Contract 74314 REL 146: 2010-070-00 EXP WA ESTUARY MOU (WDFW)
Project Number:
Title:
Lower Columbia River Estuary Scoping & Implementation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 100.00%
Contract Number:
74314 REL 146
Contract Title:
2010-070-00 EXP WA ESTUARY MOU (WDFW)
Contract Continuation:
Previous: Next:
74314 REL 115: 2010-070-00 EXP WA ESTUARY MOA PROJECT (WDFW)
Contract Status:
Closed
Contract Description:
The federal Action Agencies that operate the Federal Columbia River Power System (FCRPS) have asked the state of Washington to join in a partnership to expedite habitat restoration efforts for salmon and steelhead in the Columbia River Estuary below Bonneville Dam. On  September 16, 2009, the Washington Governor and Director of Washington Department of Fish and Wildlife (WDFW) signed the Estuary Habitat Memorandum of Agreement (Estuary MOA) with the Action Agencies. The Estuary MOA established a nine-year funding arrangement for habitat restoration in the lower Columbia River and tidally influenced tributaries – from Bonneville Dam to the mouth of the Columbia River where it flows into the Pacific Ocean. In April 2020, an Memorandum of Understanding (MOU) was established between Washington and BPA to extend the partnership through 2023.

During this contract period, WDFW will: coordinate tasks for the Chinook Estuary restoration work, South Unit Shillapoo and Buckmire Slough Restoration Project, initialize post-project monitoring for the South Bachelor Island Restoration Project, continue support of restoration projects previously completed, and evaluate additional projects if the opportunities arise. Key tasks include concept design, permitting, AEMR, maintaining fish access to restoration projects, public involvement, and evaluation of project needs.
Account Type(s):
Expense
Contract Start Date:
09/01/2021
Contract End Date:
08/31/2022
Current Contract Value:
$393,698
Expenditures:
$393,698

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration B: 119. BPA administrative tasks for contract 08/31/2022 08/30/2022
Environmental compliance is complete C: 165. Environmental Compliance 08/31/2022 08/31/2022
Determine feasibility of proposed WDFW projects D: 114. Evaluate potential estuary restoration projects 08/31/2022 08/31/2022
Maintain tide gate at Chinook estuary site E: 186. CHINOOK-- Tide Gate Management 08/31/2022 08/31/2022
Remove invasive plant species F: 199. CHINOOK-- Remove Invasive Species 08/31/2022 08/31/2022
Native plants and seeds planted H: 47. CHINOOK-- Replant native vegetation 08/31/2022 02/04/2022
Provide results of genetic analysis of fish in Chinook I: 162. CHINOOK -- Fish Genetic Analysis 08/31/2022 08/31/2022
Maintain site conditions at S. Bachelor Island J: 186. SOUTH BACHELOR ISLAND-- Maintain habitat 08/31/2022 08/31/2022
Monitor South Bachelor Island K: 157. SOUTH BACHELOR ISLAND-- Evaluate habitat 08/31/2022 08/31/2022
Produce 20% Design for South Unit Shillapoo L: 175. SOUTH UNIT SHILLAPOO-- Produce 20% Design 08/31/2022
Provide Public and Stakeholder Outreach M: 99. SOUTH UNIT SHILLAPOO-- Public and stakeholder outreach 08/31/2022 08/31/2022
Continue to collect groundwater data N: 157. SOUTH UNIT SHILLAPOO--Collect Pre-restoration groundwater data 08/31/2022 08/31/2022
Produce accessible, error-checked datasets for Level 3 AEMR sites and deliver to LCEP O: 157. LEVEL 3 AEMR--Pre and post construction AEMR 08/31/2022 08/31/2022
Completed Annual Report P: 132. Submit Progress Report for the period (Sep 2020) to (Aug 2021) 12/31/2021 12/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 BPA administrative tasks for contract
C 165 Environmental Compliance
D 114 Evaluate potential estuary restoration projects
E 186 CHINOOK-- Tide Gate Management 05/20/2021
F 199 CHINOOK-- Remove Invasive Species 06/16/2021
G 186 CHINOOK -- Maintain Fencing 12/16/2022
H 47 CHINOOK-- Replant native vegetation 06/16/2021
I 162 CHINOOK -- Fish Genetic Analysis
J 186 SOUTH BACHELOR ISLAND-- Maintain habitat 09/01/2021
K 157 SOUTH BACHELOR ISLAND-- Evaluate habitat 09/01/2021
L 175 SOUTH UNIT SHILLAPOO-- Produce 20% Design
M 99 SOUTH UNIT SHILLAPOO-- Public and stakeholder outreach
N 157 SOUTH UNIT SHILLAPOO--Collect Pre-restoration groundwater data 09/22/2020
O 157 LEVEL 3 AEMR--Pre and post construction AEMR 05/20/2021
P 132 Submit Progress Report for the period (Sep 2020) to (Aug 2021)