tucannon Hatchery Trap 06/30/2023 06/30/2023
Tag adult Steelhead spawners for Program Evaluation K: 158. Tag Adult Steelhead at the Weir 06/30/2023 06/30/2023
Produce accessible, error-checked data sets with metadata to estimate adult returns/escapement and spatial distribution to the Tucannon River L: 162. Estimate adult returns/escapement and describe spatial distribution of summer steelhead (all groups) to the Tucannon River 04/01/2023 04/01/2023
Produce accessible, error-checked datasets M: 157. Genotype DNA Samples from Snake River Fall Chinook 06/30/2023 06/30/2023
Produce accessible, error-checked data sets with metadata N: 157. WDFW Steelhead Residualism Surveys in the Tucannon River 06/30/2023 06/30/2023
Deliverable: An accessible, error-checked data set with metadata O: 162. WDFW Steelhead Residualism Analysis in the Tucannon River 06/30/2023 06/30/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Project Implementation Management and Contract Administration
C 165 Environmental Compliance
D 132 WDFW will produce an annual technical progress report for the work completed, showing cumulative results and synthesis for the duration data collection/analysis studies. BPA needs to have the reports fi
E 157 Monitor spawning and survival of hatchery steelhead at Lyons Ferry and Tucannon FH 05/10/2022
F 158 Coded-Wire Tag Hatchery and PIT-Tag juvenile Hatchery Summer Steelhead 05/10/2022
G 158 PIT-Tag Tucannon River Juvenile Hatchery Spring Chinook 05/10/2022
H 158 PIT Tag natural origin steelhead at the Tucannon River Smolt Trap 05/10/2022
I 157 Maintain PIT Tag Arrays on the Tucannon River 05/10/2022
J 157 Trap adult steelhead at the Tucannon Hatchery Trap 05/10/2022
K 158 Tag Adult Steelhead at the Weir 05/10/2022
L 162 Estimate adult returns/escapement and describe spatial distribution of summer steelhead (all groups) to the Tucannon River
M 157 Genotype DNA Samples from Snake River Fall Chinook 05/10/2022
N 157 WDFW Steelhead Residualism Surveys in the Tucannon River 05/10/2022
O 162 WDFW Steelhead Residualism Analysis in the Tucannon River