Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 153: 1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E 22
Project Number:
Title:
Umatilla Basin Natural Production Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
73982 REL 153
Contract Title:
1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E 22
Contract Continuation:
Previous: Next:
73982 REL 127: 1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E 2021
  • 73982 REL 182: 1990-005-01 EXP UMATILLA NATURAL PRODUCTION M&E 23
Contract Status:
Closed
Contract Description:
The Natural Production Monitoring and Evaluation Project provides information to tribal, state and federal fisheries managers by monitoring tribal harvest, juvenile outmigration, water temperatures, age and growth, adult salmon passage, and natural spawning of salmon and steelhead in the Umatilla Basin. To optimize efficiencies, these objectives are conducted collaboratively with CTUIR’s Lamprey Project, CTUIR’s Habitat Project, CTUIR’s Passage Project. CTUIR Artificial Production Project, CTUIR Biomonitoring Project, and ODFW’s Outmigration Monitoring Project.
Account Type(s):
Expense
Contract Start Date:
03/01/2022
Contract End Date:
02/28/2023
Current Contract Value:
$1,015,103
Expenditures:
$1,015,103

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Maintain ESA Permits and Complete Permit Annual Reports A: 165. Maintain existing permits & submit Annual ESA Permit Reports 02/28/2023 02/28/2023
Completed Spawning Survey Data Sets for Each Spawning Season B: 157. Redd Surveys 02/28/2023 02/28/2023
Estimates of Tribal Harvest C: 157. Harvest Monitoring 02/28/2023 02/28/2023
Completed Scale Collection, Mounting, Interpretation and Cataloging D: 157. Age, growth, and brood-year monitoring 10/28/2022 10/28/2022
Trap, tag, and recapture steelhead in Meacham Creek and the upper Umatilla River E: 157. Outmigration Monitoring 02/28/2023 02/28/2023
Produce accessible, error-checked datasets F: 157. Track Tagged Steelhead 12/30/2022 12/30/2022
Produce accessible, error-checked datasets G: 157. Fish Passage Impediment Survey 12/30/2022 12/30/2022
Water Temperature Data H: 157. Monitor Water Temperatures 01/11/2023 01/11/2023
Produce accessible, error-checked datasets I: 157. USGS Flow Gage Operations 02/28/2023 02/28/2023
PIT tag up to 7,000 Steelhead J: 158. PIT tag up to 7,000 Steelhead 02/28/2023 02/28/2023
Tag adult hatchery steelhead with radio and PIT tags K: 158. Radio Tag and PIT tag adult steelhead 02/17/2023 03/01/2022
Maintain and Develop Accessible Databases L: 160. Manage and summarize data 02/28/2023 02/28/2023
Completed Data Analysis M: 162. Analyze fish data 01/13/2023 01/13/2023
Participate in UMMEOC and AOP N: 189. Participate in Umatilla Management Monitoring & Evaluation Oversight Committee (UMMEOC) and Um 12/31/2022 12/30/2022
Project administration and coordination O: 119. Manage Projects and administrative duties 02/28/2023 02/28/2023
Completed Annual Report P: 132. 2021 Annual Report (January 2021 to December 2021) 03/15/2022 03/15/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Maintain existing permits & submit Annual ESA Permit Reports
B 157 Redd Surveys 11/30/2021
C 157 Harvest Monitoring 11/30/2021
D 157 Age, growth, and brood-year monitoring 11/30/2021
E 157 Outmigration Monitoring 11/30/2021
F 157 Track Tagged Steelhead 11/30/2021
G 157 Fish Passage Impediment Survey 11/30/2021
H 157 Monitor Water Temperatures 11/30/2021
I 157 USGS Flow Gage Operations 11/30/2021
J 158 PIT tag up to 7,000 Steelhead 11/30/2021
K 158 Radio Tag and PIT tag adult steelhead 11/30/2021
L 160 Manage and summarize data
M 162 Analyze fish data
N 189 Participate in Umatilla Management Monitoring & Evaluation Oversight Committee (UMMEOC) and Um
O 119 Manage Projects and administrative duties
P 132 2021 Annual Report (January 2021 to December 2021)
Q 185 Quarterly Status Reports